338
Views
4
CrossRef citations to date
0
Altmetric
Original Articles

A control theoretical modelling for velocity tuning of the conveyor belt in a dynamic mixed-model assembly line

, &
Pages 7473-7495 | Received 09 Mar 2017, Accepted 12 Aug 2017, Published online: 06 Sep 2017

References

  • Akgündüz, O. S., and S. Tunalı. 2010. “A Review of the Current Applications of Genetic Algorithms in Mixed-Model Assembly Line Sequencing.” International Journal of Production Research 49 (15): 4483–4503.
  • Aström, K. J., and T. Hägglund. 2006. Advanced PID Control. Durham, NC: ISA-The Instrumentation, Systems and Automation Society.
  • Aström, K. J., and R. M. Murray. 2010. Feedback Systems: An Introduction for Scientists and Engineers. Princeton, NJ: Princeton University Press.
  • Bautista, J., and A. Cano. 2011. “Solving Mixed Model Sequencing Problem in Assembly Lines with Serial Workstations with Work Overload Minimisation and Interruption Rules.” European Journal of Operational Research 210 (3): 495–513.10.1016/j.ejor.2010.10.022
  • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2015. “An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times.” International Journal of Production Research 53 (6): 1807–1818.10.1080/00207543.2014.961212
  • Bentaha, M. L., O. Battaïa, A. Dolgui, and S. J. Hu. 2015. “Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints.” European Journal of Operational Research 247 (3): 957–967.10.1016/j.ejor.2015.06.019
  • Bock, S., and O. Rosenberg. 2006. “Controlling Mixed-Model Assembly Lines in Real-Time by Using Distributed Systems.” European Journal of Operational Research 168 (3): 880–904.10.1016/j.ejor.2004.07.035
  • Bolat, A., M. Savsar, and M. A. Al-Fawzan. 1994. “Algorithms for Real-Time Scheduling of Jobs on Mixed Model Assembly Lines.” Computers & Operations Research 21 (5): 487–498.10.1016/0305-0548(94)90098-1
  • Boysen, N., M. Fliedner, and A. Scholl. 2007. “A Classification of Assembly Line Balancing Problems.” European Journal of Operational Research 183 (2): 674–693.10.1016/j.ejor.2006.10.010
  • Boysen, N., M. Fliedner, and A. Scholl. 2009. “Sequencing Mixed-Model Assembly Lines: Survey, Classification and Model Critique.” European Journal of Operational Research 192 (2): 349–373.10.1016/j.ejor.2007.09.013
  • Boysen, N., M. Fliedner, and A. Scholl. 2009. “Production Planning of Mixed-Model Assembly Lines: Overview and Extensions.” Production Planning & Control 20 (5): 455–471.10.1080/09537280903011626
  • Boysen, N., M. Kiel, and A. Scholl. 2010. “Sequencing Mixed-Model Assembly Lines to Minimise the Number of Work Overload Situations.” International Journal of Production Research 49 (16): 4735–4760.
  • Cano-Belmán, J., R. Ríos-Mercado, and J. Bautista. 2010. “A Scatter Search Based Hyper-Heuristic for Sequencing a Mixed-Model Assembly Line.” Journal of Heuristics 16 (6): 749–770.10.1007/s10732-009-9118-2
  • Cortez, P. M. C., and A. M. Costa. 2015. “Sequencing Mixed-Model Assembly Lines Operating with a Heterogeneous Workforce.” International Journal of Production Research 53 (11): 3419–3432.10.1080/00207543.2014.987881
  • Duffie, N., A. Chehade, and A. Athavale. 2014. “Control Theoretical Modeling of Transient Behavior of Production Planning and Control: A Review.” Procedia CIRP 17: 20–25.10.1016/j.procir.2014.01.099
  • Fattahi, P., and M. Salehi. 2009. “Sequencing the Mixed-Model Assembly Line to Minimize the Total Utility and Idle Costs with Variable Launching Interval.” The International Journal of Advanced Manufacturing Technology 45 (9–10): 987–998.10.1007/s00170-009-2020-0
  • Fazel Zarandi, M. H., and H. Mosadegh. 2016. “Robotics and Control Systems.” In Fuzzy Logic in Its 50th Year: New Developments, Directions and Challenges, edited by C. Kahraman, U. Kaymak, and A. Yazici, 283–308. Cham: Springer International Publishing.
  • Fliedner, M., N. Boysen, and A. Scholl. 2011. “On the Part Inventory Model Sequencing Problem: Complexity and Beam Search Heuristic.” Journal of Scheduling 14 (1): 17–25.10.1007/s10951-010-0214-9
  • Golle, U., F. Rothlauf, and N. Boysen. 2014. “Car Sequencing Versus Mixed-Model Sequencing: A Computational Study.” European Journal of Operational Research 237 (1): 50–61.10.1016/j.ejor.2014.01.012
  • Gujjula, R., and H. O. Gunther. 2009. “Scheduling Utility Workers at Mixed-Model Assembly Lines.” In Industrial Engineering and Engineering Management, IEEM 2009 IEEE International Conference on 2009, Hong Kong, 1092–1096.
  • Hamzadayi, A., and G. Yildiz. 2013. “A Simulated Annealing Algorithm Based Approach for Balancing and Sequencing of Mixed-Model U-Lines.” Computers & Industrial Engineering 66 (4): 1070–1084.10.1016/j.cie.2013.08.008
  • Hazır, Ö., and A. Dolgui. 2015. “A Decomposition Based Solution Algorithm for U-Type Assembly Line Balancing with Interval Data.” Computers & Operations Research 59: 126–131.10.1016/j.cor.2015.01.010
  • He, D., Y. Pang, and G. Lodewijks. 2016. “Speed Control of Belt Conveyors during Transient Operation.” Powder Technology 301: 622–631.10.1016/j.powtec.2016.07.004
  • Hyun, C. J., Y. Kim, and Y. K. Kim. 1998. “A Genetic Algorithm for Multiple Objective Sequencing Problems in Mixed Model Assembly Lines.” Computers & Operations Research 25 (7–8): 675–690.10.1016/S0305-0548(98)00026-4
  • Jiménez, P. 2013. “Survey on Assembly Sequencing: A Combinatorial and Geometrical Perspective.” Journal of Intelligent Manufacturing 24 (2): 235–250.10.1007/s10845-011-0578-5
  • Kim, Y. K., C. J. Hyun, and Y. Kim. 1996. “Sequencing in Mixed Model Assembly Lines: A Genetic Algorithm Approach.” Computers & Operations Research 23 (12): 1131–1145.10.1016/S0305-0548(96)00033-0
  • Kim, S., and B. Jeong. 2007. “Product Sequencing Problem in Mixed-Model Assembly Line to Minimize Unfinished Works.” Computers & Industrial Engineering 53 (2): 206–214.10.1016/j.cie.2007.06.011
  • Lauhoff, H. 2005. “Speed Control on Belt Conveyors-Does It Really Save Energy?” ZKG International 58 (12): 368–377.
  • Liu, C., W. Li, J. Lian, and Y. Yin. 2012. “Reconfiguration of Assembly Systems: From Conveyor Assembly Line to Serus.” Journal of Manufacturing Systems 31 (3): 312–325.10.1016/j.jmsy.2012.02.003
  • Liu, R., P. Lou, D. Tang, and L. Yang. 2010. “A Hybrid Immune Algorithm for Sequencing the Mixed-Model Assembly Line with Variable Launching Intervals.” In Information Computing and Applications: Springer, edited by R. Zhu, Y. Zhang, B. Liu, and C. Liu, 399–406. Heidelberg: Springer Berlin Heidelberg.10.1007/978-3-642-16336-4
  • Liu, C., K. E. Stecke, J. Lian, and Y. Yin. 2014. “An Implementation Framework for Seru Production.” International Transactions in Operational Research 21 (1): 1–19.10.1111/itor.2014.21.issue-1
  • Liu, Q., W.-X. Wang, K.-R. Zhu, C.-Y. Zhang, and Y.-Q. Rao. 2013. “Advanced Scatter Search Approach and Its Application in a Sequencing Problem of Mixed-Model Assembly Lines in a Case Company.” Engineering Optimization 46 (11): 1485–1500.
  • Lodewijks, G., D. Schott, and Y. Pang. 2011. “Energy Savings at Belt Conveyors by Speed Control.” In Proceedings of the Beltcon 16 Conference. Johannesburg, 2–3.
  • Miltenburg, J., G. Steiner, and S. Yeomans. 1990. “A Dynamic Programming Algorithm for Scheduling Mixed-Model, Just-in-Time Production Systems.” Mathematical and Computer Modelling 13 (3): 57–66.10.1016/0895-7177(90)90370-3
  • Mosadegh, H., S. M. T. Fatemi Ghomi, and G. A. Süer. 2017. “Heuristic Approaches for Mixed-Model Sequencing Problem with Stochastic Processing times.” International Journal of Production Research 55 (10): 2857–2880.
  • Mosadegh, H., S. M. T. Ghomi, and M. Zandieh. 2012. “Simultaneous Solving of Balancing and Sequencing Problems in Mixed-Model Assembly Line Systems.” International Journal of Production Research 50 (18): 4994–5016.10.1080/00207543.2011.625559
  • Mosadegh, H., M. Zandieh, and S. M. T. Ghomi. 2012. “Simultaneous Solving of Balancing and Sequencing Problems with Station-Dependent Assembly times for Mixed-Model Assembly Lines.” Applied Soft Computing 12 (4): 1359–1370.10.1016/j.asoc.2011.11.027
  • O’Dwyer, A. 2009. Handbook of PI and PID Controller Tuning Rules. London: Imperial College Press.10.1142/p575
  • Prajapat, N., and A. Tiwari. 2017. “A Review of Assembly Optimisation Applications Using Discrete Event Simulation.” International Journal of Computer Integrated Manufacturing 30 (2–3): 215–228.10.1080/0951192X.2016.1145812
  • Ribeiro, J., M. Santos, M. Carmo, and M. Silva. 2017. “Comparison of PID Controller Tuning Methods: Analytical/Classical Techniques versus Optimization Algorithms.” In Carpathian Control Conference (ICCC), 2017 18th International: IEEE, Sinaia, Romania, 533–538.
  • Rossi, A., E. Gurevsky, O. Battaïa, and A. Dolgui. 2016. “Maximizing the Robustness for Simple Assembly Lines with Fixed Cycle Time and Limited Number of Workstations.” Discrete Applied Mathematics 208: 123–136.10.1016/j.dam.2016.03.005
  • Sabuncuoğlu, İ, Y. Gocgun, and E. Erel. 2008. “Backtracking and Exchange of Information: Methods to Enhance a Beam Search Algorithm for Assembly Line Scheduling.” European Journal of Operational Research 186 (3): 915–930.10.1016/j.ejor.2007.02.024
  • Sotskov, Y. N., A. Dolgui, T.-C. Lai, and A. Zatsiupa. 2015. “Enumerations and Stability Analysis of Feasible and Optimal Line Balances for Simple Assembly Lines.” Computers & Industrial Engineering 90: 241–258.10.1016/j.cie.2015.08.018
  • Tamura, T., T. Okumura, T. Singh Dhakar, and K. Ohno. 2011. “Optimal Production Sequencing Problem to Minimise Line Stoppage Time in a Mixed-Model Assembly Line.” International Journal of Production Research 49 (14): 4299–4315.10.1080/00207543.2010.528061
  • Thomopoulos, N. T. 1967. “Line Balancing-Sequencing for Mixed-Model Assembly.” Management Science 14 (2): 59–B-75.10.1287/mnsc.14.2.B59
  • Tong, K.-N., K.-L. Xu, and Y.-Q. Zheng. 2013. “Sequencing Mixed-Model Flexible Assembly Lines with Variable Launching Intervals.” Journal of Shanghai Jiaotong University (Science) 18 (4): 460–467.10.1007/s12204-013-1420-3
  • Yu, Y., W. Sun, J. Tang, I. Kaku, and J. Wang. 2017. “Line-Seru Conversion towards Reducing Worker (S) without Increasing Makespan: Models, Exact and Meta-Heuristic Solutions.” International Journal of Production Research 55 (10): 2990–3007.10.1080/00207543.2017.1284359
  • Yu, Y., J. Tang, W. Sun, Y. Yin, and I. Kaku. 2013. “Reducing Worker(S) by Converting Assembly Line into a Pure Cell System.” International Journal of Production Economics 145 (2): 799–806.10.1016/j.ijpe.2013.06.009
  • Zhang, X., C. Liu, W. Li, S. Evans, and Y. Yin. 2017. “Effects of Key Enabling Technologies for Seru Production on Sustainable Performance.” Omega 66: 290–307.10.1016/j.omega.2016.01.013
  • Zhao, X., J. Liu, K. Ohno, and S. Kotani. 2007. “Modeling and Analysis of a Mixed-Model Assembly Line with Stochastic Operation times.” Naval Research Logistics 54 (6): 681–691.10.1002/(ISSN)1520-6750

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.