994
Views
9
CrossRef citations to date
0
Altmetric
Original Articles

Performance comparison of multiple product kanban control systems

&
Pages 1299-1312 | Received 20 Jul 2016, Accepted 01 May 2017, Published online: 26 May 2017

References

  • Aghajani, M., A. Keramati, and B. Javadi. 2012. “Determination of Number of Kanban in a Cellular Manufacturing System with Considering Rework Process.” The International Journal of Advanced Manufacturing Technology 63 (9–12): 1177–1189.
  • Al-Hawari, T., and F. Aqlan. 2012. “A Software Application for E-Kanban-based WIP Control in the Aluminium Industry.” International Journal of Modelling in Operations Management 2 (2): 119–137.10.1504/IJMOM.2012.046336
  • Ang, A. 2013. “An Investigation into the Extended Kanban Control System (EKCS).” PhD Thesis, Nanyang Technological University (NTU), Lee Wee Nam Library.
  • Ang, A. 2015. “A Performance Comparison of Single Product Kanban Control Systems.” International Journal of Production Management and Engineering 3 (1): 57–74.10.4995/ijpme.2015.3038
  • Anupindi, R., and S. Tayur. 1998. “Managing Stochastic Multiproduct Systems: Model, Measures, and Analysis.” Operations Research 46 (3-supplement-3): S98–S111. doi:10.1287/opre.46.3.S98.
  • Askin, R. G., M. G. Mitwasi, and J. B. Goldberg. 1993. “Determining the Number of Kanbans in Multi-item Jun-in-time System.” IIE Transactions 25 (1): 89–98.10.1080/07408179308964269
  • Baynat, B., J. A. Buzacott, and Y. Dallery. 2002. “Multiproduct Kanban-like Control Systems.” International Journal of Production Research 40 (16): 4225–4255.10.1080/00207540210146198
  • Bonvik, A. M., Y. Dallery, and S. B. Gershwin. 2000. “Approximate Analysis of Production Systems Operated by a CONWIP/Finite Buffer Hybrid Control Policy.” International Journal of Production Research 38 (13): 2845–2869.10.1080/00207540050117332
  • Boonlertvanich, K. 2005. “Extended-CONWIP-Kanban System: Control and Performance Analysis.” PhD, Georgia Tech, USA.
  • Buzacott, J. A. 1989. “Queueing Models of Kanban and MRP Controlled Production Systems.” Engineering Costs and Production Economics 17 (1–4): 3–20.10.1016/0167-188X(89)90050-5
  • Buzacott, J. A., and J. G. Shanthikumar. 1993. Stochastic Models of Manufacturing Systems. Englewood Cliffs, NJ: Prentice Hall.
  • Chaouiya, C., G. Liberopoulos, and Y. Dallery. 2000. “The Extended Kanban Control System for Production Coordination of Assembly Manufacturing Systems.” IIE Transactions (Institute of Industrial Engineers) 32 (10): 999–1012.
  • Dallery, Y. 2000. “Extended Kanban Control System: Combining Kanban and Base Stock.” IIE Transactions 32 (4): 369–386.
  • Deleersnyder, J.-L., T. J. Hodgson, R. E. King, P. J. O'Grady, and A. Savva. 1992. “Integrating Kanban Type Pull Systems and MRP Type Push Systems: Insights from a Markovian Model.” IIE Transactions 24 (3): 43–56.10.1080/07408179208964223
  • Deokar, S. S. 2004. “Performanc Evaluation of Multi-product Kanban-like Control Systems.” Unpublished Masters Thesis (MSIE), University of South Florida.
  • Di Mascolo, M. 1996. “Analysis of a Synchronization Station for the Performance Evaluation of a Kanban System with a General Arrival Process of Demands.” European Journal of Operational Research 89 (1): 147–163.10.1016/S0377-2217(96)90066-1
  • Diaz, R., and A. Ardalan. 2010. “An Analysis of Dual-Kanban Just-in-time Systems in a Non-repetitive Environment.” Production and Operations Management 19 (2): 233–245.10.1111/poms.2010.19.issue-2
  • Diem, W., and W. Kimberley. 2001. “The Same Only Different.” Automotive Engineer 26 (5): 46.
  • Faccio, M., M. Gamberi, and A. Persona. 2013. “Kanban Number Optimisation in a Supermarket Warehouse Feeding a Mixed-model Assembly System.” International Journal of Production Research 51 (10): 2997–3017.10.1080/00207543.2012.751516
  • Faccio, M., Mauro Gamberi, A. Persona, A. Regattieri, and F. Sgarbossa. 2013. “Design and Simulation of Assembly Line Feeding Systems in the Automotive Sector Using Supermarket, Kanbans and Tow Trains: A General Framework.” Journal of Management Control 24 (2): 187–208.10.1007/s00187-013-0175-1
  • Fujiwara, O., X. Yue, K. Sangaradas, and H. T. Luong. 1998. “Evaluation of Performance Measures for Multi-part, Single-product Kanban Controlled Assembly Systems with Stochastic Acquisition and Production Lead times.” International Journal of Production Research 36 (5): 1427–1444.10.1080/002075498193408
  • Fullerton, R. R., and C. S. McWatters. 2001. “The Production Performance Benefits from JIT Implementation.” Journal of Operations Management 19 (1): 81–96.10.1016/S0272-6963(00)00051-6
  • Gershwin, S. B. 2000. “Design and Operation of Manufacturing Systems: The Control-point Policy.” IIE Transactions (Institute of Industrial Engineers) 32 (10): 891–906.
  • Gstettner, S., and H. Kuhn. 1996. “Analysis of Production Control Systems Kanban and CONWIP.” International Journal of Production Research 34 (11): 3253–3273.10.1080/00207549608905087
  • Gupta, S. M., Y. A. Y. Al-Turki, and R. F. Perry. 1999. “Flexible Kanban System.” International Journal of Operations & Production Management 19 (10): 1065–1093. doi:10.1108/01443579910271700.
  • Hopp, W. J., and M. L. Spearman. 2008. Factory Physics. 3rd ed. New York: McGraw-Hill/Irwin/Irwin.
  • Kim, I., and C. S. Tang. 1997. “Lead Time and Response Time in a Pull Production Control System.” European Journal of Operational Research 101 (3): 474–485.10.1016/S0377-2217(96)00174-9
  • Krieg, G. N., and H. Kuhn. 2002. “A Decomposition Method for Multi-product Kanban Systems with Setup times and Lost Sales.” IIE Transactions 34 (7): 613–625.
  • Krieg, G. N., and H. Kuhn. 2004. “Analysis of Multi-product Kanban Systems with State-dependent Setups and Lost Sales.” Annals of Operations Research 125 (1–4): 141–166.10.1023/B:ANOR.0000011189.48656.14
  • Liberopoulos, G., and Y. Dallery. 2002. “Base Stock versus WIP Cap in Single-stage Make-to-stock Production-inventory Systems.” IIE Transactions 34 (7): 627.
  • Lin, C. J., F. F. Chen, and Y. M. Chen. 2013. “Knowledge Kanban System for Virtual Research and Development.” Robotics and Computer-Integrated Manufacturing 29 (3): 119–134.10.1016/j.rcim.2012.04.020
  • Lolli, F., R. Gamberini, C. Giberti, B. Rimini, and F. Bondi. 2016. “A Simulative Approach for Evaluating Alternative Feeding Scenarios in a Kanban System.” International Journal of Production Research 54 (14): 4228–4239.10.1080/00207543.2015.1117675
  • Monden, Y. 1998. Toyota Production System : An Integrated Approach to Just-in-time. 3rd ed. Norcross, GA: Engineering & Management Press.
  • Moran, T. J., and K. Brayer. 2011. “A Simulation Study of Economic Production Quantity Lot Size to Kanban for a Single Line Production System under Various Setup times with Annual Setup Cost as Performance Metric.” International Journal of Management and Information Systems 15 (2): 23–30.
  • Nori, V. S., and B. R. Sarker. 1998. “Optimum Number of Kanbans between Two Adjacent Stations.” Production Planning & Control 9 (1): 60–65.10.1080/095372898234523
  • Onyeocha, C. E., J. Wang, J. Khoury, and J. Geraghty. 2015. “A Comparison of HK-CONWIP and BK-CONWIP Control Strategies in a Multi-product Manufacturing System.” Operations Research Perspectives 2: 137–149.10.1016/j.orp.2015.07.001
  • Ross, S. M. 2007. Introduction to Probability Models. 9th ed. Amsterdam: Academic Press.
  • Siha, S. 1994. “The Pull Production System: Modelling and Characteristics.” International Journal of Production Research 32 (4): 933–949.10.1080/00207549408956980
  • So, K. C., and S. C. Pinault. 1988. “Allocating Buffer Storages in a Pull System.” International Journal of Production Research 26 (12): 1959–1980.10.1080/00207548808948008
  • Spearman, M. L., D. L. Woodruff, and W. J. Hopp. 1990. “CONWIP: A Pull Alternative to Kanban.” International Journal of Production Research 28 (5): 879–894.10.1080/00207549008942761
  • Sugimori, Y., K. Kusunoki, F. Cho, and S. Uchikawa. 1977. “Toyota Production System and Kanban System Materialization of Just-in-time and Respect-for-human System.” International Journal of Production Research 15 (6): 553–564.10.1080/00207547708943149
  • Takahashi, K., K. Morikawa, and N. Nakamura. 2004. “Reactive JIT Ordering System for Changes in the Mean and Variance of Demand.” International Journal of Production Economics 92 (2): 181–196.10.1016/j.ijpe.2003.10.014
  • Tardif, V., and L. Maaseidvaag. 2001. “An Adaptive Approach to Controlling Kanban Systems.” European Journal of Operational Research 132 (2): 411–424.10.1016/S0377-2217(00)00119-3
  • Tayur, S. R. 1993. “Structural Properties and a Heuristic for Kanban-controlled Serial Lines.” Management Science 39 (11): 1347–1368.10.1287/mnsc.39.11.1347
  • Wang, H., and W. Hsu-Pin. 1991. “Optimum Number of Kanbans between Two Adjacent Workstations in a JIT System.” International Journal of Production Economics 22 (3): 179–188.10.1016/0925-5273(91)90093-9
  • White, R. E., J. N. Pearson, and J. R. Wilson. 1999. “JIT Manufacturing: A Survey of Implementations in Small and Large US Manufacturers.” Management Science 45 (1): 1–15. doi:10.1287/mnsc.45.1.1.
  • Zipkin, P. H. 2000. Foundations of Inventory Management. Boston, MA: McGraw-Hill.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.