234
Views
6
CrossRef citations to date
0
Altmetric
Articles

Clamping-sequence optimisation based on heuristic algorithm for sheet-metal components

&
Pages 7190-7200 | Received 27 Nov 2016, Accepted 20 Nov 2017, Published online: 07 Dec 2017

References

  • Benkalai, I., D. Rebaine, C. Gagné, and P. Baptiste. 2017. “Improving the Migrating Birds Optimization Metaheuristic for the Permutation Flow Shop with Sequence-Dependent Set-up times.” International Journal of Production Research 55 (20): 6145–6157.10.1080/00207543.2017.1327732
  • Cai, W., S. J. Hu, and J. X. Yuan. 1996. “Deformable Sheet Metal Fixturing: Principles, Algorithms and Simulations.” Journal of Manufacturing Science and Engineering 118 (3): 318–324.10.1115/1.2831031
  • Camelio, J. A., S. J. Hu, and D. Ceglarek. 2004. “Impact of Fixture Design on Sheet Metal Assembly Variation.” Journal of Manufacturing Systems 23 (3): 182–193.10.1016/S0278-6125(05)00006-3
  • Cochran, D. S., J. T. Foley, and Z. M. Bi. 2017. “Use of the Manufacturing System Design Decomposition for Comparative Analysis and Effective Design of Production Systems.” International Journal of Production Research 55 (3): 870–890.10.1080/00207543.2016.1218088
  • Cogun, C. 1992. “The Importance of the Application Sequence of Clamping Forces on Workpiece Accuracy.” Transactions of the ASME Journal of Engineering for Industry 114 (4): 539–543.10.1115/1.2900709
  • De Meter, E. C., W. Xie, and S. Choudhuri. 2001. “A Model to Predict Minimum Required Clamp Pre-Loads in Light of Fixture–Workpiece Compliance.” International Journal of Machine Tools & Manufacture 41 (7): 1031–1054.10.1016/S0890-6955(00)00114-0
  • Dong, H. Y., and Y. L. Ke. 2004. “Finite Element Simulation for Optimal Clamping Scheme of Thin-Walled Workpiece in Milling Process.” Journal of Zhejiang University (Engineering Science) 38 (1): 17–21.
  • Kang, Y. Z., Y. M. Rong, J. C. Yang, and W. Ma. 2002. “Computer‐Aided Fixture Design Verification.” Assembly Automation 22 (4): 350–359.10.1108/01445150210446229
  • Kim, H. W., and D. H. Lee. Forthcoming. “An Optimal Algorithm for Selective Disassembly Sequencing with Sequence-Dependent Set-Ups in Parallel Disassembly Environment.” International Journal of Production Research. doi:10.1080/00207543.2017.1342879
  • Lai, X. M., Y. F. Xing, J. Sun, and G. L. Chen. 2009. “Optimisation of Assembly Sequences for Compliant Body Assemblies.” International Journal of Production Research 47 (21): 6129–6143.10.1080/00207540802172037
  • Liao, J. M. 2002. “Fixturing Analysis for Stability Consideration in an Automated Fixture Design System.” Journal of Manufacturing Science and Engineering 124 (2): 98–104.
  • Liao, Y. J. G., and S. J. Hu. 2000. “Flexible Multibody Dynamics Based Fixture-Workpiece Analysis Model for Fixturing Stability.” International Journal of Machine Tools & Manufacture 40 (3): 343–362.10.1016/S0890-6955(99)00067-X
  • Liu, S. R., and J. S. Lian. 1997. “Automotive Covering Parts of Springback Defect Analysis.” Automotive Technology 7 (1997): 39–43.
  • Qin, G. H., W. H. Zhang, and M. Wang. 2005. “Modeling and Application of Workpiece Stability Based on the Linear Programming Method.” Chinese Journal of Mechanical Engineering 41 (9): 33–41.10.3901/JME.2005.09.033
  • Raghu, A., and S. N. Melkote. 2004. “Analysis of the Effects of Fixture Clamping Sequence on Part Location Errors.” International Journal of Machine Tools & Manufacture 44 (4): 373–382.10.1016/j.ijmachtools.2003.10.015
  • Shoval, S., M. Efatmaneshnik, and M. J. Ryan. 2017. “Assembly Sequence Planning for Processes with Heterogeneous Reliabilities.” International Journal of Production Research 55 (10): 2806–2828.10.1080/00207543.2016.1213449
  • Wang, Z. H. 2000. “Since Auto Manufacturing Testing Calculation.” PhD Thesis, Beijing University of Science and Technology. (in Chinese).
  • Wang, J. 2004. “A Study on Measurement Fixture Design for Complex Deformable Sheet Metal Workpieces.” PhD Thesis, Shanghai Jiaotong University. (in Chinese).
  • Xing, Y. F. 2008. “Assembly Sequence Optimization of Auto-Body Parts Based on Compliant Assembly Variation Analysis.” PhD Thesis, Shanghai Jiaotong University. (in Chinese).
  • Xing, Y. F., and Y. S. Wang. 2012. “Assembly Sequence Planning Based on a Hybrid Particle Swarm Optimisation and Genetic Algorithm.” International Journal of Production Research. 50 (24): 7303–7312.10.1080/00207543.2011.648276
  • Xing, Y. F., and Y. S. Wang. 2013. “Fixture Layout Design Based on Two-Stage Method for Sheet Metal Components.” Journal of Engineering Manufacture 227 (1): 162–172.10.1177/0954405412463132
  • Xing, Y. F., S. Jin, X. M. Lai, and G. L. Chen. 2009. “Application of Response Surface Methodology Based on Radial Basis Function in Fixture Design.” Journal of Computer-Aided Design & Computer Graphics 21 (1): 101–106. (in Chinese).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.