1,011
Views
28
CrossRef citations to date
0
Altmetric
Regular Articles

Resilience for lean organisational network

, & ORCID Icon
Pages 6917-6936 | Received 21 Jan 2017, Accepted 19 Mar 2018, Published online: 06 Apr 2018

References

  • Al-Ammar, E., and J. Fisher. 2006. “Resiliency Assessment of the Power System Network to Cyber and Physical Attacks.” In IEEE Power Engineering Society General Meeting, Montreal, Que., Canada, 2006, 7. doi:10.1109/PES.2006.1709089.
  • Alamri, A. A., and Z. T. Balkhi. 2007. “The Effects of Learning and Forgetting on the Optimal Production Lot Size for Deteriorating Items with Time Varying Demand and Deterioration Rates.” International Journal of Production Economics 107 (1): 125–138. doi:10.1016/j.ijpe.2006.08.004.
  • Anzanello, M. J., and F. S. Fogliatto. 2007. “Learning Curve Modelling of Work Assignment in Mass Customized Assembly Lines.” International Journal of Production Research 45 (13): 2919–2938. doi:10.1080/00207540600725010.
  • Anzanello, M. J., and F. S. Fogliatto. 2011a. “Learning Curve Models and Applications: Literature Review and Research Directions.” International Journal of Industrial Ergonomics 41 (5): 573–583. doi:10.1016/j.ergon.2011.05.001.
  • Anzanello, M. J., and F. S. Fogliatto. 2011b. “Selecting the Best Clustering Variables for Grouping Mass-Customized Products Involving Workers’ Learning.” International Journal of Production Economics 130 (2): 268–276. doi:10.1016/j.ijpe.2011.01.009.
  • Anzanello, M. J., F. S. Fogliatto, and L. Santos. 2014. “Learning Dependent Job Scheduling in Mass Customized Scenarios Considering Ergonomic Factors.” International Journal of Production Economics 154: 136–145. doi:10.1016/j.ijpe.2014.04.016.
  • Ates, A., and U. Bititci. 2011. “Change Process: A Key Enabler for Building Resilient SMEs.” International Journal of Production Research 49 (18): 5601–5618. doi:10.1080/00207543.2011.563825.
  • Badiru, A. B. 1992. “Computational Survey of Univariate and Multivariate Learning Curve Models.” IEEE Transactions on Engineering Management 39 (2): 176–188. doi:10.1109/17.141275.
  • Bevilacqua, M., F. E. Ciarapica, and I. De Sanctis. 2017. “Lean Practices Implementation and Their Relationships with Operational Responsiveness and Company Performance: An Italian Study.” International Journal of Production Research 55 (3): 769–794. doi:10.1080/00207543.2016.1211346.
  • Birkie, S. E. 2015. “Be Lean to Be Resilient: Setting Capabilities for Turbulent times.” Doctoral thesis. KTH Royal Institute of Technology.
  • Birkie, S. E. 2016. “Operational Resilience and Lean: In Search of Synergies and Trade-Offs.” Journal of Manufacturing Technology Management 27 (2): 185–207.10.1108/JMTM-07-2015-0054
  • Bortolotti, T., P. Danese, B. B. Flynn, and P. Romano. 2015. “Leveraging Fitness and Lean Bundles to Build the Cumulative Performance Sand Cone Model.” International Journal of Production Economics 162: 227–241. doi:10.1016/j.ijpe.2014.09.014.
  • Brunsdon, D., E. Seville, and J. Vargo. 2007. “Resilience Management: A Framework for Assessing and Improving the Resilience of Organisations.” Technical Report, Resilient Organisations Research Report.
  • Castells, M. 2011. “Network Theory| a Network Theory of Power.” International Journal of Communication 5: 15.
  • Christopher, M., and H. Peck. 2004. “Building the Resilient Supply Chain.” The International Journal of Logistics Management 15 (2): 1–14.10.1108/09574090410700275
  • Clapp-Smith, R., G. R. Vogelgesang, and J. B. Avey. 2009. “Authentic Leadership and Positive Psychological Capital.” Journal of Leadership & Organizational Studies 15 (3): 227–240. doi:10.1177/1548051808326596.
  • Cowling, A. 1998. “Chapter 2 – Recruitment and Retention.” In Managing Human Resources, 3rd ed., 23–35. Oxford: Butterworth-Heinemann.
  • Cross, R. L., J. Singer, S. Colella, R. J. Thomas, and Y. Silverstone. 2010. The Organizational Network Fieldbook: Best Practices, Techniques and Exercises to Drive Organizational Innovation and Performance. San Francisco, CA, USA: Jossey-Bass.
  • Dalziell, E. P., and S. T. McManus. 2004. “Resilience, Vulnerability, and Adaptive Capacity: Implications for System Performance.” In International Forum for Engineering Decision Making, Stoos, Switzerland. December 6–8.
  • Danese, P., P. Romano, and T. Bortolotti. 2012. “JIT Production, JIT Supply and Performance: Investigating the Moderating Effects.” Industrial Management & Data Systems 112 (3): 441–465.10.1108/02635571211210068
  • Diez, J. V., J. Ordieres-Mere, and G. Nuber. 2015. “The HOSHIN KANRI TREE. Cross-Plant Lean Shopfloor Management.” Procedia CIRP 32: 150–155. doi:10.1016/j.procir.2015.02.120.
  • Dombrowski, U., T. Mielke, and C. Engel. 2012. “Knowledge Management in Lean Production Systems.” Procedia CIRP 3: 436–441. doi:10.1016/j.procir.2012.07.075.
  • Durugbo, C., A. Tiwari, and J. R. Alcock. 2013. “Modelling Information Flow for Organisations: A Review of Approaches and Future Challenges.” International Journal of Information Management 33 (3): 597–610. doi:10.1016/j.ijinfomgt.2013.01.009.
  • George, S., and J. Everly. 2011. “Building a Resilient Organizational Culture.” Harvard Business Review (Blog posted June 24th, 2011).
  • Ghahramani, Z. 2001. “An Introduction to Hidden Markov Models and Bayesian Networks.” International Journal of Pattern Recognition and Artificial Intelligence 15 (1): 9–42. doi:10.1142/S0218001401000836.
  • Goldberg, D. E. 1989. Genetic Algorithms in Search, Optimization and Machine Learning. 1st ed. Boston, MA : Addison-Wesley Longman.
  • Greve, A., M. Benassi, and A. D. Sti. 2010. “Exploring the Contributions of Human and Social Capital to Productivity.” International Review of Sociology 20: 35–58. doi:10.1080/03906701003643261.
  • Harter, J. K., F. L. Schmidt, and T. L. Hayes. 2002. “Business-Unit-Level Relationship between Employee Satisfaction, Employee Engagement, and Business Outcomes: A Meta-Analysis.” Journal of Applied Psychology 87 (2): 268–279.10.1037/0021-9010.87.2.268
  • Henry, D., and J. Emmanuel Ramirez-Marquez. 2012. “Generic Metrics and Quantitative Approaches for System Resilience as a Function of Time.” Reliability Engineering & System Safety 99: 114–122. doi:10.1016/j.ress.2011.09.002.
  • Holling, C. S. 1973. “Resilience and Stability of Ecological Systems.” Annual Review of Ecology and Systematics 4 (1): 1–23. doi:10.1146/annurev.es.04.110173.000245.
  • Holweg, M. 2007. “The Genealogy of Lean Production.” Journal of Operations Management 25 (2): 420–437. doi:10.1016/j.jom.2006.04.001.
  • Hosseini, S., K. Barker, and J. E. Ramirez-Marquez. 2016. “A Review of Definitions and Measures of System Resilience.” Reliability Engineering & System Safety 145: 47–61. doi:10.1016/j.ress.2015.08.006.
  • Jackson, S. E., C. H. Chuang, E. E. Harden, and Y. Jiang. 2006, “Toward Developing Human Resource Management Systems for Knowledge-Intensive Teamwork.” In Research in Personnel and Human Resources Management, edited by Joseph J.Martocchio, Vol. 25, 27–70. Emerald Group Publishing Limited.
  • Jadhav, R. J., S. S. Mantha, and S. B. Rane. 2014. “Exploring Barriers in Lean Implementation.” International Journal of Lean Six Sigma 5: 122–148. doi:10.1108/IJLSS-12-2012-0014.
  • Kamalahmadi, M., and M. M. Parast. 2016. “A Review of the Literature on the Principles of Enterprise and Supply Chain Resilience: Major Findings and Directions for Future Research.” International Journal of Production Economics 171, Part, 116–133. doi:10.1016/j.ijpe.2015.10.023.
  • Katayama, Hiroshi, and David Bennett. 1996. “Lean Production in a Changing Competitive World: A Japanese Perspective.” International Journal of Operations & Production Management 16 (2): 8–23.10.1108/01443579610109811
  • Katolnik, Svetlana, and Hendrik Hakenes. 2014. “On the Incentive Effect of Job Rotation.”
  • Kim, Y., Y. S. Chen, and K. Linderman. 2015. “Supply Network Disruption and Resilience: A Network Structural Perspective.” Journal of Operations Management 33–34: 43–59.10.1016/j.jom.2014.10.006
  • Knecht, G. R. 1974. “Costing, Technological Growth and Generalized Learning Curves.” Operational Research Quarterly (1970–1977) 25 (3): 487–491. doi:10.2307/3007935.
  • Leiblein, M. J. 2011. “What Do Resource- and Capability-Based Theories Propose?” Journal of Management 37 (4): 909–932. doi:10.1177/0149206311408321.
  • Lengnick-Hall, C. A., T. E. Beck, and M. L. Lengnick-Hall. 2011. “Developing a Capacity for Organizational Resilience through Strategic Human Resource Management.” Human Resource Management Review 21 (3): 243–255. doi:10.1016/j.hrmr.2010.07.001.
  • Lotfi, M., M. Sodhi, and C. Kocabasoglu-Hillmer. 2013. “How Efforts to Achieve Resiliency Fit with Lean and Agile Practices..” In Proceedings of the 24th Production and Operations Management Society, Denver.
  • Luthans, F., B. J. Avolio, and C. M. Youssef-Morgan. 2015. Psychological Capital and beyond. New York, NY: Oxford University Press, Incorporated.
  • Martin, C., and C. Rutherford. 2004. “Creating Supply Chain Resilience through Agile Six Sigma.” Critical Eye 24–28.
  • Mazur, J. E., and R. Hastie. 1978. “Learning as Accumulation: A Reexamination of the Learning Curve.” Psychological Bulletin 85 (6): 1256–1274.10.1037/0033-2909.85.6.1256
  • McElroy, W. 1996. “Implementing Strategic Change through Projects.” International Journal of Project Management 14 (6): 325–329. doi:10.1016/0263-7863(95)00060-7.
  • Mitchell, M. 1998. An Introduction to Genetic Algorithms. Cambridge, MA: MIT Press.
  • Myers, R., and E. R. Hancock. 2001. “Empirical Modelling of Genetic Algorithms.” Evolutionary Computation 9 (4): 461–493.10.1162/10636560152642878
  • Najjar, W., and J. L. Gaudiot. 1990. “Network Resilience: A Measure of Network Fault Tolerance.” IEEE Transactions on Computers 39 (2): 174–181. doi:10.1109/12.45203.
  • Narasimhan, R., M. Swink, and S. W. Kim. 2006. “Disentangling Leanness and Agility: An Empirical Investigation.” Journal of Operations Management 24 (5): 440–457. doi:10.1016/j.jom.2005.11.011.
  • Nembhard, D. A., and M. V. Uzumeri. 2000. “An Individual-Based Description of Learning within an Organization.” IEEE Transactions on Engineering Management 47 (3): 370–378. doi:10.1109/17.865905.
  • Nembhard, D. A., and N. Osothsilp. 2002. “Task complexity effects on between-individual learning/forgetting variability.” International Journal of Industrial Ergonomics. 29 (5) : 297–306.
  • Omer, M., A. Mostashari, and U. Lindemann. 2014. “Resilience Analysis of Soft Infrastructure Systems.” Procedia Computer Science 28: 565–574. doi:10.1016/j.procs.2014.03.069.
  • Pal, R., H. Torstensson, and H. Mattila. 2014. “Antecedents of Organizational Resilience in Economic Crises – An Empirical Study of Swedish Textile and Clothing SMEs.” International Journal of Production Economics 147, Part,410–428. doi:10.1016/j.ijpe.2013.02.031.
  • Ponomarov, S. Y., and M. C. Holcomb. 2009. “Understanding the Concept of Supply Chain Resilience.” The International Journal of Logistics Management 20 (1): 124–143. doi:10.1108/09574090910954873.
  • Puchkova, A., R. Srinivasan, D. McFarlane, and A. Thorne. 2015. “Towards Lean and Resilient Production.” IFAC-PapersOnLine 48 (3): 2387–2392. doi:10.1016/j.ifacol.2015.06.445.
  • Rosenkrantz, D., and Sanjay, Goel, S. S., Ravi, and J. Gangolly. 2009. “Resilience Metrics for Service-Oriented Networks: A Service Allocation Approach.” IEEE Transactions on Services Computing 2 (3): 183–196. doi:10.1109/TSC.2009.18.
  • Scrucca, L. 2013. “A Package for Genetic Algorithms in R.” Journal of Statistical Software 53 (4):1–37. doi:10.18637/jss.v053.i04.
  • Shah, R., and P. T. Ward. 2003. “Lean Manufacturing: Context, Practice Bundles, and Performance.” Journal of Operations Management 21 (2): 129–149. doi:10.1016/S0272-6963(02)00108-0.
  • Shah, R., and P. T. Ward. 2007. “Defining and Developing Measures of Lean Production.” Journal of Operations Management 25 (4): 785–805.10.1016/j.jom.2007.01.019
  • Sheffi, Y. 2005a. “Building a Resilient Supply Chain.” Harvard Business Review 1 (8): 1–8.
  • Sheffi, Y. 2005b. The Resilient Enterprise: Overcoming Vulnerability for Competitive Advantage. Cambridge, MA: The MIT Press.
  • Terry, J. 2011. “Managing a Multicultural Workforce.” Human Resource Development.
  • Troitzsch, K. G. 2004. “Validating Simulation Models.” In Proceedings of the 18th European Simualtion Multi-Conference, Magdeburg, Germany, 98–106.
  • Uzumeri, M., and D. Nembhard. 1998. “A Population of Learners: A New Way to Measure Organizational Learning.” Journal of Operations Management 16 (5): 515–528. doi:10.1016/S0272-6963(97)00017-X.
  • Villalba-Diez, J., I. De Sanctis, J. Ordieres-Meré, and F. E. Ciarapica. 2018. “Lean Structural Network Resilience.” In Complex Networks & their Applications VI. COMPLEX NETWORKS 2017. Studies in Computational Intelligence, edited by C.Cherifi,H.Cherifi,M. Karsai, and M. Musolesi, Vol. 689, 606–619. Cham: Springer.
  • Villalba-Diez, J., and J. Ordieres-Meré. 2015. “Improving Manufacturing Performance by Standardization of Interprocess Communication.” IEEE Transactions on Engineering Management 62 (3): doi:10.1109/TEM.2015.2424156.
  • Vogus, T. J., and K. M. Sutcliffe. 2007. “Organizational Resilience: Towards a Theory and Research Agenda.” In 2007 IEEE International Conference on Systems, Man and Cybernetics, Montreal, Que., Canada, 3418–3422. doi: 10.1109/ICSMC.2007.4414160.
  • Wang, S., and R. A. Noe. 2010. “Knowledge Sharing: A Review and Directions for Future Research.” Human Resource Management Review 20 (2): 115–131. doi:10.1016/j.hrmr.2009.10.001.
  • Wright, T. P. 1936. “Factors Affecting the Cost of Airplanes.” Journal of the Aeronautical Sciences 3 (4): 122–128. doi:10.2514/8.155.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.