328
Views
6
CrossRef citations to date
0
Altmetric
Original Articles

Improved preventive maintenance in the framework of forecasting problem under subcontractor constraint

, &
Pages 4557-4600 | Received 22 Feb 2016, Accepted 24 Nov 2016, Published online: 16 Jan 2017

References

  • Aghezzaf, E. H., M. A. Jamali, and D. Ait-Kadi. 2007. “An Integrated Production and Preventive Maintenance Planning Model.” European Journal of Operational Research 181: 676–685.
  • Aghezzaf, E. H., Abdelhakim Khatab, and Puoc Le Tam. 2016. “Optimizing Production and Imperfect Preventive Maintenance Planning׳S Integration in Failure-prone Manufacturing Systems.” Reliability Engineering & System Safety 145: 190–198. doi:10.1016/j.ress.2015.09.017.
  • Akella, R., and P. R. Kumar. 1986. “Optimal Control of Production Rate in a Failure Prone Manufacturing System.” IEEE Transactions on Automatic Control 31: 116–126.10.1109/TAC.1986.1104206
  • Ben-Daya, M. 2002. “The Economic Production Lot-sizing Problem with Imperfect Production Processes and Imperfect Maintenance.” International Journal of Production Economics 76: 257–264.10.1016/S0925-5273(01)00168-2
  • Bertesekas, D. 1995. Dynamic Programming and Optimal Control. Belmont, MA: Athena Scientific.
  • Berthaut, F., A. Gharbi, and K. Dhouib. 2011. “Joint Modified Block Replacement and Production/Inventory Control Policy for a Failure-prone Manufacturing Cell.” Omega 39 (6): 642–654. doi:10.1016/j.omega.2011.01.006.
  • Berthaut, F., A. Gharbi, J.-P. Kenné, and J.-F. Boulet. 2010. “Improved Joint Preventive Maintenance and Hedging Point Policy.” International Journal of Production Economics 127 (1): 60–72.10.1016/j.ijpe.2010.04.030
  • Chelbi, A., and D. Ait-Kadi. 2004. “Analysis of a Production/Inventory System with Randomly Failing Production Unit Submitted to Regular Preventive Maintenance.” European Journal of Operational Research 156 (3): 712–718.
  • Dahane, M., C. Clémentz, and N. Rezg. 2008. “Analysis of Joint Maintenance and Production Policies under a Subcontracting Constraint.” International Journal of Production Research 46 (19): 5393–5416. doi:10.1080/00207540802273686.
  • Dellagi, S., N. Rezg, and X. Xie. 2007. “Preventive Maintenance of Manufacturing Systems under Environmental Constraints.” International Journal of Production Research 45 (5): 1233.10.1080/00207540600607226
  • Dobos, I., and K.-P. Kistner. 2000. “Optimal Production-inventory Strategies for a Reverse Logistics System.” The British Library-The World’s Knowledge 246–258.
  • Hajej, Z., S. Dellagi, and N. Rezg. 2009, “An Optimal Production/Maintenance Planning under Stochastic Random Demand, Service Level and Failure Rate.” In IEEE International Conference on Automation Science and Engineering, 292–297. Bangalore.
  • Hajej, Z., S. Dellagi, and N. Rezg. 2011. “Optimal Integrated Maintenance/Production Policy for Randomly Failing Systems with Variable Failure Rate.” International Journal of Production Research 49 (19): 5695–5712.
  • Hajej, Z., N. Rezg, and A. Gharbi. 2014. “Forecasting and Maintenance Problem under Subcontracting Constraint with Transportation Delay.” International Journal of Production Research 52 (22): 6695–6716. doi:10.1080/00207543.2014.911418.
  • Hajji, A., A. Gharbi, J. P. Kenne, and R. Pellerin. 2011. “Production Control and Replenishment Strategy with Multiple Suppliers.” European Journal of Operational Research 208: 67–74.10.1016/j.ejor.2010.08.010
  • Holt, C. C., F. Modigliani, J. F. Muth, and H. A. Simon. 1960. Planning, Production, Inventories and Work Forces. Englewood Cliffs, NJ: Prentice-Hall.
  • Hax, A., and D. Candea. 1984. Production and Inventory Management. Englewood Cliffs, NJ: Prentice-Hall.
  • Kenne, J. P., and A. Gharbi. 2000. “Production Planning Problem in Manufacturing Systems with General Failure and Repair Time Distributions.” Production Planning & Control 11 (6): 581–588.10.1080/095372800414142
  • Lu, Zhiqiang, Weiwei Cui, and Xiaole Han. 2015. “Integrated Production and Preventive Maintenance Scheduling for a Single Machine with Failure Uncertainty.” Computers & Industrial Engineering. 80: 236–244. doi:10.1016/j.cie.2014.12.017.
  • Nourelfath, M., and D. Ait-Kadi. 2006. “Optimization of Series-parallel Multi-state Systems under Maintenance Policies.” Reliability Engineering and System Safety 92 (2007): 1620–1626.
  • Nourelfath, M., E. Châtelet, and N. Nahas. 2012. “Joint Redundancy and Imperfect Preventive Maintenance Optimization for Series-parallel Multi-state Degraded Systems.” Reliability Engineering and System Safety 103 (2012): 51–60.10.1016/j.ress.2012.03.004
  • Nourelfath, M., N. Nahas, and M. Ben-Daya. 2016. “Integrated Preventive Maintenance and Production Decisions for Imperfect Processes.” Reliability Engineering and System Safety 148: 21–31. doi:10.1016/j.ress.2015.11.015.
  • Rafiei, Rezvan, Mustapha Nourelfath, Jonathan Gaudreault, and Luis Antonio De Santa-Eulalia. 2015. “Dynamic Safety Stock in Co-production Demand-driven Wood Remanufacturing Mills: A Case Study.” International Journal of Production Economics 165: 90–99. doi:10.1016/j.ijpe.2015.03.024.
  • Rezg, N., S. Dellagi, and A. Chelbi. 2008. “Joint Optimal Inventory Control and Preventive Maintenance Policy.” International Journal of Production Research 46 (19): 5349–5365.10.1080/00207540802273942
  • Rezg, N., X. Xie, and Y. Mati. 2004. “Joint Optimization of Preventive Maintenance and Inventory Control in a Production Line Using Simulation.” International Journal of Production Research 42: 2029–2046.10.1080/00207540310001638235
  • Safaei, Nima, and Reza Tavakkoli-Moghaddam. 2009. “Integrated Multi-period Cell Formation and Subcontracting Production Planning in Dynamic Cellular Manufacturing Systems.” International Journal of Production Economics 120 (2): 301–314.10.1016/j.ijpe.2008.12.013
  • Silva Fo, O. S., and S. D. Ventura. 1999. “Optimal Feedback Control Scheme Helping Managers to Adjust Aggregate Industrial Resources.” Control Engineering Practice 7: 555–563.10.1016/S0967-0661(98)00195-6
  • Singhal, J., and K. Singhal. 1996. “Alternate Approaches to Solving the Holt et al. Model and to Performing Sensitivity Analysis.” European Journal of Operational Research 91: 89–98.10.1016/0377-2217(94)00342-4

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.