913
Views
16
CrossRef citations to date
0
Altmetric
Articles

On the beat of the drum: improving the flow shop performance of the Drum–Buffer–Rope scheduling mechanism

&
Pages 3294-3305 | Received 23 Jun 2017, Accepted 19 Oct 2017, Published online: 13 Nov 2017

References

  • Ashcroft, S. H. 1989. “Applying the Principles of Optimized Production Technology in a Small Manufacturing Company.” Engineering Costs and Production Economics 17: 79–88.10.1016/0167-188X(89)90058-X
  • Baker, K. R., and J. J. Kanet. 1983. “Job Shop Scheduling with Modified Operation Due-Dates.” Journal of Operations Management 4 (1): 11–22.10.1016/0272-6963(83)90022-0
  • Blackstone, J. H., D. T. Philips, and G. L. Hogg. 1982. “A State-of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations.” International Journal of Production Research 20 (1): 27–45.10.1080/00207548208947745
  • Chakravorty, S. S. 2001. “An Evaluation of the DBR Control Mechanism in a Job Shop Environment.” Omega 29: 335–342.10.1016/S0305-0483(01)00028-7
  • Chakravorty, S. S., and J. B. Atwater. 2005. “The Impact of Free Goods on the Performance of Drum-Buffer-Rope Scheduling Systems.” International Journal of Production Economics 95: 347–357.10.1016/j.ijpe.2004.01.001
  • Chakravorty, S. S., and J. B. Atwater. 1996. “A Comparative Study of Line Design Approaches for Serial Production Systems.” International Journal of Operations & Production Management 16 (6): 91–108.10.1108/01443579610119117
  • Conway, R., W. L. Maxwell, and L. W. Miller. 1967. Theory of Scheduling. Reading, MA: Addisson-Wesley.
  • Craighead, C. W., J. W. Patterson, and L. D. Fredendall. 2001. “Protective Capacity Positioning: Impact on Manufacturing Cell Performance.” European Journal of Operational Research 134: 425–438.10.1016/S0377-2217(00)00266-6
  • Duclos, L. K., and M. S. Spencer. 1995. “The Impact of a Constraint Buffer in a Flow Shop.” International Journal of Production Economics 42: 175–185.10.1016/0925-5273(95)00197-2
  • Enns, S. T., and M. Prongue Costa. 2002. “The Effectiveness of Input Control Based on Aggregate versus Bottleneck Workloads.” Production Planning & Control 13 (7): 614–624.10.1080/0953728021000026258
  • Fernandes, N. O., M. J. Land, and S. Carmo-Silva. 2014. “Workload Control in Unbalanced Job Shops.” International Journal of Production Research 52 (3): 679–690.10.1080/00207543.2013.827808
  • Framinan, J. M., R. Ruiz-Usano, and R. Leisten. 2001. “Sequencing CONWIP Flow-shops: Analysis and Heuristics.” International Journal of Production Research 39 (12): 2735–2749.10.1080/00207540110048972
  • Fredendall, L. D., and B. R. Lea. 1997. “Improving the Product Mix Heuristic in the Theory of Constraints.” International Journal of Production Research 35 (6): 1535–1544.10.1080/002075497195100
  • Gilland, W. G. 2002. “A Simulation Study Comparing Performance of CONWIP and Bottleneck-based Release Rules.” Production Planning & Control 13 (2): 211–219.10.1080/09537280110069784
  • Goldratt, E. M. 1990. Haystack Syndrome: Sifting Information out of the Data Ocean. New York: North River Press.
  • Goldratt, E. M., and J. Cox. 1984. The Goal: Excellence in Manufacturing. New York: North River Press.
  • Golmohammadi, D. 2015. “A Study of Scheduling under the Theory of Constraints.” International Journal of Production Economics 165: 38–50.10.1016/j.ijpe.2015.03.015
  • Gupta, M., and D. Snyder. 2009. “Comparing TOC with MRP and JIT: A Literature Review.” International Journal of Production Research 47 (13): 3705–3739.10.1080/00207540701636322
  • Lambrecht, M. R., and A. Segaert. 1990. “Buffer Stock Allocation in Serial and Assembly Type of Production Lines.” International Journal of Operations & Production Management 10 (2): 47–61.10.1108/01443579010000736
  • Land, M. J., M. Stevenson, M. Thürer, and G. J. C. Gaalman. 2015. “Job Shop Control: In Search of the Key to Delivery Improvements.” International Journal of Production Economics 168: 257–266.10.1016/j.ijpe.2015.07.007
  • Leu, B. Y. 2000. “Generating a Backlog List for a CONWIP Production Line: A Simulation Study.” Production Planning & Control 11 (4): 409–418.10.1080/095372800232144
  • Luebbe, R., and B. Finch. 1992. “Theory of Constraints and Linear Programming: A Comparison.” International Journal of Production Research 30 (6): 1471–1478.10.1080/00207549208942967
  • Mabin, V. J., and S. J. Balderstone. 2003. “The Performance of the Theory of Constraints Methodology: Analysis and Discussion of Successful TOC Applications.” International Journal of Operations & Production Management 23: 568–595.10.1108/01443570310476636
  • Panwalkar, S. S., and W. Iskander. 1977. A Survey of Scheduling Rules. Operations Research January–February: 45–61.10.1287/opre.25.1.45
  • Radovilsky, Z. D. 1998. “A Quantitative Approach to Estimate the Size of the Time Buffer in the Theory of Constraints.” International Journal of Production Economics 55: 113–119.10.1016/S0925-5273(97)00131-X
  • Rahman, S. 1998. “Theory of Constraints: A Review of the Philosophy and Its Applications.” International Journal of Operations & Production Management 18: 336–355.10.1108/01443579810199720
  • Schragenheim, E., and B. Ronen. 1990. “Drum-Buffer-Rope Shop Floor Control.” Production & Inventory Management Journal 31: 18–22.
  • Simons, J. V., and W. P. Simpson III. 1997. “An Exposition of Multiple Constraint Scheduling as Implemented in the Goal System (Formerly Disaster).” Production & Operations Management 6: 3–22.
  • Sirikrai, V., and P. Yenradee. 2006. “Modified Drum–Buffer–Rope Scheduling Mechanism for a Non-Identical Parallel Machine Flow Shop with Processing-Time Variation.” International Journal of Production Research 44 (17): 3509–3531.10.1080/00207540600584805
  • Spearman, M. L., D. L. Woodruff, and W. J. Hopp. 1990. “CONWIP: A Pull Alternative to Kanban.” International Journal of Production Research 28 (5): 879–894.10.1080/00207549008942761
  • Steele, D. C., P. R. Philipoom, M. K. Malhotra, and T. D. Fry. 2005. “Comparisons between Drum-Buffer-Rope and Material Requirements Planning: A Case Study.” International Journal of Production Research 43 (15): 3181–3208.10.1080/00207540500076704
  • Thürer, M., N. O. Fernandes, M. Stevenson, and T. Qu. 2017. “On the Backlog-sequencing Decision for Extending the Applicability of ConWIP to High-Variety Contexts: An Assessment by Simulation.” International Journal of Production Research 55 (16): 4695–4711.
  • Thürer, M., M. Stevenson, C. Silva, and T. Qu. 2017. “Drum-Buffer-Rope and Workload Control in High Variety Flow and Job Shops with Bottlenecks: An Assessment by Simulation.” International Journal of Production Economics 188: 116–127.
  • Thürer, M., T. Qu, M. Stevenson, C. D. Li, and G. Q. Huang. 2017. “Deconstructing Bottleneck Shiftiness: The Impact of the Bottleneck Position in an Order Release controlled Pure Flow Shop.” Production Planning & Control 28 (15): 1223–1235.
  • Watson, K. J., and A. Patti. 2008. “A Comparison of JIT and TOC Buffering Philosophies on System Performance with Unplanned Machine Downtime.” International Journal of Production Research 46 (7): 1869–1885.10.1080/00207540600972943
  • Watson, K. J., J. H. Blackstone, and S. C. Gardiner. 2007. “The Evolution of a Management Philosophy: The Theory of Constraints.” Journal of Operations Management 25: 387–402.10.1016/j.jom.2006.04.004
  • Wu, H. H., and M. L. Yeh. 2006. “A DBR Scheduling Method for Manufacturing Environments with Bottleneck Re-entrant Flows.” International Journal of Production Research 44 (5): 883–902.10.1080/00207540500362187

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.