319
Views
9
CrossRef citations to date
0
Altmetric
Article

Optimal due date quoting for a risk-averse decision-maker under CVaR

, , &
Pages 1934-1959 | Received 06 Nov 2016, Accepted 01 Sep 2017, Published online: 03 Dec 2017

References

  • Abdel-Aal, M. A. M., and S. Z. Selim. 2017. “Risk-averse Multi-product Selective Newsvendor Problem with Different Market Entry Scenarios under CVaR Criterion.” Computers & Industrial Engineering 103: 250–261.10.1016/j.cie.2016.11.026
  • Baker, K. R. 2014. “Setting Optimal Due Dates in a Basic Safe-scheduling Model.” Computers & Operations Research 41: 109–114.10.1016/j.cor.2013.07.022
  • Chan, T. C. Y., H. Mahmoudzadeh, and T. G. Purdie. 2014. “A Robust-CVaR Optimization Approach with Application to Breast Cancer Therapy.” European Journal of Operational Research 238 (3): 876–885.10.1016/j.ejor.2014.04.038
  • Chen, Y., M. Xu, and Z. G. Zhang. 2009. “Technical Note – A Risk-averse Newsvendor Model under the CVaR Criterion.” Operations Research 57 (4): 1040–1044.10.1287/opre.1080.0603
  • Choi, S., A. Ruszczyński, and Y. Zhao. 2011. “A Multiproduct Risk-averse Newsvendor with Law-invariant Coherent Measures of Risk.” Operations Research 59 (2): 346–364.10.1287/opre.1100.0896
  • Dumond, J., and V. A. Mabert. 1988. “Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis.” Management Science 34 (1): 101–118.10.1287/mnsc.34.1.101
  • Elahi, E., M. Sheikhzadeh, and N. Lamba. 2014. “An Integrated Outsourcing Framework: Analyzing Boeing’s Outsourcing Program for Dreamliner (B787).” Knowledge and Process Management 21 (1): 13–28.10.1002/kpm.v21.1
  • Elimam, A. A., and B. Dodin. 2013. “Project Scheduling in Optimizing Integrated Supply Chain Operations.” European Journal of Operational Research 224 (3): 530–541.10.1016/j.ejor.2012.09.007
  • Gordon, V. S., and V. A. Strusevich. 2009. “Single Machine Scheduling and Due Date Assignment with Positionally Dependent Processing times.” European Journal of Operational Research 198 (1): 57–62.10.1016/j.ejor.2008.07.044
  • Gordon, V. S., V. A. Strusevich, and A. Dolgui. 2012. “Scheduling with Due Date Assignment under Special Conditions on Job Processing.” Journal of Scheduling 15 (4): 447–456.10.1007/s10951-011-0240-2
  • Guhlich, H., M. Fleischmann, and R. Stolletz. 2015. “Revenue Management Approach to Due Date Quoting and Scheduling in an Assemble-to-order Production System.” OR Spectrum 37 (4): 951–982.10.1007/s00291-015-0401-3
  • Hsiau, H. J., and C. W. R. Lin. 2009. “A Fuzzy Pert Approach to Evaluate Plant Construction Project Scheduling Risk under Uncertain Resources Capacity.” Journal of Industrial Engineering and Management 2 (1): 31–47.
  • Keskinocak, P., and S. Tayur. 2004. “Due Date Management Policies.” In International Series in Operations Research and Management Science. Berlin: Springer.
  • Lauff, V., and F. Werner. 2004. “Scheduling with Common Due Date, Earliness and Tardiness Penalties for Multimachine Problems: A Survey.” Mathematical and Computer Modelling 40 (5–6): 637–655.10.1016/j.mcm.2003.05.019
  • Lu, Y. Y., G. Li, Y. B. Wu, and P. Ji. 2014. “Optimal Due-date Assignment Problem with Learning Effect and Resource-dependent Processing times.” Optimization Letters 8 (1): 113–127.10.1007/s11590-012-0467-7
  • Luo, Z., J. Wang, and W. Chen. 2015. “A Risk-averse Newsvendor Model with Limited Capacity and Outsourcing under the CVaR Criterion.” Journal of Systems Science and Systems Engineering 24 (1): 49–67.10.1007/s11518-015-5263-3
  • Mansouri, S. A., D. Gallear, and M. H. Askariazad. 2012. “Decision Support for Build-to-order Supply Chain Management through Multiobjective Optimization.” International Journal of Production Economics 135 (1): 24–36.10.1016/j.ijpe.2010.11.016
  • Martinsuo, M. 2013. “Project Portfolio Management in Practice and in Context.” International Journal of Project Management 31 (6): 794–803.10.1016/j.ijproman.2012.10.013
  • Moodie, D. R. 1999. “Due Date Demand Management: Negotiating the Trade-off between Price and Delivery.” International Journal of Production Research 37 (5): 997–1021.10.1080/002075499191373
  • Nguyen, T. H., and M. Wright. 2015. “Capacity and Lead-time Management When Demand for Service is Seasonal and Lead-time Sensitive.” European Journal of Operational Research 247 (2): 588–595.10.1016/j.ejor.2015.06.005
  • Pan, A., and T. M. Choi. 2016. “An Agent-based Negotiation Model on Price and Delivery Date in a Fashion Supply Chain.” Annals of Operations Research 242 (2): 529–557.10.1007/s10479-013-1327-2
  • Panwalkar, S. S., M. L. Smith, and A. Seidmann. 1982. “Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem.” Operations Research 30 (2): 391–399.10.1287/opre.30.2.391
  • Park, M., D. Lee, K. Shin, and J. Park. 2010. “Business Integration Model with Due-date Re-negotiations.” Industrial Management & Data Systems 110 (3): 415–432.10.1108/02635571011030051
  • Pekgün, P., P. M. Griffin, and P. Keskinocak. 2008. “Coordination of Marketing and Production for Price and Leadtime Decisions.” IIE Transactions 40 (1): 12–30.10.1080/07408170701245346
  • Portougal, V., and D. Trietsch. 2006. “Setting Due Dates in a Stochastic Single Machine Environment.” Computers & Operations Research 33 (6): 1681–1694.10.1016/j.cor.2004.11.014
  • Rasti-Barzoki, M., and S. R. Hejazi. 2013. “Minimizing the Weighted Number of Tardy Jobs with Due Date Assignment and Capacity-constrained Deliveries for Multiple Customers in Supply Chains.” European Journal of Operational Research 228 (2): 345–357.10.1016/j.ejor.2013.01.002
  • Rockafellar, R. T., and S. Uryasev. 2000. “Optimization of Conditional Value-at-risk.” The Journal of Risk 2: 21–41.10.21314/JOR.2000.038
  • Sarin, S. C., H. D. Sherali, and L. Liao. 2014. “Minimizing Conditional-value-at-risk for Stochastic Scheduling Problems.” Journal of Scheduling 17 (1): 5–15.10.1007/s10951-013-0349-6
  • Shabtay, D. 2016. “Optimal Restricted Due Date Assignment in Scheduling.” European Journal of Operational Research 252 (1): 79–89.10.1016/j.ejor.2015.12.043
  • Shabtay, D., Y. Itskovich, L. Yedidsion, and D. Oron. 2010. “Optimal Due Date Assignment and Resource Allocation in a Group Technology Scheduling Environment.” Computers & Operations Research 37 (12): 2218–2228.10.1016/j.cor.2010.03.012
  • Shabtay, D., G. Steiner, and R. Zhang. 2016. “Optimal Coordination of Resource Allocation, Due Date Assignment and Scheduling Decisions.” Omega 65: 41–54.10.1016/j.omega.2015.12.006
  • Slotnick, S. A. 2014. “Lead-time Quotation When Customers Are Sensitive to Reputation.” International Journal of Production Research 52 (3): 713–726.10.1080/00207543.2013.828176
  • Soroush, H. M. 1999. “Sequencing and Due-date Determination in the Stochastic Single Machine Problem with Earliness and Tardiness Costs.” European Journal of Operational Research 113 (2): 450–468.
  • Xu, X. S., Z. Q. Meng, J. Min, and P. Ji. 2015. “Optimal Decisions for the Loss-averse Newsvendor Problem under CVaR.” International Journal of Production Economics 164: 146–159.
  • Yin, Y., W. H. Wu, T. C. E. Cheng, and C. C. Wu. 2014. “Due-date Assignment and Single-machine Scheduling with Generalised Position-dependent Deteriorating Jobs and Deteriorating Multi-maintenance Activities.” International Journal of Production Research 52 (8): 2311–2326.10.1080/00207543.2013.855833
  • Zhu, G., J. F. Bard, and G. Yu. 2007. “A Two-stage Stochastic Programming Approach for Project Planning with Uncertain Activity Durations.” Journal of Scheduling 10 (3): 167–180.10.1007/s10951-007-0008-x
  • Zika-Viktorsson, A., P. Sundström, and M. Engwall. 2006. “Project Overload: An Exploratory Study of Work and Management in Multi-project Settings.” International Journal of Project Management 24 (5): 385–394.10.1016/j.ijproman.2006.02.010

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.