474
Views
24
CrossRef citations to date
0
Altmetric
Original Articles

A three-stage decomposition approach for energy-aware scheduling with processing-time-dependent product quality

, &
Pages 3073-3091 | Received 08 Oct 2015, Accepted 14 Sep 2016, Published online: 24 Oct 2016

References

  • Bruzzone, A. A. G., D. Anghinolfi, M. Paolucci, and F. Tonelli. 2012. “Energy-aware Scheduling for Improving Manufacturing Process Sustainability: A Mathematical Model for Flexible Flow Shops.” CIRP Annals-Manufacturing Technology 61: 459–462.10.1016/j.cirp.2012.03.084
  • Dai, Min, Dunbing Tang, Adriana Giret, Miguel A. Salido, and W. D. Li. 2013. “Energy-efficient Scheduling for a Flexible Flow Shop using an Improved Genetic-simulated Annealing Algorithm.” Robotics and Computer-Integrated Manufacturing 29: 418–429.10.1016/j.rcim.2013.04.001
  • Fang, Kan, Nelson Uhan, Fu Zhao, and John W. Sutherland. 2011. “A New Approach to Scheduling in Manufacturing for Power Consumption and Carbon Footprint Reduction.” Journal of Manufacturing Systems 30: 234–240.10.1016/j.jmsy.2011.08.004
  • Fernandez, Mayela, Lin Li, and Zeyi Sun. 2013. “’Just-for-Peak’ Buffer Inventory for Peak Electricity Demand Reduction of Manufacturing Systems.” International Journal of Production Economics 146 (1): 178–184.10.1016/j.ijpe.2013.06.020
  • Gahm, Christian, Florian Denz, Martin Dirr, and Axel Tuma. 2016. “Energy-efficient Scheduling in Manufacturing Companies: A Review and Research Framework.” European Journal of Operational Research 248 (3): 744–757.10.1016/j.ejor.2015.07.017
  • Gong, Xu, Toon De Pessemier, Wout Joseph, and Luc Martens. 2015. “An Energy-cost-aware Scheduling Methodology for Sustainable Manufacturing.” Procedia CIRP 29: 185–190.10.1016/j.procir.2015.01.041
  • Gutowski, Timothy, Cynthia Murphy, David Allen, Diana Bauer, Bert Bras, Thomas Piwonka, Paul Sheng, John Sutherland, Deborah Thurstonand, and Egon Wolff. 2005. “Environmentally Benign Manufacturing: Observations from Japan, Europe and the United States.” Journal of Cleaner Production 13: 1–17.10.1016/j.jclepro.2003.10.004
  • Lin, Li, and Zeyi Sun. 2013. “Dynamic Energy Control for Energy Efficiency Improvement of Sustainable Manufacturing Systems Using Markov Decision Process.” IEEE Transactions on Systems, Man, and Cybernetics: Systems 43 (5):1195–1205.
  • Liu, Ying, Haibo Dong, Niels Lohse, Sanja Petrovic, and Nabil Gindy. 2014. “An Investigation into Minimising Total Energy Consumption and Total Weighted Tardiness in Job Shops.” Journal of Cleaner Production 65: 87–96.10.1016/j.jclepro.2013.07.060
  • Luo, Hao, George Q. Huang, Yingfeng Zhang, Qingyun Dai, and Xin Chen. 2009. “Two-stage Hybrid Batching Flowshop Scheduling with Blocking and Machine Availability Constraints using Genetic Algorithm.” Robotics and Computer-Integrated Manufacturing 25: 962–971.10.1016/j.rcim.2009.06.001
  • Luo, Hao, Bing Du, George Q. Huang, Huaping Chen, and Xiaolin Li. 2013. “Hybrid Flow Shop Scheduling Considering Machine Electricity Consumption Cost.” International Journal of Production Economics 146: 423–439.10.1016/j.ijpe.2013.01.028
  • Mansouri, S. Afshin, Emel Aktas, and Umut Besikci. 2016. “Green Scheduling of a Two-machine Flowshop: Trade-off Between Makespan and Energy Consumption.” European Journal of Operational Research 248 (3): 772–788.
  • Masmoudi, Oussama, A. Yalaoui, Y. Ouazene, and H. Chehade. 2015. “Lot-sizing in Flow-shop with Energy Consideration for Sustainable Manufacturing Systems.” IFAC-PapersOnLine 48 (3): 727–732.10.1016/j.ifacol.2015.06.169
  • Masmoudi, Oussama, Alice Yalaoui, Yassine Ouazene, and Hicham Chehade. 2016. “Lot-sizing in a Multi-stage Flow Line Production System with Energy Consideration.” International Journal of Production Research 1–24. doi:10.1080/00207543.2016.1206670.
  • Merkert Lennart, Iiro Harjunkoski, Alf Isaksson, Simo Säynevirta, Antti Saarela, and Guido Sand. 2015. “Scheduling and energy – Industrial challenges and opportunities.” Computers & Chemical Engineering 72: 183–198.
  • Moon, Joon-Yung, Kitae Shin, and Jinwoo Park. 2013. “Optimization of Production Scheduling with Time-dependent and Machine-dependent Electricity Cost for Industrial Energy Efficiency.” The International Journal of Advanced Manufacturing Technology 68: 523–535.10.1007/s00170-013-4749-8
  • Mouzon, Gilles. 2008. “Operational Methods and Models for Minimization of Energy Consumption in a Manufacturing Environment.” PhD thesis, Wichita State University.
  • National Bureau of Statistics of China, Annual Statistical Data. 2015. Accessed April 12, 2015. http://data.stats.gov.cn/easyquery.htm?cn=C01
  • National Bureau of Statistics of China, National Economic and Social Development Report. 2010. Release date: Febuary 28, 2011. http://www.stats.gov.cn/tjsj/tjgb/ndtjgb/qgndtjgb/201102/t20110228_30025.html
  • Pinedo, Michael. 2000. Scheduling: Theory, Algorithms, and Systems. 2nd ed. New York: Prentice Hall.
  • Prot, D., and O. Bellenguez-Morineau. 2012. “Tabu Search and Lower Bound for an Industrial Complex Shop Scheduling Problem.” Computers & Industrial Engineering 62 (4): 1109–1118.10.1016/j.cie.2012.01.003
  • Rager, Markus, Christian Gahm, and Florian Denz. 2015. “Energy-oriented Scheduling based on Evolutionary Algorithms.” Computers & Operations Research 54: 218–231.10.1016/j.cor.2014.05.002
  • Shrouf, Fadi, Joaquin Ordieres-Meré, Alvaro García-Sánchez, and Miguel Ortega-Mier. 2014. “Optimizing the Production Scheduling of a Single Machine to Minimize Total Energy Consumption Costs.” Journal of Cleaner Production 67: 197–207.10.1016/j.jclepro.2013.12.024
  • Stock, David. 2014. “World Production and Consumption of Ceramic Tiles 2013.” Tile Today 85: 54–62.
  • SYMPHONY Toolkit and Manual. 2015. https://projects.coin-or.org/SYMPHONY.
  • U.S. Energy Information Administration, International Energy Outlook. 2013, Report No. DOE/EIA-0484. Release date July 25, 2013. http://www.eia.gov/forecasts/archive/ieo13/
  • US Department of Energy, Manufacturing Energy and Carbon Footprint. 2010. Release date Febuary 2014. http://energy.gov/eere/amo/downloads/all-manufacturing-2010-mecs
  • Wang, Yong, and Lin Li. 2013. “Time-of-use Based Electricity Demand Response for Sustainable Manufacturing Systems.” Energy 63: 233–244.10.1016/j.energy.2013.10.011
  • Weinert, Nils, Stylianos Chiotellis, and Günther Seliger. 2011. “Methodology for Planning and Operating Energy-efficient Production Systems.” CIRP Annals - Manufacturing Technology 60 (1): 41–44.10.1016/j.cirp.2011.03.015
  • Xu, Weigang, and Le Cao. 2014. “Energy Efficiency Analysis of Machine Tools with Periodic Maintenance.” International Journal of Production Research 52 (18): 5273–5285.
  • Yenisey, Mehmet Mutlu, and Betul Yagmahan. 2014. “Multi-objective Permutation Flow Shop Scheduling Problem: Literature Review, Classification and Current Trends.” Omega 45: 119–135.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.