References
- Allahverdi, A. , J. N. Gupta , and T. Aldowaisan . 1999. “A Review of Scheduling Research Involving Setup Considerations.” Omega 27 (2): 219–239.10.1016/S0305-0483(98)00042-5
- Allahverdi, A. , C. T. Ng , T. C. E. Cheng , and M. Y. Kovalyov . 2008. “A Survey of Scheduling Problems with Setup times or Costs.” European Journal of Operational Research 187: 985–1032.10.1016/j.ejor.2006.06.060
- Avalos-Rosales, O. , F. Angel-Bello , and A. Alvarez . 2015. “Efficient Metaheuristic Algorithm and Re-Formulations for the Unrelated Parallel Machine Scheduling Problem with Sequence and Machine-Dependent Setup times.” International Journal of Advanced Manufacturing Technology 76: 1705–1718.10.1007/s00170-014-6390-6
- Bard, J. F. , Z. Gao , R. Chacon , and J. Stuber . 2013. “Daily Scheduling of Multi-Pass Lots at Assembly and Test Facilities.” International Journal of Production Research 51 (23–24): 7047–7070.10.1080/00207543.2012.758393
- Danping, L. , and C. K. Lee . 2011. “A Review of the Research Methodology for the Re-entrant Scheduling Problem.” International Journal of Production Research 49 (8): 2221–2242.10.1080/00207541003720350
- Deng, Y. , J. F. Bard , R. Chacon , and J. Stuber . 2010. “Scheduling Back-end Operations in Semiconductor Manufacturing.” IEEE Transactions on Semiconductor Manufacturing 23 (2): 210–220.10.1109/TSM.2010.2041399
- Duwayri, Z. , M. Mollaghasemi , D. Nazzal , and G. Rabadi . 2006. “Scheduling Setup Changes at Bottleneck Workstations in Semiconductor Manufacturing.” Production and Planning & Control 17 (7): 717–727.10.1080/09537280600901426
- Ellis, K. P. , Y. Lu , and E. K. Bish . 2004. “Scheduling of Wafer Test Processes in Semiconductor Manufacturing.” International Journal of Production Research 42 (2): 215–242.10.1080/0020754031000118116
- Gao, Z. , J. F. Bard , R. Chacon , and J. Stuber . 2015. “An Assignment-sequencing Methodology for Scheduling Assembly and Test Operations with Multi-pass Requirements.” IIE Transactions on Design & Manufacturing 47 (2): 153–172.
- Graves, S. C. , H. C. Meal , D. Stefek , and A. H. Zeghmi . 1983. “Scheduling of Re-entrant Flow Shops.” Journal of Operations Management 3 (4): 197–207.10.1016/0272-6963(83)90004-9
- Herr, O. , and A. Goel . 2016. “Minimising Total Tardiness for a Single Machine Scheduling Problem with Family Setups and Resource Constraints.” European Journal of Operational Research 248 (1): 123–135.10.1016/j.ejor.2015.07.001
- Janiak, A. , and M. Y. Kovalyov . 1995. “Single Machine Group Scheduling with Ordered Criteria.” Annals of Operations Research 57 (1): 191–201.10.1007/BF02099697
- Janiak, A. , M. Y. Kovalyov , and M. C. Portmann . 2005. “Single Machine Group Scheduling with Resource Dependent Setup and Processing times.” European Journal of Operational Research 162 (1): 112–121.10.1016/j.ejor.2002.11.004
- Kim, S. , and Y. Lee . 2016. “Synchronized Production Planning and Scheduling in Semiconductor Fabrication.” Computers & Industrial Engineering 96: 72–85.10.1016/j.cie.2016.03.019
- Lee, C. Y. , R. Uzsoy , and L. A. Martin-Vega . 1992. “Efficient Algorithms for Scheduling Semiconductor Burn-in Operations.” Operations Research 40 (4): 764–775.10.1287/opre.40.4.764
- Low, C. , T. H. Wu , and C. M. Hsu . 2005. “Mathematical Modelling of Multi-objective Job Shop Scheduling with Dependent Setups and Re-entrant Operations.” International Journal of Advanced Manufacturing Technology 27 (1–2): 181–189.10.1007/s00170-004-2137-0
- Martí, R. , J. M. Moreno-Vega , and A. Duarte . 2010. “Advanced Multi-Start Methods.” Handbook of Metaheuristics International Series in Operations Research & Management Science 146: 265–281.10.1007/978-1-4419-1665-5
- Mönch, L. , J. W. Fowler , S. Dauzère-Pérès , S. J. Mason , and O. Rose . 2011. “A Survey of Problems, Solution Techniques, and Future Challenges in Scheduling Semiconductor Manufacturing Operations.” Journal of Scheduling 14 (6): 583–599.10.1007/s10951-010-0222-9
- Pan, J. C. , and J. S. Chen . 2003. “Minimizing Makespan in Re-entrant Permutation Flow-shops.” Journal of the Operational Research Society 54 (6): 642–653.10.1057/palgrave.jors.2601556
- Pfund, M. , J. W. Fowler , A. Gadkari , and Y. Chen . 2008. “Scheduling Jobs on Parallel Machines with Setup times and Ready times.” Computers & Industrial Engineering 54 (4): 764–782.10.1016/j.cie.2007.08.011
- Rubin, P. A. , and G. L. Ragatz . 1995. “Scheduling in a Sequence Dependent Setup Environment with Genetic Search.” Computers & Operations Research 22 (1): 85–99.10.1016/0305-0548(93)E0021-K
- Sun, J. U. 2009. “A Genetic Algorithm for a Re-Entrant Job-shop Scheduling Problem with Sequence-dependent Setup times.” Engineering Optimization 41 (6): 505–520.10.1080/03052150802613335
- Weng, M. X. , J. Lu , and H. Ren . 2001. “Unrelated Parallel Machine Scheduling with Setup Consideration and a Total Weighted Completion Time Objective.” International Journal of Production Economics 70 (3): 215–226.10.1016/S0925-5273(00)00066-9
- Wilbrecht, J. K. , and W. B. Prescott . 1969. “The Influence of Setup Time on Job Shop Performance.” Management Science 16 (4): B-274–B-280.10.1287/mnsc.16.4.B274
- Wu, J. Z. , and C. F. Chien . 2008. “Modeling Semiconductor Testing Job Scheduling and Dynamic Testing Machine Configuration.” Expert Systems with Applications 35 (1–2): 485–496.10.1016/j.eswa.2007.07.026
- Zhao, C. , and Z. Wu . 2001. “A Genetic Algorithm Approach to the Scheduling of FMSs with Multiple Routes.” International Journal of Flexible Manufacturing Systems 13 (1): 71–88.10.1023/A:1008148313360