References
- Afonso, P., M. Nunes, A. Paisana, and A. Braga. 2008. “The Influence of Time-to-market and Target Costing in the New Product Development Success.” International Journal of Production Economics 115 (2): 559–568.10.1016/j.ijpe.2008.07.003
- Apple Powerbook: Design Quality and Time to Market . 1994. Design Management Institute, 9-994-023.
- Cankurtaran, P., F. Langerak, and A. Griffin. 2013. “Consequences of New Product Development Speed: A Meta-analysis.” Journal of Product Innovation Management 30 (3): 465–486.10.1111/jpim.12011
- Chen, J., R. R. Reilly, and G. S. Lynn. 2005. “The Impacts of Speed-to-market on New Product Success: The Moderating Effects of Uncertainty.” IEEE Transactions on Engineering Management 52 (2): 199–212.10.1109/TEM.2005.844926
- Choudhury, A., and V. Allada. 2007. “Integrated Product and Its Extended Enterprise Network Design Using Lean Principles”. Master thesis. http://scholarsmine.mst.edu/masters_theses/4560/d
- Cohen, M., J. Eliasberg, and T. H. Ho. 1996. “New Product Development: The Performance and Time-to-market Tradeoff.” Management Science 42 (2): 173–186.10.1287/mnsc.42.2.173
- Cooper, R. 2016. “Developing New Products on Time, in Time.” Research-Technology Management 38 (5): 49–57.
- Danese, P., and R. Filippini. 2010. “Modularity and the Impact on New Product Development Time Performance.” International Journal of Operations & Production Management 30 (11): 1191–1209.10.1108/01443571011087387
- De, A., S. K. Kumar, A. Gunasekaran, and M. K. Tiwari. 2017. “Sustainable Maritime Inventory Routing Problem with Time Window Constraints.” Engineering Applications of Artificial Intelligence 61 (2017): 77–95.10.1016/j.engappai.2017.02.012
- De, A., V. K. R. Mamanduru, A. Gunasekaran, N. Subramanian, and M. K. Tiwari. 2016. “Composite Particle Algorithm for Sustainable Integrated Dynamic Ship Routing and Scheduling Optimization.” Computers and Industrial Engineering 96 (2016): 201–215.10.1016/j.cie.2016.04.002
- Deb, K., and H. G. Beyer. 2001. “Self-adaptive Genetic Algorithms with Simulated Binary Crossover.” Evolutionary Computation 9 (2): 197–221.10.1162/106365601750190406
- Deb, K., and A. Kumar. 1995. “Real-coded Genetic Algorithms with Simulated Binary Crossover: Studies on Multimodal and Multi-objective Problems.” Complex Systems 9 (6): 431–454.
- Deb, K., A. Pratap, S. Agarwal, and T. Meyarivan. 2002. “A Fast and Elitist Multi-objective Genetic Algorithm: NSGA-II.” IEEE Transaction on Evolutionary Computation 6 (2): 181–197.
- Eres, M. H., M. Bertoni, M. Kossman, and J. Scanlan. 2012. “Mapping Customer Needs to Engineering Characteristics: An Aerospace Perspective for Conceptual Design.” Journal of Engineering Design 25 (1–3): 64–87.
- Goswami, M., Y. Daultani, and M. K. Tiwari. 2017. “An Integrated Framework for Product Line Design for Modular Products: Product Attribute and Functionality-Driven Perspective.” International Journal of Production Research 55 (13): 3862–3885.
- Goswami, M., S. Pratap, and S. K. Kumar. 2016. “An Integrated Bayesian-Game Theoretic Approach for Product Portfolio Planning of a Multi-attributed Product in a Duopolistic Market.” International Journal of Production Research 54 (23): 6997–7013.10.1080/00207543.2016.1150614
- Goswami, M., and M. K Tiwari. 2015. “Product Feature and Functionality Driven Integrated Framework for Product Commercialization in Presence of Qualitative Consumer Reviews.” International Journal of Production Research 53 (16): 4769–4788.10.1080/00207543.2014.987358
- Langerak, F., E. J. Hultink, and A. Griffin. 2008. “Exploring Mediating and Moderating Influences on the Links among Cycle Time, Proficiency in Entry Timing, and New Product Profitability.” Journal of Product Innovation Management 25: 370–385.10.1111/j.1540-5885.2008.00307.x
- March, A. 1994. Apple PowerBook: Leveraging Design in a Time to Market Environment (B) Case. Design Management Institute Press, 9-994-024. https://cb.hbsp.harvard.edu/cbmp/content/sample/994024-PDF-ENG.
- Nembhard, H. B., and M. Aktan. 2009. Real Options in Engineering, Design, Operations and Management. New York: CRC Press.10.1201/9781420071702
- Rash, E., and K. Kempf. 2015. “Product Line Design and Scheduling at Intel.” Interfaces 42 (5): 425–436.
- Roy, R., S. Kelvesjo, S. Forsberg, and C. Rush. 2001. “Quantitative and Qualitative Cost Estimating for Engineering Design.” Journal of Engineering Design 12 (2): 147–162.10.1080/09544820110038997
- Roy, R., S. Kelvesjo, S. Forsberg, and C. Rush. 2010. “Quantitative and Qualitative Cost Estimating for Engineering Design.” Journal of Engineering Design 12 (2): 147–162. doi:10.1080/09544820110038997.
- Roy, R., P. Souchoroukov, and T. Griggs. 2008. “Function-based Cost Estimating.” International Journal of Production Research 46 (10): 2621–2650.10.1080/00207540601094440
- Tyagi, S., A. Choudhary, X. Cai, and K. Yang. 2015. “Value Stream Mapping to Reduce the Lead-time of a Product Development Process.” International Journal of Production Economics 160 (2015): 202–212.10.1016/j.ijpe.2014.11.002
- Tyagi, S. K., K. Yang, A. Tyagi, and S. N. Dwivedi. 2011. “Development of a Fuzzy Goal Programming Model for Optimization of Lead Time and Cost in an Overlapped Product Development Project Using a Gaussian Adaptive Particle Swarm Optimization-based Approach.” Engineering Applications of Artificial Intelligence 24 (5): 866–879.10.1016/j.engappai.2011.02.009
- Tyagi, S. K., K. Yang, A. Tyagi, and A. Verma. 2012. “A Fuzzy Goal Programming Approach for Optimal Product Family Design of Mobile Phones and Multiple-platform Architecture.” IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews) 42 (6): 1519–1530.10.1109/TSMCC.2012.2198056
- Vickery, S. K., Y. A. Bolumole, M. J. Castel, and R. J. Calantone. 2015. “The Effects of Product Modularity on Launch Speed.” International Journal of Production Research 53 (17): 5369–5381.10.1080/00207543.2015.1047972
- Weber, T. A.. 2008. “Delayed Multi Attribute Product Differentiation.” Decision Support Systems 44 (2): 447–468.10.1016/j.dss.2007.06.001
- Wynstra, F., F. V. Corswant, and M. Wetzels. 2010. “In Chains? An Empirical Study of Antecedents of Supplier Product Development Activity in the Automotive Industry.” Journal of Product Innovation Management 27 (5): 625–639.10.1111/jpim.2010.27.issue-5
- Yin, Y., K. E. Stecke, M. Swink, and I. Kaku. 2017. “Lessons From Seru Production on Manufacturing Competitively in a High Cost Environment.” Journal of Operations Management 49–51 (2017): 67–76.10.1016/j.jom.2017.01.003
- Zachary, M., P. T. Gianiodis, G. T. Payne, and G. D. Markman. 2015. “Entry Timing.” Journal of Management 41 (5): 1388–1415.10.1177/0149206314563982