Job-shop like manufacturing system with variable power threshold and operations with power requirementsFootnote

, &
Pages 6011-6032 | Received 01 Sep 2016, Accepted 11 Apr 2017, Published online: 28 Apr 2017

References

  • Adibi, M. A., M. Zandieh, and M. Amiri. 2010. “Multi-objective Scheduling of Dynamic Job Shop Using Variable Neighborhood Search.” Expert Systems with Applications 37: 282–287.10.1016/j.eswa.2009.05.001
  • Bierwirth, C. 1995. “A Generalized Permutation Approach to Job Shop Scheduling with Genetic Algorithms.” OR Spektrum 17: 87–92.10.1007/BF01719250
  • Binato, S., W. J. Hery, D. M. Loewenstern, and M. G. C. Resende. 2001. “A Greedy Randomized Adaptive Search Procedure for Job Shop Scheduling.” IEEE Transactions on Power Systems 16: 247–253.10.1109/59.918294
  • Bruzzone, A. A. G., D. Anghinolfi, M. Paolucci, and F. Tonelli. 2012. “Energy-aware Scheduling for Improving Manufacturing Process Sustainability: A Mathematical Model for Flexible Flow Shops.” CIRP Annals – Manufacturing Technology 61: 459–462.
  • Caumond, A., P. Lacomme, and N. Tchernev. 2008. “A Memetic Algorithm for the Job-shop with Time-Lags.” Computers and Operations Research 35: 2331–2356.10.1016/j.cor.2006.11.007
  • Cheng, R., M. Gen, and Y. Tsujimura. 1996. “A Tutorial Survey of Job-shop Scheduling Problems Using Genetic Algorithms – I Representation.” Computers & Industrial Engineering 30: 983–997.10.1016/0360-8352(96)00047-2
  • Cheng, T. C. E., B. Peng, and Z. Lu. 2016. “A Hybrid Evolutionary Algorithm to Solve the Job Shop Scheduling Problem.” Annals of Operations Research 242: 223–237.
  • Dai, M., D. Tang, A. Giret, M. A. Salido, and W. D. Li. 2013. “Energy-efficient Scheduling for a Flexible Flow Shop Using an Improved Genetic-simulated Annealing Algorithm.” Robotics and Computer-Integrated Manufacturing 29: 418–429.10.1016/j.rcim.2013.04.001
  • Duflou, J. R., J. W. Sutherland, D. Dornfeld, C. Hermann, J. Jeswiet, S. Kara, M. Hauschild, and K. Kellens. 2012. “Towards Energy and Resource Efficient Manufacturing: A Processes and Systems Approach.” CIRP Annals – Manufacturing Technology 61: 587–609.
  • Duhamel, C., P. Lacomme, and C. Prodhon. 2011. “Efficient Frameworks for Greedy Split and New Depth First Search Split Procedures for Routing Problems.” Computers & Operations Research 38 (4): 723–739.10.1016/j.cor.2010.09.010
  • (EIA) Energy Administration Information. 2013. International Energy Outlook. http://www.eia.gov/
  • Fang, K., N. Uhan, F. Zhao, and J. W. Sutherland. 2011. “A New Approach to Scheduling in Manufacturing for Power Consumption and Carbon Footprint Reduction.” Journal of Manufacturing Systems 30: 234–240.10.1016/j.jmsy.2011.08.004
  • Feo, T. A., M. G. C. Resende, and S. H. Smith. 1994. “A Greedy Randomized Adaptive Search Procedure for Maximum Independent Set.” Operations Research 42: 860–878.10.1287/opre.42.5.860
  • Gao, L., X. Li, X. Wen, C. Lu, and F. Wen. 2015. “A Hybrid Algorithm Based on a New Neighborhood Structure Evaluation Method for Job Shop Scheduling Problem.” Computers and Industrial Engineering 88: 417–429.10.1016/j.cie.2015.08.002
  • Garey, M. R., D. S. Johnson, and R. Sethi. 1976. “The Complexity of flow Shop and Job-shop Scheduling.” Mathematics of Operations Research 1 (2): 117–129.10.1287/moor.1.2.117
  • Giret, A., D. Trentesaux, and V. Prabhu. 2015. “Sustainability in Manufacturing Operations Scheduling: A State of the Art Review.” Journal of Manufacturing Systems 37: 126–140.10.1016/j.jmsy.2015.08.002
  • Gupta, A., and S. Venkataraman. 2013. “Reducing Price Volatility of Electricity Consumption for a Firm’s Energy Risk Management.” The Electricity Journal 26 (3): 89–105.10.1016/j.tej.2013.03.005
  • He, Y., Y. Li, T. Wu, and J. W. Sutherland. 2015. “An Energy-responsive Optimization Method for Machine Tool Selection and Operation Sequence in Flexible Machining Job Shops.” Journal of Cleaner Production 87: 245–254.10.1016/j.jclepro.2014.10.006
  • Kemmoé-Tchomté, S., D. Lamy, and N. Tchernev. 2015a. “An Optimization Framework for Job-shop with Energy Threshold Issue with Consideration of Machining Operations with Consumption Peaks.” Proceedings of the 2015 Multidisciplinary International Scheduling Conference (MISTA), Prague, Czech Republic, 118–133.
  • Kemmoé-Tchomté, S., D. Lamy, and N. Tchernev. 2015b. “Job-shop like Manufacturing System with Time Dependent Energy Threshold and Operations with Peak Consumptions.” In APMS 2015, Part I, IFIP AICT, edited by S. Umeda, M. Nakano, H. Mizuyama, N. Hibino, D. Kiritsis, and G. von Cieminski, vol. 459, 617–624. Tokyo, Japan.
  • Kurdi, M. 2015. “A New Hybrid Island Model Genetic Algorithm for Job Shop Scheduling Problem.” Computers and Industrial Engineering 88: 273–283.10.1016/j.cie.2015.07.015
  • Lawrence, S. 1984. Resource Constrained Project Scheduling: An Experimental Investigation of Heuristic Scheduling Techniques (Supplement). Pittsburgh, PA: Graduate School of Industrial Administration, Carnegie Mellon University.
  • Lei, D., Y. Zheng, and X. Guo. 2016. “A Shuffled Frog-leaping Algorithm for Flexible Job Shop Scheduling with the Consideration of Energy Consumption.” International Journal of Production Research 55 (11): 3126–3140. doi:10.1080/00207543.2016.1262082.
  • Liu, C. H. 2015. “Mathematical Programming Formulations for Single-machine Scheduling Problems While Considering Renewable Energy Uncertainty.” International Journal of Production Research 54: 1122–1133 doi:10.1080/00207543.2015.1048380.
  • Liu, Y., H. Dong, N. Lohse, S. Petrovic, and N. Gindy. 2014. “An Investigation into Minimising Total Energy Consumption and Total Weighted Tardiness in Job Shops.” Journal of Cleaner Production 65: 87–96.10.1016/j.jclepro.2013.07.060
  • Liu, Y., H. Dong, N. Lohse, and S. Petrovic. 2015. “Reducing Environmental Impact of Production during a Rolling Blackout Policy – A Multi Objective Schedule Optimisation Approach.” Journal of Cleaner Production 102: 418–427.10.1016/j.jclepro.2015.04.038
  • Liu, G. S., H. D. Yang, and M. B. Cheng. 2016. “A Three-stage Decomposition Approach for Energy-aware Scheduling with Processing-time-dependent Product Quality.” International Journal of Production Research 55: 3073–3091. doi:10.1080/00207543.2016.1241446.
  • Luo, H., B. Du, G. Q. Huang, H. Chen, and X. Li. 2013. “Hybrid Flow Shop Scheduling Considering Machine Electricity Consumption Cost.” International Journal of Production Economics 146: 423–439.10.1016/j.ijpe.2013.01.028
  • May, G., B. Stahl, M. Taisch, and V. Prabhu. 2015. “Multi-objective Genetic Algorithm for Energy Efficient Job-shop Scheduling.” International Journal of Production Research 53 (23): 7071–7089.10.1080/00207543.2015.1005248
  • Merkert, L., I. Harjunkoski, A. Isaksson, S. Säynevirta, A. Saarela, and G. Sand. 2015. “Scheduling and Energy – Industrial Challenges and Opportunities.” Computers and Chemical Engineering 72: 183–198.10.1016/j.compchemeng.2014.05.024
  • Moon, J. Y., and J. Park. 2014. Smart Production Scheduling with Time-dependent and Machine-dependent Electricity Cost by Considering Distributed Energy Resources and Energy Storage, International Journal of Production Research 52 (13): 3922–3939. doi:10.1080/00207543.2013.860251.
  • Mouzon, G. C., M. B. Yildirim, and J. Twomey. 2007. “Operational Methods for Minimization of Energy Consumption of Manufacturing Equipment.” International Journal of Production Research 45: 4247–4271.10.1080/00207540701450013
  • Nguyen, V. P., C. Prins, and C. Prodhon. 2012. “A Multi-start Iterated Local Search with Tabu List and Path Relinking for the Two-echelon Location-routing Problem.” Engineering Applications of Artificial Intelligence 25: 56–71.10.1016/j.engappai.2011.09.012
  • Nolde, K., and M. Morari. 2010. “Electrical Load Tracking Scheduling of a Steel Plant.” Computers and Chemical Engineering 34: 1899–1903.10.1016/j.compchemeng.2010.01.011
  • Nowicki, E., and C. Smutnicki. 1996. “A Fast Taboo Search for the Job Shop Problem.” Management Science 42 (6): 797–813.
  • O’Rielly, K., and J. Jeswiet. 2014. “Strategies to Improve Industrial Energy Efficiency.” 21st CIRP Conference on Life Cycle Engineering, Procedia CIRP, vol. 15, 325–330. Trondheim, Norway.
  • Prins, C. 2009. “A GRASP X Evolutionary Local Search Hybrid for the Vehicle Routing Problem.” In Bio-inspired Algorithms for the Vehicle Routing Problem, Studies in Computational Intelligence, edited by F. B. Pereira and J. Tavares, vol. 161, 35–53. Springer Berlin Heidelberg.
  • Qing-dao-er-ji, R., and Y. Wang. 2012. “A New Hybrid Genetic Algorithm for Job Shop Scheduling Problem.” Computers & Operations Research 39: 2291–2299.10.1016/j.cor.2011.12.005
  • Rager, M., C. Gahm, and F. Denz. 2015. “Energy-oriented Scheduling Based on Evolutionary Algorithms.” Computers & Operations Research 54: 218–231.10.1016/j.cor.2014.05.002
  • Roshanaei, V., B. Naderi, F. Jolai, and M. Khalili. 2009. “A Variable Neighborhood Search for Job Shop Scheduling with Set-up times to Minimize Makespan.” Future Generation Computer Systems 25: 654–661.10.1016/j.future.2009.01.004
  • Roy, B., and B. Sussman. 1964. “Les Problèmes D’ordonnancement Avec Contraintes Disjonctives.” Note DS No. 9 bis, SEMA Paris.
  • Salido, M. A., J. Escamilla, F. Barber, A. Giret, D. Tang, and M. Dai. 2016. “Energy Efficiency, Robustness, and Makespan Optimality in Job-shop Scheduling Problems.” Artificial Intelligence for Engineering Design Analysis and Manufacturing 30 (3): 300–312.
  • Salido, Miguel A., Joan Escamilla, Adriana Giret, and Federico Barber. 2016. “A Genetic Algorithm for Energy-Efficiency in Job-Shop Scheduling.” The International Journal of Advanced Manufacturing Technology 85 (5–8): 1303–1314.
  • Shrouf, F., J. Ordieres-Meré, A. García-Sánchez, and M. Ortega-Mier. 2014. “Optimizing the Production Scheduling of a Single Machine to Minimize Total Energy Consumption Costs.” Journal of Cleaner Production 67: 197–207.10.1016/j.jclepro.2013.12.024
  • Van Laarhoven, P. J. M., E. H. L. Aarts, and J. K. Lenstra. 1992. “Job Shop Scheduling by Simulated Annealing.” Operations Research 40 (1): 113–125.10.1287/opre.40.1.113
  • Weinert, N., S. Chiotellis, and G. Seliger. 2011. “Methodology for Planning and Operating Energy-efficient Production Systems.” CIRP Annals – Manufacturing Technology 60: 41–44.10.1016/j.cirp.2011.03.015
  • Wolf, S., and P. Merz. 2007. “Evolutionary Local Search for the Super-peer Selection Problem and the P-Hub Median Problem.” Lecture Notes in Computer Science, Berlin, Springer 4771: 1–15.10.1007/978-3-540-75514-2
  • Zhang, C. Y., P. Li, Y. Rao, and Z. Guan. 2008. “A Very Fast TS/SA Algorithm for the Job Shop Scheduling Problem.” Computers & Operations Research 35: 282–294.10.1016/j.cor.2006.02.024
  • Zhang, H., F. Zhao, K. Fang, and J. W. Sutherland. 2014. “Energy-conscious Flow Shop Scheduling under Time-of-use Electricity Tariffs.” CIRP Annals – Manufacturing Technology 63: 37–40.10.1016/j.cirp.2014.03.011
  • Zhang, L., X. Li, L. Gao, and G. Zhang. 2016. “Dynamic Rescheduling in FMS That is Simultaneously Considering Energy Consumption and Schedule Efficiency.” The International Journal of Advanced Manufacturing Technology 87 (5): 1387–1399. 10.1007/s00170-012-4294-x
  • Zhang, R., and R. Chiong. 2016. “Solving the Energy-Efficient Job Shop Scheduling Problem: A Multi-Objective Genetic Algorithm with Enhanced Local Search for Minimizing the Total Weighted Tardiness and Total Energy Consumption.” Journal of Cleaner Production 112 (4): 3361–3375.
  • Zhao, F., J. Zhang, C. Zhang, and J. Wang. 2015. “An Improved Shuffled Complex Evolution Algorithm with Sequence Mapping Mechanism for Job Shop Scheduling Problems.” Expert Systems with Applications 42: 3953–3966.10.1016/j.eswa.2015.01.007

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.