References
- Al-Salamah, M. 2016. “Economic Production Quantity in Batch Manufacturing with Imperfect Quality, Imperfect Inspection, and Destructive and Non-Destructive Acceptance Sampling in a Two-Tier Market.” Computers & Industrial Engineering 93: 275–285. doi: 10.1016/j.cie.2015.12.022
- Boone, T., R. Ganeshan, Y. Guo, and J. K. Ord. 2000. “The Impact of Imperfect Processes on Production Run Times.” Decision Sciences 31 (4): 773–787. doi: 10.1111/j.1540-5915.2000.tb00942.x
- Cárdenas-Barrón, L. E., G. Treviño-Garza, A. A. Taleizadeh, and P. Vasant. 2015. “Determining Replenishment lot Size and Shipment Policy for an EPQ Inventory Model with Delivery and Rework.” Mathematical Problems in Engineering 2015: 1–8. doi:10.1155/2015/595498.
- Chakraborty, T., B. C. Giri, and K. S. Chaudhuri. 2008. “Production Lot Sizing with Process Deterioration and Machine Breakdown.” European Journal of Operational Research 185 (2): 606–618. doi: 10.1016/j.ejor.2007.01.011
- Cheng, F. T., H. H. Chang, and S. W. Chiu. 2010. “Economic Production Quantity Model with Backordering, Rework and Machine Failure Taking Place in Stock Piling Time.” WSEAS Transactions on Information Science and Applications 7 (4): 463–473.
- Chiu, Y. P. 2003. “Determining the Optimal Lot Size for the Finite Production Model with Random Defective Rate, the Rework Process, and Backlogging.” Engineering Optimization 35 (4): 427–437. doi: 10.1080/03052150310001597783
- Chiu, S. W. 2008. “An Optimization Problem of Manufacturing Systems with Stochastic Machine Breakdown and Rework Process.” Applied Stochastic Models in Business and Industry 24 (3): 203–219. doi: 10.1002/asmb.699
- Chiu, S. W., D. C. Gong, C. L. Chiu, and C. L. Chung. 2011. “Joint Determination of the Production Lot Size and Number of Shipments for EPQ Model with Rework.” Mathematical and Computational Applications 16 (2): 317–328. doi: 10.3390/mca16020317
- Chiu, S. W., S. L. Wang, and Y. S. P. Chiu. 2007. “Determining the Optimal Run Time for EPQ Model with Scrap, Rework, and Stochastic Breakdowns.” European Journal of Operational Research 180 (2): 664–676. doi: 10.1016/j.ejor.2006.05.005
- Cunha, L. R. A., A. P. S. Delfino, K. A. dos Reis, and A. Leiras. 2018. “Economic Production Quantity (EPQ) Model with Partial Backordering and a Discount for Imperfect Quality Batches.” International Journal of Production Research 1–15. doi:10.1080/00207543.2018.1445878.
- Dem, H., and L. Prasher. 2013. “Imperfect Production System Under Reverse Logistics in Stock-Out Situation: EPQ Model.” Advances in Decision Sciences 2013: 1–10. doi:10.1155/2013/915675.
- Faulkner, W., and F. Badurdeen. 2014. “Sustainable Value Stream Mapping (Sus-VSM): Methodology to Visualize and Assess Manufacturing Sustainability Performance.” Journal of Cleaner Production 85: 8–18. doi: 10.1016/j.jclepro.2014.05.042
- García-Laguna, J., L. A. San-José, L. E. Cárdenas-Barrón, and J. Sicilia. 2010. “The integrality of the lot size in the basic EOQ and EPQ models: applications to other production-inventory models.” Applied Mathematics and Computation 216 (5): 1660–1672. doi: 10.1016/j.amc.2010.02.042
- Giri, B. C., and T. Dohi. 2007. “Inspection Scheduling for Imperfect Production Processes Under Free Repair Warranty Contract.” European Journal of Operational Research 183 (1): 238–252. doi: 10.1016/j.ejor.2006.09.062
- Giri, B. C., I. Moon, and W. Y. Yun. 2003. “Scheduling Economic Lot Sizes in Deteriorating Production Systems.” Naval Research Logistics (NRL) 50 (6): 650–661. doi: 10.1002/nav.10082
- Hayek, P. A., and M. K. Salameh. 2001. “Production Lot Sizing with the Reworking of Imperfect Quality Items Produced.” Production Planning & Control 12 (6): 584–590. doi: 10.1080/095372801750397707
- Ćirović, G., D. Pamučar, D. Sekulović, and B. Đorović. 2012. “Optimizing a Multi-Product and Multi-Supplier the Economic Production Quantity Model Using Genetic Algorithm.” International Journal of Physical Sciences 7 (2): 262–272.
- Jaggi, C. K., S. Tiwari, and A. Shafi. 2015. “Effect of Deterioration on Two-Warehouse Inventory Model with Imperfect Quality.” Computers & Industrial Engineering 88: 378–385. doi: 10.1016/j.cie.2015.07.019
- Jamal, A. M. M., B. R. Sarker, and S. Mondal. 2004. “Optimal Manufacturing Batch Size with Rework Process at a Single-Stage Production System.” Computers & Industrial Engineering 47 (1): 77–89. doi: 10.1016/j.cie.2004.03.001
- Khan, M., M. Hussain, and L. E. Cárdenas-Barrón. 2017. “Learning and Screening Errors in an EPQ Inventory Model for Supply Chains with Stochastic Lead Time Demands.” International Journal of Production Research 55 (16): 4816–4832. doi: 10.1080/00207543.2017.1310402
- Leung, K. N. F. 2009. “Optimal Production Lot Sizing with Backlogging, Random Defective Rate, and Rework Derived Without Derivatives.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 223 (8): 1081–1084. doi: 10.1243/09544054JEM1530
- Liao, G. L. 2016. “Optimal Economic Production Quantity Policy for a Parallel System with Repair, Rework, Free-Repair Warranty and Maintenance.” International Journal of Production Research 54 (20): 6265–6280. doi: 10.1080/00207543.2016.1203074
- Lin, Y. H., Y. C. Chen, and W. Y. Wang. 2016. “Optimal Production Model for Imperfect Process with Imperfect Maintenance, Minimal Repair and Rework.” International Journal of Systems Science: Operations & Logistics 4 (3): 229–240.
- Mandal, N. K., and T. K. Roy. 2006. “Multi-Item Imperfect Production Lot Size Model with Hybrid Number Cost Parameters.” Applied Mathematics and Computation 182 (2): 1219–1230. doi: 10.1016/j.amc.2006.04.071
- Moshtagh, M. S., and A. A. Taleizadeh. 2017. “Stochastic Integrated Manufacturing and Remanufacturing Model with Shortage, Rework and Quality Based Return Rate in a Closed Loop Supply Chain.” Journal of Cleaner Production 141: 1548–1573. doi: 10.1016/j.jclepro.2016.09.173
- Ojha, D., B. R. Sarker, and P. Biswas. 2007. “An Optimal Batch Size for an Imperfect Production System with Quality Assurance and Rework.” International Journal of Production Research 45 (14): 3191–3214. doi: 10.1080/00207540600711853
- Pacheco-Velázquez, E. A., and L. E. Cárdenas-Barrón. 2016. “An Economic Production Quantity (EPQ) Inventory Model with Backorders Considering the Raw Material Costs.” Scientia Iranica 23 (2): 736–746. doi: 10.24200/sci.2016.3859
- Pasandideh, S. H. R., S. T. A. Niaki, A. H. Nobil, and L. E. Cárdenas-Barrón. 2015. “A Multiproduct Single Machine Economic Production Quantity Model for an Imperfect Production System Under Warehouse Construction Cost.” International Journal of Production Economics 169: 203–214. doi: 10.1016/j.ijpe.2015.08.004
- Sekar, T., and R. Uthayakumar. 2018. “A Production Inventory Model for Single Vendor Single Buyer Integrated Demand with Multiple Production Setups and Rework.” Uncertain Supply Chain Management 6 (1): 75–90. doi: 10.5267/j.uscm.2017.6.001
- Taft, E. W. 1918. “The Most Economical Production lot.” Iron Age 101 (18): 1410–1412.
- Taleizadeh, A. A., L. E. Cárdenas-Barrón, and B. Mohammadi. 2014. “A Deterministic Multi Product Single Machine EPQ Model with Backordering, Scraped Products, Rework and Interruption in Manufacturing Process.” International Journal of Production Economics 150: 9–27. doi: 10.1016/j.ijpe.2013.11.023
- Taleizadeh, A. A., S. S. Kalantari, and L. E. Cárdenas-Barrón. 2016. “Pricing and Lot Sizing for an EPQ Inventory Model with Rework and Multiple Shipments.” Top 24 (1): 143–155. doi: 10.1007/s11750-015-0377-9
- Tayyab, M., and B. Sarkar. 2016. “Optimal Batch Quantity in a Cleaner Multi-Stage Lean Production System with Random Defective Rate.” Journal of Cleaner Production 139: 922–934. doi: 10.1016/j.jclepro.2016.08.062
- Wang, C. H. 2006. “Optimal Production and Maintenance Policy for Imperfect Production Systems.” Naval Research Logistics 53 (20): 151–156. doi: 10.1002/nav.20124
- Yu, J. C., H. M. Wee, and J. M. Chen. 2005. “Optimal Ordering Policy for a Deteriorating Item with Imperfect Quality and Partial Backordering.” Journal of the Chinese Institute of Industrial Engineers 22 (6): 509–520. doi: 10.1080/10170660509509319