Theory of constraints: review and bibliometric analysis

ORCID Icon, ORCID Icon, & ORCID Icon
Pages 5068-5102 | Received 09 Nov 2017, Accepted 24 Aug 2018, Published online: 08 Sep 2018

References

  • Abdelsalam, H. M., M. Magdy, and A. M. AlShaar. 2013. “Optimal Location of New Distribution Center in Supply Chain Network Design with Varying Inventory Capacity.” In Handbook of Optimization, Intelligent Systems Reference Library, vol 38, edited by I. Zelinka, V. Snášel, and A. Abraham. Springer, Berlin, Heidelberg. doi: 10.1007/978-3-642-30504-7_22
  • Adams, J., E. Balas, and D. Zawack. 1988. “Shifting Bottleneck Procedure for Job Shop Scheduling.” Management Science 34 (3): 391–401. doi: 10.1287/mnsc.34.3.391
  • Aryanezhad, M. B., and A. R. Komijan. 2004. “An Improved Algorithm for Optimizing Product Mix Under the Theory of Constraints.” International Journal of Production Research 42 (20): 4221–4233. doi: 10.1080/00207540410001695961.
  • Atwater, J. B., and S. S. Chakravorty. 2002. “A Study of the Utilization of Capacity Constrained Resources in Drum-Buffer-Rope Systems.” Production and Operations Management 11 (2): 259–273. doi: 10.1111/j.1937-5956.2002.tb00495.x
  • Banerjee, A., and S. K. Mukhopadhyay. 2016. “A Contemporary TOC Innovative Thinking Process in the Backdrop of Leagile Supply Chain.” Journal of Enterprise Information Management 29 (3): 400–431. doi: 10.1108/JEIM-08-2014-0086
  • Barnard, A. 2010. “Continuous Improvement and Auditing.” In Theory of Constraints Handbook, edited by J. F. Cox III, and J. G. Schleier, 403–454. New York, NY: McGraw-Hill.
  • Barnard, A., and R. E. Immelman. 2010. “Holistic TOC Implementation Case Studies – Lessons Learned from the Public and Private Sector.” In Theory of Constraints Handbook, edited by J. F. Cox III, and J. G. Schleier, 455–498. New York, NY: McGraw-Hill.
  • Bashiri, M., and M. M. Tabrizi. 2010. “Supply Chain Design: A Holistic Approach.” Expert Systems with Applications 37 (1): 688–693. doi:10.1016/j.eswa.2009.06.006.
  • Benavides, M. B., and H. Van Landeghem. 2015. “Implementation of S-DBR in Four Manufacturing SMEs: A Research Case Study.” Production Planning & Control 26 (13): 1110–1127. doi: 10.1080/09537287.2015.1015060
  • Betterton, C. E., and J. F. Cox III. 2009. “Espoused Drum-Buffer-Rope Flow Control in Serial Lines: A Comparative Study of Simulation Models.” International Journal of Production Economics 117 (1): 66–79. doi: 10.1016/j.ijpe.2008.08.050
  • Bevilacqua, M., F. E. Ciarapica, and G. Giacchetta. 2009. “Critical Chain and Risk Analysis Applied to High-Risk Industry Maintenance: A Case Study.” International Journal of Project Management 27 (4): 419–432. doi: 10.1016/j.ijproman.2008.06.006
  • Bevilacqua, M., F. E. Ciarapica, and G. Mazzuto. 2014. “Critical Chain and Theory of Constraints Applied to Yachting Shipbuilding: A Case Study.” International Journal of Project Organisation and Management 6 (4): 379–397. doi: 10.1504/IJPOM.2014.066411
  • Bhattacharya, A., and P. Vasant. 2007. “Soft-Sensing of Level of Satisfaction in TOC Product-Mix Decision Heuristic Using Robust Fuzzy-LP.” European Journal of Operational Research 177 (1): 55–70. doi:10.1016/j.ejor.2005.11.017.
  • Biel, K., and C. H. Glock. 2017. “Governing the Dynamics of Multi-Stage Production Systems Subject to Learning and Forgetting Effects: A Simulation Study.” International Journal of Production Research, 1–23. doi:10.1080/00207543.2017.1338780.
  • Blackstone Jr., J. H. 2001. “Theory of Constraints – A Status Report.” International Journal of Production Research 39 (6): 1053–1080. doi:10.1080/00207540010028119.
  • Breen, A. M., T. Burton-Houle, and D. C. Aron. 2002. “Applying the Theory of Constraints in Health Care: Part 1—The Philosophy.” Quality Management in Healthcare 10 (3): 40–46. doi: 10.1097/00019514-200210030-00010
  • Buchmann-Slorup, R. 2014. “Applying Critical Chain Buffer Management Theory in Location-Based Management.” Construction Management and Economics 32 (6): 506–519. doi: 10.1080/01446193.2013.797094
  • Büdd, C. S., and J. Cerveny. 2010. “A Critical Chain Project Management Primer.” In Theory of Constraints Handbook, edited by J. F. Cox III, and J. G. Schleier, 45–76. New York, NY: McGraw-Hill.
  • Cao, Z. C., Y. Z. Peng, and Q. D. Wu. 2010. “Re-Entrant Manufacturing System Scheduling Based on Drum-Buffer-Rope.” Computer Integrated Manufacturing Systems 16 (12): 2668–2673.
  • Cattaneo, C., and G. Bassani. 2016. “The TOC Thinking Process: The Viability of Change.” Human Systems Management 35 (4): 301–323. doi: 10.3233/HSM-161616
  • Cerveny, J. F., and S. D. Galup. 2002. “Critical Chain Project Management Holistic Solution Aligning Quantitative and Qualitative Project Management Methods.” Production and Inventory Management Journal 43 (3/4): 55–64.
  • Chaharsoughi, S., and N. Jafari. 2007. “A Simulated Annealing Approach for Product Mix Decisions.” Scientia Iranica 14 (3): 230–235.
  • Chakravorty, S. S., and J. B. Atwater. 2005. “The Impact of Free Goods on the Performance of Drum-Buffer-Rope Scheduling Systems.” International Journal of Production Economics 95 (3): 347–357. doi: 10.1016/j.ijpe.2004.01.001
  • Chakravorty, S. S., and D. N. Hales. 2015. “Improving Labour Relations Performance Using a Simplified Drum Buffer Rope (S-DBR) Technique.” Production Planning & Control 27 (2): 02–113.
  • Chang, K. H., Y. C. Chang, and Y. S. Chang. 2017. “Applying Theory of Constraints-Based Approach to Solve Memory Allocation of Cloud Storage.” International Journal of Systems Science: Operations & Logistics 4 (4): 311–329.
  • Chang, Y. C., K. H. Chang, and C. W. Huang. 2014. “Integrate Market Demand Forecast and Demand-Pull Replenishment to Improve the Inventory Management Effectiveness of Wafer Fabrication.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 228 (4): 617–636. doi: 10.1177/0954405413505556
  • Chang, Y. C., K. H. Chang, and Y. C. Lei. 2014. “Probe of the Replenishment Strategy and Grouping Rule in the Semiconductor Industry.” Journal of Testing and Evaluation 42 (2): 484–497. doi: 10.1520/JTE20120146
  • Chang, Y. C., K. H. Chang, and W. C. Sun. 2015. “Enhancement of Inventory Management for the Wafer Manufacturing Industry by Combining Market Demand Forecast and Demand-Pull Replenishment.” Journal of Testing and Evaluation 43 (4): 948–963. doi: 10.1520/JTE20130216
  • Chang, Y. C., and W. T. Huang. 2011a. “A Modification of Simplified Drum-Buffer-Rope for Re-Entrant Flow Shop Scheduling.” Information Technology Journal 10 (1): 40–50. doi: 10.3923/itj.2011.40.50
  • Chang, Y. C., and W. T. Huang. 2011b. “Using Simplified Drum-Buffer-Rope for Re-Entrant Flow Shop Scheduling in a Random Environment.” African Journal of Business Management 5 (26).
  • Chang, Y. C., and W. T. Huang. 2014. “An Enhanced Model for SDBR in a Random Reentrant Flow Shop Environment.” International Journal of Production Research 52 (6): 1808–1826. doi: 10.1080/00207543.2013.848491
  • Chaudhari, C. V., and S. K. Mukhopadhyay. 2003. “Application of Theory of Constraints in an Integrated Poultry Industry.” International Journal of Production Research 41 (4): 799–817. doi:10.1080/0020754031000065548.
  • Cheng, C. 2010. “Theory of Constraints in Prisons.” In Theory of Constraints Handbook, edited by J. F. Cox III, and J. G. Schleier, 813–841. New York, NY: McGraw-Hill.
  • Chou, Y. C., C. H. Lu, and Y. Y. Tang. 2012. “Identifying Inventory Problems in the Aerospace Industry Using the Theory of Constraints.” International Journal of Production Research 50 (16): 4686–4698. doi:10.1080/00207543.2011.631598.
  • Chu, C. C. 2008. “Buffer Sizing and Critical Chain Project Management.” Computer Integrated Manufacturing Systems, CIMS 14 (5): 1029–1035.
  • Clegg, B. 2018. “Perceptions of Growth-Impeding Constraints Acting upon SMEs’ Operations and the Identification and use of Transitionary Paths to Elevate Them.” International Journal of Operations and Production Management 38 (3): 756–783. doi:10.1108/IJOPM-12-2015-0736.
  • Cohen, O. 2010. “Daily Management with TOC.” In Theory of Constraints Handbook, edited by J. F. Cox III, and J. G. Schleier, 671–727. New York, NY: McGraw-Hill.
  • Coman, A. 2008. “ARENA Mapping: An Effective Strategy Focusing Tool.” Human Systems Management 27 (4): 305–312.
  • Coman, A., and B. Ronen. 2000. “Production Outsourcing: A Linear Programming Model for the Theory-of-Constraints.” International Journal of Production Research 38 (7): 1631–1639. doi: 10.1080/002075400188762
  • Coman, A., and B. Ronen. 2007. “Managing Strategic and Tactical Constraints in the Hi-Tech Industry.” International Journal of Production Research 45 (4): 779–788. doi: 10.1080/00207540600597237
  • Coman, A., and B. Ronen. 2009. “Focused SWOT: Diagnosing Critical Strengths and Weaknesses.” International Journal of Production Research 47 (20): 5677–5689. doi: 10.1080/00207540802146130
  • Cooper, M. J., and T. W. Loe. 2000. “Using the Theory of Constraints’ Thinking Processes to Improve Problem-Solving Skills in Marketing.” Journal of Marketing Education 22 (2): 137–146. doi: 10.1177/0273475300222008
  • Corbett, T. 1999. Throughput Accounting. The North River Press.
  • Corbett, T. 2000. “Throughput Accounting and Activity-Based Costing: The Driving Factors Behind Each Methodology.” Journal of Cost Management 14 (1): 37–45.
  • Costa, J. M., H. Rozenfeld, C. S. T. Amaral, R. M. Marcacinit, and S. O. Rezende. 2013. “Systematization of Recurrent New Product Development Management Problems.” Engineering Management Journal 25 (1): 19–34. doi: 10.1080/10429247.2013.11431963
  • Cox III, J. F., and L. H. Boyd. 2018. “Using the Theory of Constraints’ Processes of Ongoing Improvement to Address the Provider Appointment Scheduling System Design Problem.” Health Systems. doi:10.1080/20476965.2018.1471439.
  • Cox III, J. F., L. H. Boyd, T. T. Sullivan, R. A. Reid, and B. Cartier. 2012. The Theory of Constraints International Certification Organization Dictionary. 2nd ed.
  • Cox III, J. F., and J. G. Schleier, eds. 2010. Theory of Constraints Handbook. New York, NY: McGraw-Hill.
  • Dalci, I., and L. Kosan. 2012. “Theory of Constraints Thinking-Process Tools Facilitate Goal Achievement for Hotel Management: A Case Study of Improving Customer Satisfaction.” Journal of Hospitality Marketing & Management 21 (5): 541–568. doi: 10.1080/19368623.2012.626751
  • Darlington, J., M. Francis, P. Found, and A. Thomas. 2015. “Design and Implementation of a Drum-Buffer-Rope Pull-System.” Production Planning & Control 26 (6): 489–504. doi: 10.1080/09537287.2014.926409
  • de Souza, F. B., and H. R. Baptista. 2010. “Proposta de Avanço Para o Método Tambor-Pulmão-Corda Simplificado Aplicado em Ambientes de Produção sob Encomenda.” Gestão & Produção 17 (4): 735–746. doi: 10.1590/S0104-530X2010000400008
  • de Souza, F. B., and S. R. I. Pires. 2010. “Theory of Constraints Contributions to Outbound Logistics.” Management Research Review 33 (7): 683–700. doi:10.1108/01409171011055780.
  • de Souza, F. B., and S. R. I. Pires. 2014. “Making to Availability: An Application of the Theory of Constraints in Make-to-Stock Environments.” Gestao e Producao 21 (1): 65–76. doi:10.1590/S0104-530X2013005000007.
  • de Souza, F. B., V. A. Sobreiro, M. S. Nagano, and J. W. de Souza Manfrinato. 2013. “When Less is Better: Insights from the Product Mix Dilemma from the Theory of Constraints Perspective.” International Journal of Production Research 51 (19): 5839–5852. doi:10.1080/00207543.2013.802052.
  • de Souza, M. C., T. A. Souza, and G. L. R. Vaccaro. 2016. “Hospital Bed Management: An Analysis From the Perspective of the Theory of Constraints.” Revista Espacios 37 (30).
  • Dettmer, H. W. 2007. The Logical Thinking Process: A Systems Approach to Complex Problem Solving. Milwaukee: ASQ Quality Press.
  • Eden, Y., and B. Ronen. 1991. “The Hourly Rate: Myth and Reality.” Industrial Management 33: 28–30.
  • Eden, Y., and B. Ronen. 2007. Approximately Right Not Precisely Wrong: Cost Accounting Pricing & Decision Making. The North River Press.
  • Ehie, I., and C. Sheu. 2005. “Integrating Six Sigma and Theory of Constraints for Continuous Improvement: A Case Study.” Journal of Manufacturing Technology Management 16 (5): 542–553. doi:10.1108/17410380510600518.
  • Fahimnia, B., J. Sarkis, and H. Davarzani. 2015. “Green Supply Chain Management: A Review and Bibliometric Analysis.” International Journal of Production Economics 162: 101–114. doi:10.1016/j.ijpe.2015.01.003.
  • Finch, B. J., and R. L. Luebbe. 2000. “Response to ‘Theory of Constraints and Linear Programming: A Re-Examination’.” International Journal of Production Research 38 (6): 1465–1466. doi:10.1080/002075400188960.
  • Fredendall, L. D., and B. R. Lea. 1997. “Improving the Product Mix Heuristic in the Theory of Constraints.” International Journal of Production Research 35 (6): 1535–1544. doi:10.1080/002075497195100.
  • Fredendall, L. D., J. W. Patterson, C. Lenhartz, and B. C. Mitchell. 2002. “What Should be Changed?” Quality Progress 35 (1).
  • Gelders, L. F., and L. N. Van Wassenhove. 1985. “Capacity Planning in MRP, JIT and OPT: A Critique.” Engineering Costs and Production Economics 9 (1-3): 201–209. doi: 10.1016/0167-188X(85)90029-1
  • Georgiadis, P., and A. Politou. 2013. “Dynamic Drum-Buffer-Rope Approach for Production Planning and Control in Capacitated Flow-Shop Manufacturing Systems.” Computers and Industrial Engineering 65 (4): 689–703. doi:10.1016/j.cie.2013.04.013.
  • Geri, N., and B. Ronen. 2005. “Relevance Lost: The Rise and Fall of Activity-Based Costing.” Human Systems Management 24 (2): 133–144.
  • Ghorbani, M., S. M. Arabzad, H. Shirouyehzad, and A. Shahin. 2014. “Developing a Logical Model for Cellular Manufacturing Systems by Theory of Constraints Thinking Process Approach.” International Journal of Logistics Systems and Management 18 (2): 270–282. doi: 10.1504/IJLSM.2014.062330
  • Goldratt, E. M. 1988. “Computerized Shop Floor Scheduling.” International Journal of Production Research 26 (3): 443–455. doi:10.1080/00207548808947875.
  • Goldratt, E. M. 1990a. The Haystack Syndrome: Sifting Information Out of the Data Ocean. Croton-on-Hudson, NY: North River Press.
  • Goldratt, E. M. 1990b. What is This Thing Called Theory of Constraints and how Should it be Implemented? Croton-on-Hudson, NY: North River Press.
  • Goldratt, E. M. 1994. It’s Not Luck. Great Barrington, MA: North River Press.
  • Goldratt, E. M. 1997. Critical Chain. Great Barrington, MA: North River Press.
  • Goldratt, E. M. 2008. The Choice. Great Barrington, MA: North River Press.
  • Goldratt, E. M. 2010. “Introduction to TOC – My Perspective.” In Theory of Constraints Handbook, edited by J. F. Cox III, and J. G. Schleier, 3–9. New York, NY: McGraw-Hill.
  • Goldratt, E. M., and J. Cox. 1984. The Goal: Excellence in Manufacturing. Croton-on-Hudson, NY: North River Press.
  • Goldratt, E. M., I. Eshkoli, and J. Brownleer. 2009 Isn’t It Obvious? Great Barrington, MA: North River Press.
  • Goldratt, E. M., and R. E. Fox. 1986. The Race. Croton-on-Hudson, NY: North River Press.
  • Goldratt, E. M., E. Schragenheim, and C. A. Ptak. 2000. Necessary but Not Sufficient. Great Barrington, MA: North River Press.
  • Goldratt-Ashlag, E. 2010. “The Layers of Resistance: The Buy-In Process According to TOC.” In Theory of Constraints Handbook, edited by J. F. Cox III, and J. G. Schleier, 571–585. New York, NY: McGraw-Hill.
  • Golmohammadi, D. 2015. “A Study of Scheduling Under the Theory of Constraints.” International Journal of Production Economics 165: 38–50. doi: 10.1016/j.ijpe.2015.03.015
  • González, M. O. A., J. S. Gonçalves, and R. M. Vasconcelos. 2017. “Sustainable Development: Case Study in the Implementation of Renewable Energy in Brazil.” Journal of Cleaner Production 142: 461–475. doi: 10.1016/j.jclepro.2016.10.052
  • González-Benito, J., G. Lannelongue, and J. A. Alfaro-Tanco. 2013. “Study of Supply-Chain Management in the Automotive Industry: A Bibliometric Analysis.” International Journal of Production Research 51 (13): 3849–3863. doi:10.1080/00207543.2012.752586.
  • Groop, J., M. Ketokivi, M. Gupta, and J. Holmström. 2017. “Improving Home Care: Knowledge Creation Through Engagement and Design.” Journal of Operations Management 53-56: 9–22. doi:10.1016/j.jom.2017.11.001.
  • Grosfeld-Nir, A., B. Ronen, and N. Kozlovsky. 2007. “The Pareto Managerial Principle: When Does it Apply?” International Journal of Production Research 45 (10): 2317–2325. doi: 10.1080/00207540600818203
  • Grünwald, H., P. E. T. Striekwold, and P. J. Weeda. 1989. “A Framework for Quantitative Comparison of Production Control Concepts.” International Journal of Production Research 27 (2): 281–292. doi: 10.1080/00207548908942547
  • Gupta, M. 2001. “Activity-Based Throughput Management in a Manufacturing Company.” International Journal of Production Research 39 (6): 1163–1182. doi: 10.1080/00207540010023556
  • Gupta, M. 2003. “Constraints Management – Recent Advances and Practices.” International Journal of Production Research 41 (4): 647–659. doi:10.1080/0020754031000065458.
  • Gupta, M., and S. Andersen. 2012. “Revisiting Local TOC Measures in an Internal Supply Chain: A Note.” International Journal of Production Research 50 (19): 5363–5371. doi: 10.1080/00207543.2011.627389
  • Gupta, M., and S. Andersen. 2018. “Throughput/Inventory Dollar-Days: TOC-Based Measures for Supply Chain Collaboration.” International Journal of Production Research, 1–17. doi:10.1080/00207543.2018.1444805. doi: 10.1080/00207543.2018.1456698
  • Gupta, M., S. J. Baxendale, and P. S. Raju. 2002. “Integrating ABM/TOC Approaches for Performance Improvement: A Framework and Application.” International Journal of Production Research 40 (14): 3225–3251. doi: 10.1080/00207540210147016
  • Gupta, M., and L. H. Boyd. 2008. “Theory of Constraints: A Theory for Operations Management.” International Journal of Operations and Production Management 28 (10): 991–1012. doi:10.1108/01443570810903122.
  • Gupta, M., L. H. Boyd, and F. Kuzmits. 2011. “The Evaporating Cloud: A Tool for Resolving Workplace Conflict.” International Journal of Conflict Management 22 (4): 394–412. doi: 10.1108/10444061111171387
  • Gupta, M., L. H. Boyd, and L. Sussman. 2004. “To Better Maps: A TOC Primer for Strategic Planning.” Business Horizons 47 (2): 15–26. doi: 10.1016/j.bushor.2003.10.001
  • Hall, N. G. 2012. “Project Management: Recent Developments and Research Opportunities.” Journal of Systems Science and Systems Engineering 21 (2): 129–143. doi: 10.1007/s11518-012-5190-5
  • Herroelen, W., and R. Leus. 2001. “On the Merits and Pitfalls of Critical Chain Scheduling.” Journal of Operations Management 19 (5): 559–577. doi:10.1016/S0272-6963(01)00054-7.
  • Herroelen, W., and R. Leus. 2004. “Robust and Reactive Project Scheduling: A Review and Classification of Procedures.” International Journal of Production Research 42 (8): 1599–1620. doi:10.1080/00207540310001638055.
  • Hilmola, O. P., and W. Li. 2016. “Throughput Accounting Heuristics is Still Adequate: Response to Criticism.” Expert Systems with Applications 58: 221–228. doi: 10.1016/j.eswa.2016.03.051
  • Hsu, T., and S. Chung. 1998. “The TOC-Based Algorithm for Solving Product Mix Problems.” Production Planning and Control 9 (1): doi:36–46. 10.1080/095372898234505.
  • Hu, X., E. Demeulemeester, N. Cui, J. Wang, and W. Tian. 2017. “Improved Critical Chain Buffer Management Framework Considering Resource Costs and Schedule Stability.” Flexible Services and Manufacturing Journal 29 (2): 159–183. doi: 10.1007/s10696-016-9241-y
  • Hua, Z. S., S. Coulibaly, and W. Wang. 2006. “TOC & TRIZ Based Product Design Method and its Application.” Computer Integrated Manufacturing Systems-Beijing 12 (6).
  • Hunink, M. M. 2001. “In Search of Tools to Aid Logical Thinking and Communicating About Medical Decision Making.” Medical Decision Making 21 (4): 267–277. doi: 10.1177/0272989X0102100402
  • Inman, R. A., M. L. Sale, and K. W. Green Jr. 2009. “Analysis of the Relationships Among TOC Use, TOC Outcomes, and Organizational Performance.” International Journal of Operations & Production Management 29 (4): 341–356. doi: 10.1108/01443570910945819
  • Irani, Z., A. Gunasekaran, and Y. K. Dwivedi. 2010. “Radio Frequency Identification (RFID): Research Trends and Framework.” International Journal of Production Research 48 (9): 2485–2511. doi:10.1080/00207540903564900.
  • Iranmanesh, M., A. K. Siti-Nabiha, and M. Sabbah. 2012. “The Retention of Trained Production Workers in a Small Manufacturing Company in Malaysia.” International Journal of Entrepreneurship and Small Business 16 (1): 71–82. doi: 10.1504/IJESB.2012.046918
  • Jacobs, F. R. 1984. “OPT Uncovered: Many Production Planning and Scheduling Concepts Can be Applied with or Without the Software.” Industrial Engineering 16 (10).
  • Jiang, X., H. Wu, T. Tsai, and H. Hu. 2013. “Diverse Replenishment Frequency Model for TOC Supply Chain Replenishment Systems with Capacity Constraints.” International Journal of Modelling, Identification and Control 19 (3): 248–256. doi: 10.1504/IJMIC.2013.055430
  • Kania, E., G. Housden, and K. Hitchner. 2002. “The Theory of Constraints: A Unique Alternative to Traditional Project Management.” Drug Information Journal 36 (3): 611–621. doi: 10.1177/009286150203600315
  • Kee, R., and C. Schmidt. 2000. “A Comparative Analysis of Utilizing Activity-Based Costing and the Theory of Constraints for Making Product-Mix Decisions.” International Journal of Production Economics 63 (1): 1–17. doi: 10.1016/S0925-5273(99)00005-5
  • Kim, S., J. F. Cox, and V. J. Mabin. 2010. “An Exploratory Study of Protective Inventory in a Re-Entrant Line with Protective Capacity.” International Journal of Production Research 48 (14): 4153–4178. doi:10.1080/00207540902991666.
  • Kim, S., V. J. Mabin, and J. Davies. 2008. “The Theory of Constraints Thinking Processes: Retrospect and Prospect.” International Journal of Operations and Production Management 28 (2): 155–184. doi:10.1108/01443570810846883.
  • Kishira, Y. 2006. “A Case Study of Reengineering Public Works Management at a Japanese Government Ministry.” PM World Today 8 (11).
  • Kishira, Y. 2009a. Transformation Management by Harmony. Great Barrington: North River Press.
  • Kishira, Y. 2009b. Win-Win-Win Public Work Management Transformation. http://www.sanpouyoshi.jp/conf2009/pdf/conf2009-kishira.pdf.
  • Klimentova, S., and T. Hirtz. 2012. “A Deep Diagnosis of Causes of Problems in Public Administration Based on the Theory of Constraints.” International Journal of Knowledge, Culture and Change Management.
  • Kuo, T. C., S. H. Chang, and S. N. Huang. 2009. “Due-Date Performance Improvement Using TOC’s Aggregated Time Buffer Method at a Wafer Fabrication Factory.” Expert Systems with Applications 36 (2): 1783–1792. doi: 10.1016/j.eswa.2007.12.038
  • Lacerda, D. P., R. A. Cassel, and L. H. Rodrigues. 2010. “Service Process Analysis Using Process Engineering and the Theory of Constraints Thinking Process.” Business Process Management Journal 16 (2): 264–281. doi: 10.1108/14637151011035598
  • Lang, L. 2010. “Mafia Offers: Dealing with a Market Constraint.” In Theory of Constraints Handbook, edited by J. F. Cox III, and J. G. Schleier, 603–628. New York, NY: McGraw-Hill.
  • Leach, L. P. 1999. “Critical Chain Project Management Improves Project Performance.” Project Management Journal 30 (2): 39–51. doi: 10.1177/875697289903000207
  • Lechler, T. G., B. Ronen, and E. A. Stohr. 2005. “Critical Chain: A New Project Management Paradigm or Old Wine in New Bottles?” EMJ – Engineering Management Journal 17 (4): 45–58. doi:10.1080/10429247.2005.11431672.
  • Lee, J., J. Chang, C. Tsai, and R. Li. 2010. “Research on Enhancement of TOC Simplified Drum-Buffer-Rope System Using Novel Generic Procedures.” Expert Systems with Applications 37 (5): 3747–3754. doi:10.1016/j.eswa.2009.11.049.
  • Lee, T., and G. Plenert. 1996. “Maximizing Product Mix Profitability-What’s the Best Analysis Tool.” Production Planning & Control 7 (6): 547–553. doi: 10.1080/09537289608930388
  • Lee, H., and D. W. Seo. 2016. “Performance Evaluation of WIP-Controlled Line Production Systems with Constant Processing Times.” Computers & Industrial Engineering 94: 138–146. doi: 10.1016/j.cie.2016.02.006
  • Leshno, M., and B. Ronen. 2001. “The Complete Kit Concept–Implementation in the Health Care System.” Human Systems Management 20 (4): 313–318.
  • Librelato, T. P., D. P. Lacerda, L. H. Rodrigues, and D. R. Veit. 2014. “A Process Improvement Approach Based on the Value Stream Mapping and the Theory of Constraints Thinking Process.” Business Process Management Journal 20 (6): 922–949. doi: 10.1108/BPMJ-07-2013-0098
  • Linhares, A. 2009. “Theory of Constraints and the Combinatorial Complexity of the Product-Mix Decision.” International Journal of Production Economics 121 (1): 121–129. doi: 10.1016/j.ijpe.2009.04.023
  • Liu, S. X., J. H. Song, and J. F. Tang. 2006. “Critical Chain Based Approach for Resource-Constrained Project Scheduling.” Acta Automatica Sinica 32 (1): 60–66.
  • Liu, X., R. Tan, and L. Yao. 2008. “Application Research on Integrated Process Model for the Conceptual Design of Product Innovation.” Chinese Journal of Mechanical Engineering 44 (9): 154–162. doi: 10.3901/JME.2008.09.154
  • Long, L. D., and A. Ohsato. 2008. “Fuzzy Critical Chain Method for Project Scheduling Under Resource Constraints and Uncertainty.” International Journal of Project Management 26 (6): 688–698. doi:10.1016/j.ijproman.2007.09.012.
  • Lowalekar, H., and R. R. Ravi. 2017. “Revolutionizing Blood Bank Inventory Management Using the TOC Thinking Process: An Indian Case Study.” International Journal of Production Economics 186: 89–122. doi: 10.1016/j.ijpe.2017.02.003
  • Luebbe, R., and B. Finch. 1992. “Theory of Constraints and Linear Programming: A Comparison.” International Journal of Production Research 30 (6): 1471–1478. doi:10.1080/00207549208942967.
  • Lundrigan, R. 1986. “What is this Thing Called OPT?” Production and Inventory Management Washington, D.C. 27 (2): 2–12.
  • Mabin, V. J., and S. J. Balderstone. 1999. The World of the Theory of Constraints: A Review of the International Literature. CRC Press.
  • Mabin, V. J., and S. J. Balderstone. 2003. “The Performance of the Theory of Constraints Methodology: Analysis and Discussion of Successful TOC Applications.” International Journal of Operations and Production Management 23 (5-6): 568–595. doi:10.1108/01443570310476636.
  • Mabin, V. J., and J. Davies. 2003. “Framework for Understanding the Complementary Nature of TOC Frames: Insights from the Product Mix Dilemma.” International Journal of Production Research 41 (4): 661–680. doi:10.1080/0020754031000065467.
  • Manikas, A., M. Gupta, and L. H. Boyd. 2015. “Experiential Exercises with Four Production Planning and Control Systems.” International Journal of Production Research 53 (14): 4206–4217. doi:10.1080/00207543.2014.985393.
  • Meleton Jr, M. P. 1986. “OPT – Fantasy or Breakthrough?” Production and Inventory Management Washington, D.C. 27 (2): 13–21.
  • Mishra, N., M. K. Tiwari, R. Shankar, and F. T. Chan. 2005. “Hybrid Tabu-Simulated Annealing Based Approach to Solve Multi-Constraint Product Mix Decision Problem.” Expert Systems with Applications 29 (2): 446–454. doi: 10.1016/j.eswa.2005.04.044
  • Moily, J. P. 2015. “Economic Manufacturing Quantity and its Integrating Implications.” Production and Operations Management 24 (11): 1696–1705. doi: 10.1111/poms.12411
  • Naor, M., E. S. Bernardes, and A. Coman. 2013. “Theory of Constraints: Is it a Theory and a Good one?” International Journal of Production Research 51 (2): 542–554. doi: 10.1080/00207543.2011.654137
  • Nazari-Shirkouhi, S., H. Eivazy, R. Ghodsi, K. Rezaie, and E. Atashpaz-Gargari. 2010. “Solving the Integrated Product Mix-Outsourcing Problem Using the Imperialist Competitive Algorithm.” Expert Systems with Applications 37 (12): 7615–7626. doi:10.1016/j.eswa.2010.04.081.
  • Neely, A. D., and M. D. Byrne. 1992. “A Simulation Study of Bottleneck Scheduling.” International Journal of Production Economics 26 (1-3): 187–192. doi:10.1016/0925-5273(92)90062-C.
  • Niv, M. B., Z. Lieber, and B. Ronen. 2010. “Focused Management in a Court System: Doing More with the Existing Resources.” Human Systems Management 29 (4): 265–277. doi:10.3233/HSM-2010-0731.
  • Onwubolu, G. C. 2001. “Tabu Search-Based Algorithm for the TOC Product Mix Decision.” International Journal of Production Research 39 (10): 2065–2076. doi:10.1080/00207540010005736.
  • Panizzolo, R. 2016. “Theory of Constraints (TOC) Production and Manufacturing Performance.” International Journal of Industrial Engineering and Management 7 (1): 15–23.
  • Patterson, M. C. 1992. “The Product-Mix Decision: A Comparison of Theory of Constraints and Labor-Based Management Accounting.” Production and Inventory Management Journal 33 (3).
  • Patwardhan, M. B., A. Sarría-Santamera, and D. B. Matchar. 2006. “Improving the Process of Developing Technical Reports for Health Care Decision-Makers: Using the Theory of Constraints in the Evidence-Based Practice Centers.” International Journal of Technology Assessment in Health Care 22 (1): 26–32. doi: 10.1017/S026646230605080X
  • Pérez, J. L. 1997. “TOC for World Class Global Supply Chain Management.” Computers and Industrial Engineering 33 (1-2): 289–293. doi: 10.1016/S0360-8352(97)00095-8
  • Plenert, G. 1993. “Optimizing Theory of Constraints When Multiple Constrained Resources Exist.” European Journal of Operational Research 70 (1): 126–133. doi:10.1016/0377-2217(93)90237-H.
  • Plenert, G. 1999. “Focusing Material Requirements Planning (MRP) Towards Performance.” European Journal of Operational Research 119 (1): 91–99. doi:10.1016/S0377-2217(98)00339-7.
  • Plenert, G., and T. D. Best. 1986. “MRP, JIT, and OPT: What’s ‘Best’?” Production and Inventory Management Washington, D.C. 27 (2): 22–29.
  • Ponte, B., J. Costas, J. Puche, D. De la Fuente, and R. Pino. 2016. “Holism Versus Reductionism in Supply Chain Management: An Economic Analysis.” Decision Support Systems 86: 83–94. doi: 10.1016/j.dss.2016.03.010
  • Pretorius, P. 2014. “Introducing in-Between Decision Points to TOCs Five Focusing Steps.” International Journal of Production Research 52 (2): 496–506. doi:10.1080/00207543.2013.836612.
  • Rahman, S. 1998. “Theory of Constraints: A Review of the Philosophy and its Applications.” International Journal of Operations and Production Management 18 (4): 336–355. doi:10.1108/01443579810199720.
  • Rahman, S. 2002. “The Theory of Constraints’ Thinking Process Approach to Developing Strategies in Supply Chains.” International Journal of Physical Distribution & Logistics Management 32 (10): 809–828. doi:10.1108/09600030210455429.
  • Rand, G. K. 2000. “Critical Chain: The Theory of Constraints Applied to Project Management.” International Journal of Project Management 18 (3): 173–177. doi: 10.1016/S0263-7863(99)00019-8
  • Ray, A., B. Sarkar, and S. Sanyal. 2011. “An Exploratory Analysis of Optimizing Product Mix Through Heuristic: an Eclectic Decision.” International Journal of Industrial Engineering 18 (9).
  • Raz, T., R. Barnes, and D. Dvir. 2003. “A Critical Look at Critical Chain Project Management.” Project Management Journal 34 (4): 24–32. doi: 10.1177/875697280303400404
  • Reid, R. A. 2006. “Productivity and Quality Improvement: An Implementation Framework.” International Journal of Productivity and Quality Management 1 (1-2): 26–36. doi: 10.1504/IJPQM.2006.008371
  • Reid, R. A., and J. R. Cormier. 2003. “Applying the TOC TP: A Case Study in the Service Sector.” Managing Service Quality: An International Journal 13 (5): 349–369. doi: 10.1108/09604520310495831
  • Reid, R. A., and T. E. Shoemaker. 2006. “Using the Theory of Constraints to Focus Organizational Improvement Efforts: Part 1-Defining the Problem.” American Water Works Association. Journal 98 (7). doi: 10.1002/j.1551-8833.2006.tb07711.x
  • Rogalska, M., and Z. Hejducki. 2007. “Time Buffers in Construction Process Scheduling.” Journal of Civil Engineering and Management 13 (2): 143–148.
  • Ronen, B., A. Coman, and E. Schragenheim. 2001. “Peak Management.” International Journal of Production Research 39 (14): 3183–3193. doi: 10.1080/00207540110054588
  • Ronen, B., R. Gur, and S. Pass. 1994. “Focused Management in Military Organizations: An Avenue for Future Industrial Engineering.” Computers & Industrial Engineering 27 (1-4): 543–544. doi: 10.1016/0360-8352(94)90354-9
  • Ronen, B., T. G. Lechler, and E. A. Stohr. 2012. “The 25/25 Rule: Achieving More by Doing Less.” International Journal of Production Research 50 (24): 7126–7133. doi: 10.1080/00207543.2011.636387
  • Ronen, B., and Y. Spector. 1992. “Managing System Constraints: A Cost/Utilization Approach.” International Journal of Production Research 30 (9): 2045–2061. doi: 10.1080/00207549208948137
  • Ronen, B., and M. K. Starr. 1990. “Synchronized Manufacturing as in OPT: From Practice to Theory.” Computers and Industrial Engineering 18 (4): 585–600. doi:10.1016/0360-8352(90)90017-G.
  • Rossi Filho, T. A., D. A. J. Pacheco, I. Pergher, J. A. V. Antunes, G. L. R. Vaccaro, and D. F. da Luz. 2013. “A Reference Approach to Deploy the Solution of Logistics Theory of Constraints.” Espacios 34 (7).
  • Rossi Filho, T. A., D. A. J. Pacheco, I. Pergher, G. L. R. Vaccaro, and J. A. V. Antunes. 2016. “A New Approach for Decision Making in Distribution Supply Chains: A Theory of Constraints Perspective.” International Journal of Logistics Systems and Management 25 (2): 266–282. doi:10.1504/IJLSM.2016.078916.
  • Russell, G. R., and T. D. Fry. 1997. “Order Review/Release and Lot Splitting in Drum-Buffer-Rope.” International Journal of Production Research 35 (3): 827–845. doi:10.1080/002075497195731.
  • Sahi, G., M. Gupta, and P. C. Patel. 2017. “A Measure of Throughput Orientation: Scale Development and Nomological Validation.” Decision Sciences 48 (3): 420–453. doi:10.1111/deci.12227.
  • Sanjika, T. M., and C. N. Bezuidenhout. 2016. “A Primary Influence Vertex Approach to Identify Driving Factors in Complex Integrated Agri-Industrial Systems – an Example from Sugarcane Supply and Processing Systems.” International Journal of Production Research 54 (15): 4506–4519. doi:10.1080/00207543.2015.1064552.
  • Scheinkopf, L. 2010. “Thinking Process Including S&T Trees.” In Theory of Constraints Handbook, edited by J. F. Cox III, and J. G. Schleier, 729–786. New York, NY: McGraw-Hill.
  • Schragenheim, E. 2010a. “Managing Make-to-Stock and the Concept of Make-to-Availability.” In Theory of Constraints Handbook, edited by J. F. Cox III, and J. G. Schleier, 239–264. New York, NY: McGraw-Hill.
  • Schragenheim, A. 2010b. “Supply Chain Management.” In Theory of Constraints Handbook, edited by J. F. Cox III, and J. G. Schleier, 265–302. New York, NY: McGraw-Hill.
  • Schragenheim, E. 2012. “Developing the Process for Top Level Decision Making.” Annals of 10th TOCICO International Conference. http://c.ymcdn.com/sites/www.tocico.org/resource/resmgr/2012_foundation_pdfs/schragenheim,_eli_final_5-23.pdf.
  • Schragenheim, E., and H. W. Dettmer. 2001. Manufacturing at Warp Speed. Boca Raton: St. Lucie Press.
  • Schragenheim, E., H. W. Dettmer, and J. W. Patterson. 2009. Supply Chain Management at Warp Speed: Integrating the System From End to End. CRC Press.
  • Schragenheim, E., and B. Ronen. 1990. “Drum-Buffer-Rope Shop Floor Control.” Production and Inventory Management Washington, D.C. 31 (3): 18–22.
  • Schragenheim, E., A. Weisenstern, and A. Schragenheim. 2006. “What’s Really New in Simplified DBR.” Annals of Theory of Constraints International Certification Organization – TOCICO.
  • Shoemaker, T. E., and R. A. Reid. 2005. “Applying the TOC Thinking Process: A Case Study in the Government Sector.” Human Systems Management 24 (1): 21–37.
  • Simatupang, T. M., A. C. Wright, and R. Sridharan. 2004. “Applying the Theory of Constraints to Supply Chain Collaboration.” Supply Chain Management: An International Journal 9 (1): 57–70. doi:10.1108/13598540410517584.
  • Sobreiro, V. A., and M. S. Nagano. 2012. “A Review and Evaluation on Constructive Heuristics to Optimise Product Mix Based on the Theory of Constraints.” International Journal of Production Research 50 (20): 5936–5948. doi:10.1080/00207543.2011.638940.
  • Sokolov, A. Y., and T. V. Elsukova. 2016. “Using Abc to Enhance Throughput Accounting: An Integrated Management Approach.” Academy of Strategic Management Journal 15 (Special Issue 4): 8–15.
  • Sommer, K. A., and V. J. Mabin. 2016. “Insights Into the Eldercare Conundrum Through Complementary Lenses of Boardman’s SSM and TOC’s Evaporating Cloud.” European Journal of Operational Research 248 (1): 286–300. doi: 10.1016/j.ejor.2015.06.033
  • Souren, R., H. Ahn, and C. Schmitz. 2005. “Optimal Product Mix Decisions Based on the Theory of Constraints? Exposing Rarely Emphasized Premises of Throughput Accounting.” International Journal of Production Research 43 (2): 361–374. doi:10.1080/0020754042000273040.
  • Spector, Y. 2011. “Theory of Constraint Methodology Where the Constraint is the Business Model.” International Journal of Production Research 49 (11): 3387–3394. doi: 10.1080/00207541003801283
  • Spencer, M. S., and J. F. Cox. 1995. “Optimum Production Technology (OPT) and the Theory of Constraints (TOC): Analysis and Genealogy.” International Journal of Production Research 33 (6): 1495–1504. doi:10.1080/00207549508930224.
  • Stevenson, M., L. C. Hendry, and B. G. Kingsman. 2005. “A Review of Production Planning and Control: The Applicability of Key Concepts to the Make-to-Order Industry.” International Journal of Production Research 43 (5): 869–898. doi:10.1080/0020754042000298520.
  • Steyn, H. 2001. “An Investigation Into the Fundamentals of Critical Chain Project Scheduling.” International Journal of Project Management 19 (6): 363–369. doi: 10.1016/S0263-7863(00)00026-0
  • Steyn, H. 2002. “Project Management Applications of the Theory of Constraints Beyond Critical Chain Scheduling.” International Journal of Project Management 20 (1): 75–80. doi: 10.1016/S0263-7863(00)00054-5
  • Suerken, K. 2010. “Theory of Constraints for Education.” In Theory of Constraints Handbook, edited by J. F. Cox III, and J. G. Schleier, 787–812. New York, NY: McGraw-Hill.
  • Sun, R., and K. Leng. 2013. “Inventory Control Policy for E-Tail Organizations Based on TOC.” Information Technology Journal 12 (24): 8171–8175. doi:10.3923/itj.2013.8171.8175.
  • Taticchi, P., P. Garengo, S. S. Nudurupati, F. Tonelli, and R. Pasqualino. 2015. “A Review of Decision-Support Tools and Performance Measurement and Sustainable Supply Chain Management.” International Journal of Production Research 53 (21): 6473–6494. doi:10.1080/00207543.2014.939239.
  • Taylor III, L. J., B. Murphy, and W. Price. 2006. “Goldratt’s Thinking Process Applied to Employee Retention.” Business Process Management Journal 12 (5): 646–670. doi: 10.1108/14637150610691055
  • Taylor III, L. J., and I. Poyner. 2008. “Goldratt’s Thinking Process Applied to the Problems Associated with Trained Employee Retention in a Highly Competitive Labor Market.” Journal of European Industrial Training 32 (7): 594–608. doi: 10.1108/03090590810899847
  • Taylor III, L. J., and D. Sheffield. 2002. “Goldratt’s Thinking Process Applied to Medical Claims Processing.” Hospital Topics 80 (4): 13–21. doi: 10.1080/00185860209598005
  • Thürer, M., and M. Stevenson. 2017. “On the Beat of the Drum: Improving the Flow Shop Performance of the Drum–Buffer–Rope Scheduling Mechanism.” International Journal of Production Research 56 (9): 3294–3305. doi:10.1080/00207543.2017.1401245.
  • Thürer, M., M. Stevenson, C. Silva, and T. Qu. 2017. “Drum-buffer-rope and Workload Control in High-Variety Flow and Job Shops with Bottlenecks: An Assessment by Simulation.” International Journal of Production Economics 188: 116–127. doi: 10.1016/j.ijpe.2017.03.025
  • Tollington, T., and P. Wachter. 2001. “ABC/TA for Internet Retail Shopping.” International Journal of Retail & Distribution Management 29 (4): 149–155. doi: 10.1108/09590550110387944
  • Tsai, W. H., J. C. Chang, C. L. Hsieh, T. S. Tsaur, and C. W. Wang. 2016. “Sustainability Concept in Decision-Making: Carbon Tax Consideration for Joint Product Mix Decision.” Sustainability 8 (12).
  • Tsai, W. H., H. C. Chen, J. D. Leu, Y. C. Chang, and T. W. Lin. 2013. “A Product-Mix Decision Model Using Green Manufacturing Technologies Under Activity-Based Costing.” Journal of Cleaner Production 57: 178–187. doi: 10.1016/j.jclepro.2013.04.011
  • Tsai, W. H., L. Kuo, T. W. Lin, Y. C. Kuo, and Y. S. Shen. 2010. “Price Elasticity of Demand and Capacity Expansion Features in an Enhanced ABC Product-Mix Decision Model.” International Journal of Production Research 48 (21): 6387–6416. doi: 10.1080/00207540903289763
  • Tsai, W. H., C. W. Lai, L. J. Tseng, and W. C. Chou. 2008. “Embedding Management Discretionary Power Into an ABC Model for a Joint Products Mix Decision.” International Journal of Production Economics 115 (1): 210–220. doi:10.1016/j.ijpe.2008.05.013.
  • Tsou, C. M. 2013. “On the Strategy of Supply Chain Collaboration Based on Dynamic Inventory Target Level Management: A Theory of Constraint Perspective.” Applied Mathematical Modelling 37 (7): 5204–5214. doi: 10.1016/j.apm.2012.10.031
  • Tukel, O. I., W. O. Rom, and S. D. Eksioglu. 2006. “An Investigation of Buffer Sizing Techniques in Critical Chain Scheduling.” European Journal of Operational Research 172 (2): 401–416. doi: 10.1016/j.ejor.2004.10.019
  • Umble, M., and E. Umble. 2000. “Manage Your Projects for Success: An Application of the Theory of Constraints.” Production and Inventory Management Journal 41 (2).
  • Umble, M., and E. Umble. 2006. “Utilizing Buffer Management to Improve Performance in a Healthcare Environment.” European Journal of Operational Research 174 (2): 1060–1075. doi: 10.1016/j.ejor.2005.02.059
  • van Eck, N. J., and L. Waltman. 2010. “Software Survey: VOSviewer, a Computer Program for Bibliometric Mapping.” Scientometrics 84 (2): 523–538. doi:10.1007/s11192-009-0146-3.
  • van Eck, N. J., and L. Waltman. 2014. “Visualizing Bibliometric Networks.” In Measuring Scholarly Impact: Methods and Practice, edited by Y. Ding, R. Rousseau, and D. Wolfram, 285–320. Springer.
  • van Eck, N. J., and L. Waltman. 2016. Vosviewer Manual: Manual for VOSviewer Version 1.6.5. CWTS, Universiteit Leiden.
  • van Eck, N. J., and L. Waltman. 2017. “Citation-Based Clustering of Publications Using CitNetExplorer and VOSviewer.” Scientometrics 111 (2): 1053–1070. doi:10.1007/s11192-017-2300-7.
  • Wang, L. C., C. Y. Cheng, Y. T. Tseng, and Y. F. Liu. 2015. “Demand-Pull Replenishment Model for Hospital Inventory Management: A Dynamic Buffer-Adjustment Approach.” International Journal of Production Research 53 (24): 7533–7546. doi:10.1080/00207543.2015.1102353.
  • Wang, J. Q., S. D. Sun, G. G. Niu, and Y. N. Zhai. 2011. “Capacity-Constrained Product Mix Optimization Based on Theory of Constraints and Immune Algorithm.” Computer Integrated Manufacturing Systems 17 (6): 1247–1256.
  • Wang, W. X., X. Wang, X. L. Ge, and L. Deng. 2014. “Multi-Objective Optimization Model for Multi-Project Scheduling on Critical Chain.” Advances in Engineering Software 68: 33–39. doi: 10.1016/j.advengsoft.2013.11.004
  • Watson, K. J., J. H. Blackstone, and S. C. Gardiner. 2007. “The Evolution of a Management Philosophy: The Theory of Constraints.” Journal of Operations Management 25 (2): 387–402. doi:10.1016/j.jom.2006.04.004.
  • Watson, K. J., and T. Polito. 2003. “Comparison of DRP and TOC Financial Performance Within a Multi-Product, Multi-Echelon Physical Distribution Environment.” International Journal of Production Research 41 (4): 741–765. doi:10.1080/0020754031000065511.
  • Wei, Z., X. Song, and D. Wang. 2017. “Manufacturing Flexibility, Business Model Design, and Firm Performance.” International Journal of Production Economics 193: 87–97. doi:10.1016/j.ijpe.2017.07.004.
  • Wu, H. H., H. H. Huang, and W. T. Jen. 2012. “A Study of the Elongated Replenishment Frequency of TOC Supply Chain Replenishment Systems in Plants.” International Journal of Production Research 50 (19): 5567–5581. doi:10.1080/00207543.2011.649803.
  • Wu, H. H., A. H. Lee, and T. P. Tsai. 2014. “A Two-Level Replenishment Frequency Model for TOC Supply Chain Replenishment Systems Under Capacity Constraint.” Computers & Industrial Engineering 72: 152–159. doi: 10.1016/j.cie.2014.03.006
  • Wu, S., J. S. Morris, and T. M. Gordon. 1994. “A Simulation Analysis of the Effectiveness of Drum-Buffer-Rope Scheduling in Furniture Manufacturing.” Computers and Industrial Engineering 26 (4): 757–764. doi:10.1016/0360-8352(94)90010-8.
  • Yan, L., B. Jinsong, H. Xiaofeng, and J. Ye. 2009. “A Heuristic Project Scheduling Approach for Quick Response to Maritime Disaster Rescue.” International Journal of Project Management 27 (6): 620–628. doi: 10.1016/j.ijproman.2008.10.001
  • Yang, S., and L. Fu. 2014. “Critical Chain and Evidence Reasoning Applied to Multi-Project Resource Schedule in Automobile R&D Process.” International Journal of Project Management 32 (1): 166–177. doi: 10.1016/j.ijproman.2013.01.010
  • Yeo, K. T., and J. H. Ning. 2002. “Integrating Supply Chain and Critical Chain Concepts in Engineer-Procure-Construct (EPC) Projects.” International Journal of Project Management 20 (4): 253–262. doi:10.1016/S0263-7863(01)00021-7.
  • Yuan, K. J., S. H. Chang, and R. K. Li. 2003. “Enhancement of Theory of Constraints Replenishment Using a Novel Generic Buffer Management Procedure.” International Journal of Production Research 41 (4): 725–740. doi: 10.1080/0020754031000065502
  • Zegordi, S. H., K. Itoh, T. Enkawa, and S. L. Chung. 1995. “Simulated Annealing Scheme Incorporating Move Desirability Table for Solution of Facility Layout Problems.” Journal of the Operations Research Society of Japan 38 (1): 1–20. doi: 10.15807/jorsj.38.1
  • Zhang, J., S. Jia, and E. Díaz. 2015. “A New Buffer Sizing Approach Based on the Uncertainty of Project Activities.” Concurrent Engineering 23 (1): 3–12. doi: 10.1177/1063293X14561871
  • Zhang, J., X. Song, H. Chen, and R. Shi. 2015. “Optimisation of Critical Chain Sequencing Based on Activities Information Flow Interactions.” International Journal of Production Research 53 (20): 6231–6241. doi:10.1080/00207543.2015.1043157.
  • Zhang, J., X. Song, H. Chen, and R. Shi. 2016. “Determination of Critical Chain Project Buffer Based on Information Flow Interactions.” Journal of the Operational Research Society 67 (9): 1146–1157. doi: 10.1057/jors.2016.9
  • Zhang, J., X. Song, and E. Díaz. 2014. “Buffer Sizing of Critical Chain Based on Attribute Optimization.” Concurrent Engineering 22 (3): 253–264. doi: 10.1177/1063293X14541286
  • Zhang, J., X. Song, and E. Díaz. 2016. “Project Buffer Sizing of a Critical Chain Based on Comprehensive Resource Tightness.” European Journal of Operational Research 248 (1): 174–182. doi: 10.1016/j.ejor.2015.07.009
  • Zhang, J., X. Song, and E. Díaz. 2017. “Critical Chain Project Buffer Sizing Based on Resource Constraints.” International Journal of Production Research 55 (3): 671–683. doi:10.1080/00207543.2016.1200151.
  • Zheng, Z., Z. Guo, Y. Zhu, and X. Zhang. 2014. “A Critical Chains Based Distributed Multi-Project Scheduling Approach.” Neurocomputing 143: 282–293. doi: 10.1016/j.neucom.2014.04.056
  • Zhuang, Z. Y., and S. C. Chang. 2017. “Deciding Product Mix Based on Time-Driven Activity-Based Costing by Mixed Integer Programming.” Journal of Intelligent Manufacturing 28 (4): 959–974. doi: 10.1007/s10845-014-1032-2
  • Zultner, R. E. 1999. “Project Estimation with Critical Chain: Third-Generation Risk Management.” Cutter IT Journal 12 (7): 4–12.
  • Zupancic, D., B. Buchmeister, and T. Aljaz. 2017. “Reducing the Time of Task Execution with Existing Resources – Comparison of Approaches.” International Journal of Simulation Modelling 16 (3): 484–496. doi:10.2507/IJSIMM16(3)10.394.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.