1,154
Views
33
CrossRef citations to date
0
Altmetric
Articles

The model of maintenance planning and production scheduling for maximising robustness

References

  • Abramowitz, M., and I. A. Stegun. 1965. Handbook of Mathematical Functions. Washington: Dover.
  • Bajestani, M. A., D. Banjevic, and J. C. H. Beck. 2014. “Integrated Maintenance Planning and Production Scheduling with Markovian Deteriorating Machine Conditions.” International Journal of Production Research 52 (24): 7377–7400. doi: 10.1080/00207543.2014.931609
  • Baptista, M., S. Sankararaman, IPJrCN Medeiros, H. Prendinger, and E. M. P. Henriques. 2018. “Forecasting Fault Events for Predictive Maintenance Using Data-driven Techniques and ARMA Modeling.” Computers & Industrial Engineering 115: 41–53. doi: 10.1016/j.cie.2017.10.033
  • Buhring, W. 2000. “An Asymptotic Expansion for a Ratio of Products of Gamma Functions.” Internat. J. Math. Math. Sci. 24: 504–510. doi: 10.1155/S0161171200010310
  • Chan, F. T. S., S. H. Chung, L. Y. Chan, G. Finke, and M. K. Tiwari. 2006. “Solving Distributed FMS Scheduling Problems Subject to Maintenance: Genetic Algorithms Approach.” Robotics and Computer Integrated Manufacturing 22: 5–6.
  • Crowe, D., and A. Feinberg. 2001. Design for Reliability. California: CRC Press.
  • Cui, W. W., Z. Lu, and E. Pan. 2014. “Integrated Production Scheduling and Maintenance Policy for Robustness in a Single Machine.” Computers & Operations Research 47: 81–91. doi: 10.1016/j.cor.2014.02.006
  • Cui, W.-W., Z. Lu, B. Zhou, C. Li, and X. Han. 2016. “A hybrid genetic algorithm for non-permutation flow shop scheduling problems with unavailability constraints.” International Journal of Computer Integrated Manufacturing 29 (9): 944–961. doi:10.1080/0951192X.2015.1130247.
  • Goldratt, E. M., and J. Cox. 1992. The Goal, a Process of on Going Improvement. Great Barrington: North River Press.
  • Jamshidi, R., and M. M. S. Esfahani. 2015. “Reliability-based Maintenance and Job Scheduling for Identical Parallel Machines.” International Journal of Production Research 53 (4): 1216–1227. doi: 10.1080/00207543.2014.951739
  • Kempa, W. M., and I. Paprocka. 2012. “Estimation of Reliability Characteristics in a Production Scheduling Model with the Renewal Theory Application – First Part. Information Systems Architecture and Technology.” The Use of IT Models for Organization Management, 49–58. Wrocław.
  • Kempa, W. M., I. Paprocka, K. Kalinowski, and C. Grabowik. 2014. “Estimation of Reliability Characteristics in a Production Scheduling Model with Failures and Time-changing Parameters Described by Gamma and Exponential Distributions.” Advanced Materials Research 837: 116–121. doi: 10.4028/www.scientific.net/AMR.837.116
  • Kempa, W. M., I. Wosik, and B. Skołud. 2011. “Estimation of Reliability Characteristics in a Production Scheduling Model with Time-changing Parameters – First Part, Theory.” Management and control of manufacturing processes, 7–18. Lublin.
  • Khoukhi, F. E., J. Boukachour, and A. E. H. Alaoui. 2017. “The ‘Dual-Ants Colony’: A Novel Hybrid Approach for the Flexible Job Shop Scheduling Problem with Preventive Maintenance.” Computers & Industrial Engineering 106: 236–255. doi: 10.1016/j.cie.2016.10.019
  • Koochaki, J., J. A. C. Bokhorst, H. Wortmann, and W. Klingenberg. 2013. “The Influence of Condition Based Maintenance on Worforce Planning and Maintenance Scheduling.” International Journal of Production Research 5 (8): 2339–2351. doi: 10.1080/00207543.2012.737944
  • Lei, D. 2013. “Multi-objective Artificial Bee Colony for Interval Job Shop Scheduling with Flexible Maintenance.” International Journal of Advanced Manufacturing Technology 66: 1835–1843. doi: 10.1007/s00170-012-4463-y
  • Li, J., M. S. Meerkov, and L. Zhang. 2013. “Production Systems Engineering: Main Results and Recommendations for Management.” International Journal of Production Research 51 (23–24): 7209–7234. doi: 10.1080/00207543.2012.757667
  • Liu, Q., M. Dong, and F. F. Chen. 2018. “Single-machine-based Joint Optimization of Predictive Maintenance Planning and Production Scheduling.” Robotics and Computer-Integrated Manufacturing 51: 238–247. doi: 10.1016/j.rcim.2018.01.002
  • Mokhtari, H., and M. Dadgar. 2015. “Scheduling Optimization of a Stochastic Flexible Job-shop System with Time-varying Machine Failure Rate.” Computer & Operation Research 61: 31–45. doi: 10.1016/j.cor.2015.02.014
  • Pan, E., W. Liao, and L. Xi. 2012. “A Joint Model of Production Scheduling and Predictive Maintenance for Minimizing Job Tardiness.” International Journal of Advanced Manufacturing Technology 60: 1049–1061. doi: 10.1007/s00170-011-3652-4
  • Paprocka, I. 2016. On the Quality of Basic Schedules Influencing over the Performance of Predictive and Reactive Schedules. Information Systems Architecture and Technology: Proceedings of 37th International Conference on Information Systems Architecture and Technology – ISAT 2016 – Part IV Volume 524 of the series Advances in Intelligent Systems and Computing: 243–253.
  • Paprocka, I., and W. Kempa. 2013a. “Modeling and Simulation of a Production System in Order to Reach a Robust Schedule. Part I.” Przegląd Mechaniczny 2: 28–31.
  • Paprocka, I., and W. Kempa. 2013b. “Modeling and Simulation of a Production System in Order to Reach a Robust Schedule: Numerical Example. Part II.” Przegląd Mechaniczny 3: 22–26.
  • Paprocka, I., M. W. Kempa, K. Kalinowski, and C. Grabowik. 2015. “Estimation of Overall Equipment Effectiveness Using Simulation Programme.” Materials Science and Engineering 95: 1757–8981.
  • Paprocka, I., and B. Skołud. 2017. “A Hybrid – Multi Objective Immune Algorithm for Predictive and Reactive Scheduling.” Journal of Scheduling 20 (2): 165–182. doi: 10.1007/s10951-016-0494-9
  • Rajkumar, M., P. Asokan, and V. Vamsikrishna. 2010. “A GRASP Algorithm for Flexible Job-Shop Scheduling with Maintenance Constraints.” International Journal of Production Research 48 (22): 6821–6836. doi: 10.1080/00207540903308969
  • Shamshirband, S., M. Shojafar, R. A. A. Hosseinabadi, M. Kardgar, MHNMd Nasir, and R. Ahmad. 2015. “OSGA: Genetic-based Open-shop Scheduling with Consideration of Machine Maintenance in Small and Medium Enterprise.” Annals of Operations Research 229: 743–758. doi: 10.1007/s10479-015-1855-z
  • Skołud, B., I. Wosik, W. M. Kempa, and K. Kalinowski. 2011. “Estimation of Reliability Characteristics in a Production Scheduling Model with Time-changing Parameters – Second Part, Numerical Example.” Management and control of manufacturing processes, 19–30. Lublin.
  • Wang, H. 2002. “A Survey of Maintenance Policies of Deteriorating Systems.” European Journal of Operational Research 139 (3): 469–489. doi: 10.1016/S0377-2217(01)00197-7
  • Wang, S., and J. Yu. 2010. “An Effective Heuristic for Flexible Job-shop Scheduling Problem with Maintenance Activities.” Computers & Industrial Engineering 59: 436–447. doi: 10.1016/j.cie.2010.05.016
  • Wong, C. S., F. T. S. Chan, and S. H. Chung. 2014. “Decision-making on Multi-mould Maintenance in Production Scheduling.” International Journal of Production Research 52 (19): 5640–5655. doi: 10.1080/00207543.2014.900200
  • Wu, S. D., R. H. Storer, and P. C. Chang. 1993. “One-machine Rescheduling Heuristics with Efficiency and Stability as Criteria.” ComputOper Res 20: 1–14. doi: 10.1016/0305-0548(93)90091-V
  • Xia, T., X. Jin, L. Xi, and J. Ni. 2015. “Production-driven Opportunistic Maintenance for Batch Production Based on MAM-APB Scheduling.” European Journal of Operational Research 240: 781–790. doi: 10.1016/j.ejor.2014.08.004
  • Xia, T., L. Xi, E. Pan, and J. Ni. 2017. “Reconfiguration-oriented Opportunistic Maintenance Policy for Reconfigurable Manufacturing Systems.” Reliability Engineering & System Safety 166: 87–98. doi: 10.1016/j.ress.2016.09.001
  • Yang, Q., J. Liu, Y. Huang, Y. Wang, and T. Wang. 2016. “The Dynamic 4S Auto Maintenance Shop Scheduling in a Multi-constraint Machine Environment Based on the Theory of Constraints.” The International Journal of Advanced Manufacturing Technology 83 (9–12): 1773–1785. doi:10.1007/s00170-015-7664-3.
  • Zhang, L., L. Gao, and X. Li. 2013. “A Hybrid Genetic Algorithm and Tabu Search for Multi-objective Dynamic Job Shop Scheduling Problem.” International Journal of Production Research 51 (12): 3516–3531. doi: 10.1080/00207543.2012.751509
  • Zheng, Y., L. Lian, and K. Mesghouni. 2014. “Comparative Study of Heuristics Algorithms in Solving Flexible job Shop Scheduling Problem with Condition Based Maintenance.” Journal of Industrial Engineering and Management 7 (2): 518–531.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.