3,459
Views
29
CrossRef citations to date
0
Altmetric
Original Articles

Successful implementation of an order release mechanism based on workload control: a case study of a make-to-stock manufacturer

, ORCID Icon &
Pages 1565-1580 | Received 04 Aug 2016, Accepted 11 Aug 2017, Published online: 04 Sep 2017

References

  • Asmundsson, J., R. Rardin, C. Turkseven, and R. Uzsoy. 2009. “Production Planning with Resources Subject to Congestion.” Naval Research Logistics 56: 142–157.10.1002/nav.v56:2
  • Bechte, W. 1988. “Theory and Practice of Load-Oriented Manufacturing Control.” International Journal of Production Research 26 (3): 375–395.10.1080/00207548808947871
  • Bechte, W. 1994. “Load-Oriented Manufacturing Control Just-in-Time Production for Job Shops.” Production Planning and Control 5: 292–307.10.1080/09537289408919499
  • Bergamaschi, D., R. Cigolini, M. Perona, and A. Portioli. 1997. “Order Review and Release Strategies Ina Job Shop Environment: A Review and a Classification.” International Journal of Production Research 35: 399–420.10.1080/002075497195821
  • Bertrand, J. W. M., and J. C. Wortmann. 1981. Production Control and Information Systems for Component – Manufacturing Shops. Amsterdam: Elsevier.
  • Bertrand, J. W. M., J. C. Wortmann, and J. Wijngaard. 1990. Production Control: A Structural and Design Oriented Approach. Amsterdam: Elsevier.
  • Bhasin, S., and P. Burcher. 2006. “Lean Viewed as a Philosophy.” Journal of Manufacturing Technology Management 17 (1): 56–72.10.1108/17410380610639506
  • Bobrowski, P. M. 1989. “Implementing a Loading Heuristic in aDiscrete Release Job Shop.” International Journal of Production Research 27: 1935–1948.
  • Cigolini, R., M. Perona, and A. Portioli. 1998. “Comparison of Order Review and Release Techniques in a Dynamic and Uncertain Job Shop Environment.” International Journal of Production Research 36 (11): 2931–2951.10.1080/002075498192210
  • Cigolini, R., and A. Portioli-Staudacher. 2002. “An Experimental Investigation on Workload Limiting Methods within ORR Policies in a Job Shop Environment.” Production Planning and Control 13 (7): 602–613.10.1080/0953728021000026221
  • De Kok, T., and J. Fransoo. 2003. “Planning Supply Chain Operations: Definition and Comparison of Planning Concepts.” In Supply Chain Management: Design, Coordination and Operation, edited by A. G. De Kok and S. C. Graves, 591–675. Amsterdam: Elsevier.
  • Fernandes, N. O., M. J. Land, and S. Carmo-Silva. 2014. “Workload Control in Unbalanced Job Shops.” International Journal of Production Research 52: 679–690.10.1080/00207543.2013.827808
  • Fry, T. D., K. Karwan, and D. Steele. 1992. “Implementing Drum-Buffer-Rope to Control Manufacturing Lead Time.” International Journal of Logistics Management 2 (1): 12–18.
  • Fry, T. D., and A. E. Smith. 1987. “A Procedure for Implementing Input/Output Control: A Case Study.” Production and Inventory Management Journal 28: 50–52.
  • Handfield, R. B., and S. A. Melnyk. 1998. “The Scientific Theory-Building Process: A Primer Using the Case of TQM.” Journal of Operations Management 16: 321–339.10.1016/S0272-6963(98)00017-5
  • Hendry, L. C., P. Elings, and D. Pegg. 1993. “Production Planning for an Artists Studio — A Case Study.” European Journal of Operational Research 64: 12–20.10.1016/0377-2217(93)90004-7
  • Hendry, L. C., and B. G. Kingsman. 1989. “Production Planning Systems and Their Applicability to Make-to-Order Companies.” European Journal of Operational Research 40: 1–15.10.1016/0377-2217(89)90266-X
  • Hendry, L. C., M. J. Land, M. Stevenson, and G. Gaalman. 2008. “Investigating Implementation Issues for Workload Control (WLC): a Comparative Case Study Analysis.” International Journal of Production Economics 112: 452–469.10.1016/j.ijpe.2007.05.012
  • Hendry, L. C., M. Stevenson, and Y. Huang. 2013. “Workload Control: Successful Implementation Taking a Contingency-Based View of Production Planning & Control.” International Journal of Operations & Production Management 33 (1): 69–103.10.1108/01443571311288057
  • Henrich, P. 2005. “Applicability Aspects of Workload Control in Job Shop Production.” PhD diss., Ridderkerk: University of Groningen, Labyrint Publications.
  • Henrich, P., M. Land, and G. Gaalman. 2004. “Exploring Applicability of the Workload Control Concept.” International Journal of Production Economics 90 (2): 187–198.10.1016/S0925-5273(03)00126-9
  • Hutter, T., S. Haeussler, and H. Missbauer. 2016. “Successful Implementation of an Order Release Mechanism Based on Workload Control: A Case Study of a Make-to-Stock Manufacturer”. Pre-Prints of the 19th International Working Seminar on Production Economics, Innsbruck.
  • Jacobs, F. R. D., W. B. C. Whybark, and T. Vollmann. 2011. Manufacturing Planning and Control for Supply Chain Management. New York: McGrawHill.
  • Kingsman, B. G., and L. C. Hendry. 2002. “The Relative Contributions of Input and Output Controls on the Performance of a Workload Control System in Make-to-Order Companies.” Production Planning and Control 13 (7): 579–590.10.1080/0953728021000026285
  • Little, J. O. 1961. “A Proof for the Queuing Formula: L = λW.” Operations Research 9: 383–387.10.1287/opre.9.3.383
  • Lock, D. 2007. The Essentials of Project Management. Aldershot: Gower Publishing.
  • Lödding, H. 2008. “Verfahren der Fertigungssteuerung. Grundlagen, Beschreibung, Konfiguration.” Habilitation, Berlin: University of Hannover, Springer.
  • Maier, R., and U. Remus. 2003. “Implementing Process-Oriented Knowledge Management Strategies.” Journal of Knowledge Management 7 (4): 62–74.10.1108/13673270310492958
  • Melnyk, S. A., and G. L. Ragatz. 1989. “Order Review/Release: Research Issues and Perspectives.” International Journal of Production Research 27 (7): 1081–1096.10.1080/00207548908942609
  • Missbauer, H., W. Hauber, and W. Stadler. 2011. “Developing a Computerized Scheduling System for the Steelmaking-Continuous Casting Process.” In Planning Production and Inventories in the Extended Enterprise: A State-of-the-Art Handbook, edited by G. K. Kempf, P. Keskinocak and R. Uzsoy, 461–488. New York: Springer.10.1007/978-1-4419-8191-2
  • Oosterman, B., M. J. Land, and G. Gaalman. 2000. “The Influence of Shop Characteristics on Workload Control.” International Journal of Production Economics 68 (1): 107–119.10.1016/S0925-5273(99)00141-3
  • Park, C., J. Song, J.-G. Kim, and I. Kim. 1999. “Delivery Date Decision Support System for the Large Scale Make-to-Order Manufacturing Companies: A Korean Electric Motor Company Case.” Production Planning and Control 10: 585–597.10.1080/095372899232885
  • Pasmore, W. A., B. Stymne, A. B. R. Shani, S. A. Mohrman, and N. Adler. 2008. “The Promise of Collaborative Management Research.” In Handbook of Collaborative Management Research, edited by A. B. R. Shani, S. A. Mohrman, W. A. Pasmore, B. Stymne and N. Adler, 7–32. Newbury Park, CA: Sage.10.4135/9781412976671
  • Portioli-Staudacher, A., and M. Tantardini. 2012. “A Lean-Based ORR System for Non-Repetitive Manufacturing.” International Journal of Production Research 50 (12): 3257–3273.10.1080/00207543.2011.564664
  • Riezebos, J., G. J. Korte, and M. J. Land. 2003. “Improving a Practical DBR Buffering Approach Using Workload Control.” International Journal of Production Research 41: 699–712.10.1080/0020754031000065485
  • Samuelson, W., and R. Zeckhauser. 1988. “Status Quo Bias in Decision Making.” Journal of Risk and Uncertainty 1: 7–59.10.1007/BF00055564
  • Silva, C., L. Roque, and A. Almeida. 2006. “MAPP – A Web-Based Decision Support System for the Mould Industry.” Decision Support Systems 42: 413–447.
  • Silva, C., M. Stevenson, and M. Thurer. 2015. “A Case Study of the Successful Implementation of Workload Control.” Journal of Manufacturing Technology Management 26 (2): 280–296.10.1108/JMTM-10-2013-0144
  • Soepenberg, G. D., M. J. Land, and G. J. C. Gaalman. 2012. “Workload Control Dynamics in Practice.” International Journal of Production Research 50 (2): 443–460.10.1080/00207543.2010.539277
  • Stadtler, H., and C. Kilger. 2005. Supply Chain Management And Advanced Planning: Concepts, Models, Software And Case Studies. Berlin: Springer.10.1007/b106298
  • Stevenson, M. 2006. “Refining a Workload Control (WLC) Concept: A Case Study.” International Journal of Production Research 44: 767–790.10.1080/00207540500338070
  • Stevenson, M., and L. C. Hendry. 2006. “Aggregate Load-oriented Workload Control: A Review and a Re-classification of a Key Approach.” International Journal of Production Economics 104: 676–693.
  • Stevenson, M., L. C. Hendry, and B. Kingsman. 2005. “A Review of Production Planning and Control: The Applicability of Key Concepts to the Make-to-Order Industry.” International Journal of Production Research 43 (5): 869–898.10.1080/0020754042000298520
  • Stevenson, M., Y. Huang, L. C. Hendry, and E. Soepenberg. 2011. “The Theory & Practice of Workload Control: A Research Agenda & Implementation Strategy.” International Journal of Production Economics 131: 689–700.10.1016/j.ijpe.2011.02.018
  • Stevenson, M., and C. Silva. 2008. “Theoretical Development of a Workload Control Methodology: Evidence from Two Case Studies.” International Journal of Production Research 46: 3107–3131.10.1080/00207540601039791
  • Thuerer, M., C. Silva, and M. Stevenson. 2010. “Workload Control Release Mechanisms: From Practice back to Theory Building.” International Journal of Production Research 48: 3593–3617.10.1080/00207540902922810
  • Thuerer, M., M. Stevenson, and M. J. Land. 2016. “On the Integration of Input and Output Control: Workload Control Order Release.” International Journal of Production Economics 174: 43–53.10.1016/j.ijpe.2016.01.005
  • Thuerer, M., M. Stevenson, and C. Silva. 2011. “Three Decades of Workload Control Research: A Systematic Review of the Literature.” International Journal of Production Research 49: 6905–6935.10.1080/00207543.2010.519000
  • Thuerer, M., M. Stevenson, C. Silva, and G. Huang. 2012. “The Application of Workload Control in Assembly Job Shops: An Assessment by Simulation.” International Journal of Production Research 50: 5048–5062.10.1080/00207543.2011.631600
  • Thuerer, M., M. Stevenson, C. Silva, and M. Land. 2013. “Towards an Integrated Workload Control (WLC) Concept: The Performance of Due Date Setting Rules in Job Shops with Contingent Orders.” International Journal of Production Research 51: 4502–4516.
  • Thuerer, M., M. Stevenson, and T. Qu. 2016a. “Job Sequencing and Selection within Workload Control Order Release: An Assessment by Simulation.” International Journal of Production Research 50: 5048–5062.
  • Thuerer, M., M. Stevenson, and T. Qu. 2016b. “Job Sequencing and Selection within Workload Control Order Release: An Assessment by Simulation.” International Journal of Production Research 54: 1061–1075.10.1080/00207543.2015.1047978
  • Ulfers, H.-A. 1991. “Erfahrungen mit der belastungsorientierten Auftragsfreigabe bei der Siemens AG.” [Experiences with Load Oriented Order Release at Siemens AG]. In Praxis der Belastungsorientierten Fertigungssteuerung [Load oriented order release in practice], edited by H. P. Wiendahl, 149–169. Munich: Carl Hanser.
  • Voss, C., M. Johnson, and J. Godsell. 2016. “Case Research.” In Research Methods for Operations Management, edited by C. Karlsson, 165–197. New York: Routledge.
  • Wiendahl, H. P. 1995. Load-Oriented Manufacturing Control. Berlin: Springer.10.1007/978-3-642-57743-7
  • Wiendahl, H. P., J. Glässner, and D. Petermann. 1992. “Application of Load-Oriented Manufacturing Control in Industry.” Production Planning and Control 3 (2): 118–129.10.1080/09537289208919381
  • Wight, O. 1970. “Input/Output Control. a Real Handle on Lead Time.” Production and Inventory Management 11 (3): 9–31.
  • Yin, R. K. 2014. Case Study Research: Design and Methods. Thousand Oaks, CA: Sage.
  • Zäpfel, G., and H. Missbauer. 1993. “New Concepts for Production Planning and Control.” European Journal of Operational Research 67: 297–320.10.1016/0377-2217(93)90287-W