3,678
Views
47
CrossRef citations to date
0
Altmetric
Articles

Demand Driven MRP: assessment of a new approach to materials management

, , , &
Pages 166-181 | Received 24 Aug 2017, Accepted 05 Apr 2018, Published online: 24 Apr 2018

References

  • Beamon, B. M. , and J. M. Bermudo . 2000. “A Hybrid Push/Pull Control Algorithm for Multi-stage, Multi-line Production Systems.” Production Planning & Control 11: 349–356.10.1080/095372800232072
  • Benton, W. C. , and D. C. Whybark . 1982. “Material Requirements Planning (MRP) and Purchase Discounts.” Journal of Operations Management. 2 (2): 137–143.10.1016/0272-6963(82)90029-8
  • Carvalho, H. , A. P. Barroso , V. H. Machado , S. Azevedo , and V. Cruz-Machado . 2012. “Supply Chain Redesign for Resilience Using Simulation.” Computers and Industrial Engineering 62 (1): 329–341.10.1016/j.cie.2011.10.003
  • Cochran, J. K. , and H. A. Kaylani . 2008. “Optimal Design of a Hybrid Push/Pull Serial Manufacturing System with Multiple Part Types.” International Journal of Production Research 46: 949–965.10.1080/00207540600905547
  • Costanza, J. R. , 1996. The Quantum Leap in Speed-to-market. Denver, CO: Jc-IT Institute of Technology
  • Demand Driven Institute . 2017. Case Studies . http://www.demanddriveninstitute.com/case-studies.
  • Flapper, S. D. P. , G. J. Miltenburg , and J. Wijngaard . 1991. “Embedding JIT into MRP.” International Journal of Production Research 29: 329–341.10.1080/00207549108930074
  • Geraghty, J. , and C. Heavey . 2006. “A Review and Comparison of Hybrid and Pull-type Production Control Strategies.” Stochastic Modeling of Manufacturing Systems 307–329.10.1007/3-540-29057-5
  • Goldratt, E. M. , and J. Cox . 1992. The Goal: A Process of Ongoing Improvement . Great Barrington, MA: North River Press.
  • González-R, P. L. , J. M. Framinan , and H. Pierreval . 2011. “Token-based Pull Production Control Systems: An Introductory Overview.” Journal of Intelligent Manufacturing 23: 5–22.
  • Greif, M. , C. Moisy , and E. Pesnel . 1984. Guide Du Kanban . CIPE.
  • Ho, C. , and T. C. Ireland . 2012. “Mitigating Forecast Errors by Lot-sizing Rules in ERP-Controlled Manufacturing Systems.” International Journal of Production Research 50: 3080–3094.10.1080/00207543.2011.592156
  • Hochreiter, T. A. 1999. “A Comparative Simulation Study of Kanban, CONWIP, and MRP Manufacturing Control Systems in a Flow Shop.” M.Sc. Dissertation, University of Florida.
  • Hodgson, T. J. , and D. Wang . 1991a. “Optimal Hybrid Push/Pull Control Strategies for a Parallel Multistage System: Part I.” International Journal of Production Research 29: 1279–1287.10.1080/00207549108930133
  • Hodgson, T. J. , and D. Wang . 1991b. “Optimal Hybrid Push/Pull Control Strategies for a Parallel Multistage System: Part II.” International Journal of Production Research 29: 1453–1460.10.1080/00207549108948022
  • Hollocks, B. W. 2006. “Forty Years of Discrete-event Simulation – A Personal Reflection.” Journal of the Operational Research Society 57: 1383–1399.10.1057/palgrave.jors.2602128
  • Hopp, W. 2008. ML: Factory Physics. 3rd ed. New York : McGraw-Hill.
  • Hopp, W. , and M. Spearman . 1996. Factory Physics: Foundations of Factory Management . Chicago, IL : InvinIMcGraw Hill.
  • Jodlbauer, Herbert , and Sonja Reitner . 2012. “Material and Capacity Requirements Planning with Dynamic Lead times.” International Journal of Production Research 50 (16): 4477–4492.10.1080/00207543.2011.603707
  • Karmarkar, U. 1986. Push, Pull and Hybrid Control Schemes . Rochester, NY: Graduate School of Management, University of Rochester.
  • Khojasteh, Y. , and R. Sato . 2015. “Selection of a Pull Production Control System in Multi-stage Production Processes.” International Journal of Production Research 53: 4363–4379.10.1080/00207543.2014.1001530
  • Koulouriotis, D. E. , A. S. Xanthopoulos , and V. D. Tourassis . 2010. “Simulation Optimisation of Pull Control Policies for Serial Manufacturing Lines and Assembly Manufacturing Systems Using Genetic Algorithms.” International Journal of Production Research 48 (10): 2887–2912.10.1080/00207540802603759
  • Krajewski, L. J. , B. E. King , L. P. Ritzman , and D. S. Wong . 1987. “Kanban, MRP, and Shaping the Manufacturing Environment.” Management Science 33 (1): 39–57.10.1287/mnsc.33.1.39
  • Lage Junior, M. , and M. Godinho Filho . 2010. “Variations of the Kanban System: Literature Review and Classification.” International Journal of Production Economics 125 (1): 13–21.10.1016/j.ijpe.2010.01.009
  • Land, M. J. 2009. “Cobacabana (Control of Balance by Card-based Navigation): A Card-based System for Job Shop Control.” International Journal of Production Economics 117 (1): 97–103.10.1016/j.ijpe.2008.08.057
  • Law, A. 2014. Simulation Modeling and Analysis . 5th ed. Dubuque: McGraw-Hill Education.
  • Law, A. M. , and W. D. Kelton . 1991. Simulation Modeling and Analysis . New York : McGraw-Hill.
  • Law, A. M. , and M. G. McComas . 1991. Secrets of Successful Simulation Studies. In Proceedings of the 23rd Conference on Winter Simulation, IEEE Computer Society , 21–27. Washington, DC.
  • Lee, Y. H. , M. K. Cho , S. J. Kim , and Y. B. Kim . 2002. “Supply Chain Simulation with Discrete–Continuous Combined Modeling.” Computers and Industrial Engineering 43 (1–2): 375–392.10.1016/S0360-8352(02)00080-3
  • Li, Z. 2013. Design and Analysis of Robust Kanban System in an Uncertain Environment . Karlsruhe: KIT Scientific Publishing.
  • Li, X. , R. Sawhney , E. J. Arendt , and K. Ramasamy . 2012. “A Comparative Analysis of Management Accounting Systems’ Impact on Lean Implementation.” International Journal of Technology Management 57: 33–48.10.1504/IJTM.2012.043950
  • Manuj, I. , and J. T. Mentzer . 2008. “Global Supply Chain Risk Management.” Journal of Business Logistics 29 (1): 133–155.10.1002/jbl.2008.29.issue-1
  • Manuj, I. , J. T. Mentzer , and M. R. Bowers . 2009. “Improving the Rigor of Discrete‐event Simulation in Logistics and Supply Chain Research.” International Journal of Physical Distribution and Logistics Management 39 (3): 172–201.10.1108/09600030910951692
  • Melnyk, S. A. , and C. J. Piper . 1981. “Implementation of Material Requirements Planning: Safety Lead times.” International Journal of Operations and Production Management. 2 (1): 52–61.10.1108/eb054675
  • Melnyk, S. A. , and C. J. Piper . 1985. “Leadtime Errors in MRP: The Lot Sizing Effect.” International Journal of Production Research 23 (2): 253–264.10.1080/00207548508904706
  • Melnyk, S. A. , A. Rodrigues , and G. L. Ragatz . 2009. “Using Simulation to Investigate Supply Chain Disruptions.” In Supply Chain Risk, International Series in Operations Research & Management Science , 103–122. New York: Springer.10.1007/978-0-387-79934-6
  • Micilo, R. , F. Fontanili , G. Marques , P. Bomert , and M. Lauras . 2015. “RTLS-based Process Mining: Towards an Automatic Process Diagnosis in Healthcare.” IEEE International Conference on Automation Science and Engineering (CASE) , 1397–1402. Gothenburg: IEEE.10.1109/CoASE.2015.7294294
  • Miclo, Romain . 2016. “Challenging the ‘Demand Driven MRP’ Promises’: A Discrete Event Simulation Approach”. PhD thesis, Ecole Des Mines D’Albi-Carmaux . https://tel.archives-ouvertes.fr/tel-01673811/document.
  • Miclo, R. , F. Fontanili , M. Lauras , J. Lamothe , and B. Milian . 2016. “An Empirical Comparison of MRPII and Demand-driven MRP.” IFAC-Pap., 8th IFAC Conference on Manufacturing Modelling, Management and Control MIM , 49: 1725–1730. Troyes.
  • Milne, R. J. , C.-T. Wang , C.-K. A. Yen , and K. Fordyce . 2012. “Optimized Material Requirements Planning for Semiconductor Manufacturing.” Journal of the Operational Research Society 63: 1566–1577.10.1057/jors.2012.1
  • Narasimhan, R. , and S. A. Melnyk . 1984. “Assessing the Transient Impact of Lot Sizing Rules following MRP Implementation.” International Journal of Production Research 22 (5): 759–772.10.1080/00207548408942497
  • Ohno, T. 1988. Toyota Production System: Beyond Large-scale Production . Boca Raton, FL: CRC Press.
  • Olaitan, O. A. 2016. A Framework for Creating Production and Inventory Control Strategies (Doctoral) . Dublin: Advanced Processing Technology Research Centre (APTRC), Dublin City University.
  • Olhager, J. 2013. “Evolution of Operations Planning and Control: From Production to Supply Chains.” International Journal of Production Research 51: 6836–6843.10.1080/00207543.2012.761363
  • Olhager, J. , and B. Östlund . 1990. “An Integrated Push–Pull Manufacturing Strategy.” European Journal of Operational Research 45: 135–142.10.1016/0377-2217(90)90180-J
  • Orlicky, J. A. 1974. Material Requirements Planning: The New Way of Life in Production and Inventory Management . New York: McGraw-Hill.
  • Powell, D. J. , I. Bas , and E. Alfnes . 2013. “Integrating Lean and MRP: A Taxonomy of the Literature.” IFIP International Conference on Advances in Production Management Systems. Sustainable Production and Service Supply Chains , 485–492. State College, PA.10.1007/978-3-642-41263-9
  • Ptak, C. , and C. Smith . 2011. Orlicky’s Material Requirements Planning 3/E . New York: McGraw Hill Professional.
  • Ptak, C. , and C. Smith . 2016. Demand Driven Material Requirements Planning (DDMRP) . Norwalk, CT: Industrial Press.
  • Riezebos, J. 2010. “Design of POLCA Material Control Systems.” International Journal of Production Research 48: 1455–1477.10.1080/00207540802570677
  • Robinson, S. 2014. Simulation: The Practice of Model Development and Use . 2nd ed. New York: Palgrave MacMillan.
  • Rossi, Tommaso , Rossella Pozzi , Margherita Pero , and Roberto Cigolini . 2017. “Improving Production Planning through Finite-capacity MRP.” International Journal of Production Research 55 (2): 377–391.10.1080/00207543.2016.1177235
  • Sali, M. , and V. Giard . 2015. “Monitoring the Production of a Supply Chain with a Revisited MRP Approach.” Production Planning & Control 26 (10): 769–785.10.1080/09537287.2014.983579
  • Sarker, B. R. , and J. A. Fitzsimmons . 1989. “The Performance of Push and Pull Systems: A Simulation and Comparative Study.” International Journal of Production Research 27 (10): 1715–1731.10.1080/00207548908942650
  • Schmitt, T. G. , W. L. Berry , and T. E. Vollmann . 1984. “An Analysis of Capacity Planning Procedures for a Material Requirements Planning System.” Decision Sciences 15 (4): 522.10.1111/deci.1984.15.issue-4
  • Schriber, T. J. , D. T. Brunner , and J. S. Smith . 2012. “How Discrete-event Simulation Software Works and Why It Matters.” Winter Simulation Conference (WSC) Proceedings 1–15. Berlin.
  • Sekine, K. 2005. One-piece Flow: Cell Design for Transforming the Production Process . New York: Productivity Press.
  • Sepehri, M. M. , and N. Nahavandi . 2007. “Critical WIP Loops: A Mechanism for Material Flow Control in Flow Lines.” International Journal of Production Research 45 (12): 2759–2773.10.1080/00207540600787077
  • Spearman, M. L. , D. L. Woodruff , and W. J. Hopp . 1990. “CONWIP: A Pull Alternative to Kanban.” International Journal of Production Research 28 (5): 879–894.10.1080/00207549008942761
  • StataCorp . 2015. Stata Statistical Software: Release 14 . College Station, TX: StataCorp LP.
  • Sugimori, Y. , K. Kusunoki , F. Cho , and S. Uchikawa . 1977. “Toyota Production System and Kanban System Materialization of Just-in-time and Respect-for-Human System.” International Journal of Production Research 15 (6): 553–564.10.1080/00207547708943149
  • Thompson, K. 1983. “MRP II in the Repetitive Manufacturing Environment.” Production and Inventory Management 24 (4): 1–14.
  • Thürer, M. , M. Stevenson , and C. W. Protzman . 2016. “Card-based Production Control: A Review of the Control Mechanisms Underpinning Kanban, ConWIP, POLCA and COBACABANA Systems.” Production Planning and Control 27 (14): 1143–1157.
  • Venkateswaran, J. , and Y. J. Son . 2004. “Impact of Modelling Approximations in Supply Chain Analysis – An Experimental Study.” International Journal of Production Research 42 (15): 2971–2992.10.1080/00207540410001688392
  • Villa, A. , and T. Watanabe . 1993. “Production Management: Beyond the Dichotomy between ‘Push’ and ‘Pull’.” Computer Integrated Manufacturing Systems 6 (1): 53–63.10.1016/0951-5240(93)90028-O
  • Wang, D. , and C.-G. Xu . 1997. “Hybrid Push Pull Production Control Strategy Simulation and its Applications.” Production Planning & Control 8 (2): 142–151.10.1080/095372897235406
  • Whybark, D. C. , and J. Gregg Williams . 1976. “Material Requirements Planning under Uncertainty.” Decision Sciences 7 (4): 595–606.10.1111/deci.1976.7.issue-4
  • Wight, O. 1995. Manufacturing Resource Planning: MRP II: Unlocking America’s Productivity Potential . New York: John Wiley.
  • Wilson, J. M. 2016. “The Origin of Material Requirements Planning in Frederick W. Taylor’s Planning Office.” International Journal of Production Research 54 (5): 1535–1553.10.1080/00207543.2015.1092616
  • Xanthopoulos, A. S. , D. E. Koulouriotis , and A. Gasteratos . 2017. “Adaptive Card-based Production Control Policies.” Computers & Industrial Engineering 103: 131–144.10.1016/j.cie.2016.11.019
  • van der Zee, D. J. , and J. G. A. J. van der Vorst . 2005. “A Modeling Framework for Supply Chain Simulation: Opportunities for Improved Decision Making.” Decision Sciences 36 (1): 65–95.10.1111/deci.2005.36.issue-1

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.