515
Views
9
CrossRef citations to date
0
Altmetric
Original Articles

Cycle time-oriented mid-term production planning for semiconductor wafer fabrication

, &
Pages 4662-4679 | Received 01 Jul 2016, Accepted 30 Nov 2016, Published online: 19 Jan 2017

References

  • Asmundsson, J., R. L. Rardin, and R. Uzsoy. 2006. “Tractable Nonlinear Production Planning Models for Semiconductor Wafer Fabrication Facilities.” IEEE Transactions on Semiconductor Manufacturing 19 (1): 95–111.
  • Atherton, L. F., and R. W. Atherton. 1995. Wafer Fabrication: Factory Performance and Analysis. Vol. 339. Boston, MA: Kluwer Academic Publishers.
  • Bard, J. F., Y. Deng, R. Chacon, and J. Stuber. 2010. “Midterm Planning to Minimize Deviations from Daily Target Outputs in Semiconductor Manufacturing.” IEEE Transactions on Semiconductor Manufacturing 23 (3): 456–467.
  • Barua, A., N. Raghavan, A. Upasani, and R. Uzsoy. 2005. “Implementing Global Factory Schedules in the Face of Stochastic Disruptions.” International Journal of Production Research 43 (4): 793–818.
  • Billington, P. J., J. O. McClain, and L. J. Thomas. 1983. “Mathematical Programming Approaches to Capacity-constrained MRP Systems: Review, Formulation and Problem Reduction.” Management Science 29 (10): 1126–1141.
  • Cai, Y., E. Kutanoglu, and J. Hasenbein. 2011. “Production Planning and Scheduling: Interaction and Coordination.” In Planning Production and Inventories in the Extended Enterprise. Vol. 152 of International Series in Operations Research & Management Science, edited by K. G. Kempf, P. Keskinocak, and R. Uzsoy, 15–42. New York, NY: Springer.
  • Fowler, J. W., and J. Robinson. 1995. Measurement and Improvement of Manufacturing Capacities (MIMAC): Final Report. Tech. rep., SEMATECH. 95062861A-TR.
  • Fronckowiak, D., A. Peikert, and K. Nishinohara. 1996. “Using Discrete Event Simulation to Analyze the Impact of Job Priorities on Cycle Time in Semiconductor Manufacturing.” In Advanced Semiconductor Manufacturing Conference and Workshop, 1996. ASMC 96 Proceedings. IEEE/SEMI, 151–155. Cambridge, MA.
  • Govind, N., E. W. Bullock, L. He, B. Iyer, M. Krishna, and C. S. Lockwood. 2008. “Operations Management in Automated Semiconductor Manufacturing with Integrated Targeting, Near Real-time Scheduling, and Dispatching.” IEEE Transactions on Semiconductor Manufacturing 21 (3): 363–370.
  • Hackman, S. T., and R. C. Leachman. 1989. “A General Framework for Modeling Production.” Management Science 35 (4): 478–495.
  • Hopp, W. J., and M. L. Spearman. 2011. Factory Physics. New York, NY: Waveland Press.
  • Hwang, T.-K., and S.-C. Chang. 2003. “Design of a Lagrangian Relaxation-based Hierarchical Production Scheduling Environment for Semiconductor Wafer Fabrication.” IEEE Transactions on Robotics and Automation 19 (4): 566–578.
  • Irdem, D. F., N. B. Kacar, and R. Uzsoy. 2010. “An Exploratory Analysis of Two Iterative Linear Programming-simulation Approaches for Production Planning.” IEEE Transactions on Semiconductor Manufacturing 23 (3): 442–455.
  • Jula, P., and R. C. Leachman. 2008. “Coordinating Decentralized Local Schedulers in Complex Supply Chain Manufacturing.” Annals of Operations Research 161 (1): 123–147.
  • Kim, B., and S. Kim. 2001. “Extended Model for a Hybrid Production Planning Approach.” International Journal of Production Economics 73 (2): 165–173.
  • Kim, J. S., and R. C. Leachman. 1994. “Decomposition Method Application to a Large Scale Linear Programming WIP Projection Model.” European Journal of Operational Research 74 (1): 152–160.
  • Leachman, R. C. 2002. “Semiconductor Production Planning.” In Handbook of Applied Optimization, edited by P. M. Pardalos and M. G. C. Resende, 746–762. New York, NY: Oxford University Press.
  • Leachman, R. C., and T. F. Carmon. 1992. “On Capacity Modeling for Production Planning with Alternative Machine Types.” IIE Transactions 24 (4): 62–72.
  • Leachman, R. C., J. Kang, and V. Lin. 2002. “SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics.” Interfaces 32 (1): 61–77.
  • L’Ecuyer, P., L. Meliani, and J. Vaucher. 2002. “SSJ: A Framework for Stochastic Simulation in Java.” In Proceedings of the 34th Conference on Winter Simulation: Exploring New Frontiers, 234–242. San Diego, CA.
  • Lu, S. C. H., D. Ramaswamy, and P. R. Kumar. 1994. “Efficient Scheduling Policies to Reduce Mean and Variance of Cycle-time in Semiconductor Manufacturing Plants.” IEEE Transactions on Semiconductor Manufacturing 7 (3): 374–388.
  • Missbauer, H. 2002. “Aggregate Order Release Planning for Time-varying Demand.” International Journal of Production Research 40 (3): 699–718.
  • Missbauer, H., and R. Uzsoy. 2011. “Optimization Models of Production Planning Problems.” In Planning Production and Inventories in the Extended Enterprise. Vol. 151 of International Series in Operations Research & Management Science, edited by K. G. Kempf, P. Keskinocak and R. Uzsoy, 437–507. New York, NY: Springer.
  • Sawik, T. 2006. “Hierarchical Approach to Production Scheduling in Make-to-order Assembly.” International Journal of Production Research 44 (4): 801–830.
  • Sourirajan, K., and R. Uzsoy. 2007. “Hybrid Decomposition Heuristics for Solving Large-scale Scheduling Problems in Semiconductor Wafer Fabrication.” Journal of Scheduling 10 (1): 41–65.
  • Uzsoy, R., C.-Y. Lee, and L. A. Martin-Vega. 1992. “A review of Production Planning and Scheduling Models in the Semiconductor Industry Part I: System Characteristics, Performance Evaluation and Production Planning.” IIE Transactions 24 (4): 47–60.
  • Vollmann, T. E., W. L. Berry, D. C. Whybark, and F. R. Jacobs. 2005. Manufacturing Planning and Control for Supply Chain Management. New York, NY: McGraw-Hill/Irwin.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.