1,280
Views
23
CrossRef citations to date
0
Altmetric
Articles

Methodology for integrated management system improvement: combining costs deployment and value stream mapping

, , &
Pages 3667-3685 | Received 24 Jul 2018, Accepted 14 Jun 2019, Published online: 27 Jun 2019

References

  • AFNOR. 2011. Guide, FD X50-819: Lignes directrices pour mettre en synergie Lean Management et ISO 9001 (AFNOR. 2011. Guide FD X50-819: Guidelines to synergize Lean Management and ISO 9001), www.afnor.org.
  • Agostino, D., and M. Arnaboldi. 2012. “Design Issues in Balanced Scorecards: The ‘What’ and ‘How’ of Control.” European Management Journal 30 (4): 327–339. doi: 10.1016/j.emj.2012.02.001
  • Alam, M., J. Dupras, and C. Messier. 2016. “A Framework Towards a Composite Indicator for Urban Ecosystem Services.” Ecological Indicators 60: 38–44. doi: 10.1016/j.ecolind.2015.05.035
  • Azma, F. 2010. “Qualitative Indicators for the Evaluation of Universities Performance.” Procedia - Social and Behavioral Sciences 2 (2): 5408–5411. doi: 10.1016/j.sbspro.2010.03.882
  • Bauler, T. 2012. “An Analytical Framework to Discuss the Usability of (Environmental) Indicators for Policy.” Ecological Indicators 17: 38–45. doi: 10.1016/j.ecolind.2011.05.013
  • Bellaïche, M. 2017. Manager vraiment par la qualité – Enjeux, méthodes et études de cas – Troisième édition révisée et mise à jour Ed. (Really Quality Manager – Issues, Methods and Case Studies – Third Revised Edition and Ed Update). AFNOR. ISBN: 978-2-12-465620-2.
  • Bonaccorsi, A., C. Daraio, B. Lepori, and S. Slipersæter. 2007. “Indicators on Individual Higher Education Institutions: Addressing Data Problems and Comparability Issues.” Research Evaluation 16 (2): 66–78. doi: 10.3152/095820207X218141
  • Cao, Y., K. Zhao, J. Yang, and W. Xiong. 2015. “Constructing the Integrated Strategic Performance Indicator System for Manufacturing Companies.” International Journal of Production Research 53 (13): 4102–4116. doi: 10.1080/00207543.2014.994715
  • Carmignani, G. 2017. “Scrap Value Stream Mapping (S-VSM): A New Approach to Improve the Supply Scrap Management Process.” International Journal of Production Research 55 (12): 3559–3576. doi: 10.1080/00207543.2017.1308574
  • Cortes, Hector, Joanna Daaboul, Julien Le Duigou, and Benoît Eynard. 2016. “Strategic Lean Management: Integration of Operational Performance Indicators for Strategic Lean Management.” IFAC-PapersOnLine 49 (12): 65–70. doi: 10.1016/j.ifacol.2016.07.551
  • Digalwar, A. K., and B. A. Metri. 2005. “Performance Measurement Framework for World Class Manufacturing.” International Journal of Applied Management & Technology 3 (2): 83–102.
  • Di Vaio, A., L. Varriale, and F. Alvino. 2018. “Key Performance Indicators for Developing Environmentally Sustainable and Energy Efficient Ports: Evidence from Italy.” Energy Policy 122: 229–240. doi: 10.1016/j.enpol.2018.07.046
  • Doran, G. T. 1981. “There’s a SMART Way to Write Management’s Goals and Objectives.” Management Review 70 (11): 35–36.
  • Dunk, Alan S. 2011. “Product Innovation, Budgetary Control, and the Financial Performance of Firms.” The British Accounting Review 43 (2): 102–111. doi: 10.1016/j.bar.2011.02.004
  • Gianni, M., K. Gotzamani, and G. Tsiotras. 2017. “Multiple Perspectives on Integrated Management Systems and Corporate Sustainability Performance.” Journal of Cleaner Production 168: 1297–1311. doi: 10.1016/j.jclepro.2017.09.061
  • Gopinath, G., and T. I. Freiheit. 2012. “A Waste Relationship Model and Center Point Tracking Metric for Lean Manufacturing Systems.” IIE Transactions 44 (2): 136–154. doi: 10.1080/0740817X.2011.593609
  • Gunaki, P., and N. Teli. 2015. “Productivity Improvement by Value Stream Mapping in Die Casting Industry.” Journal of Emerging Technologies and Innovative Research 2: 2049–2064.
  • Hermann, B. G., C. Kroeze, and W. Jawjit. 2007. “Assessing Environmental Performance by Combining Life Assessment, Multi-Criteria Analysis and Environmental Performance Indicators.” Journal of Cleaner Production 15 (18): 1787–1796. doi: 10.1016/j.jclepro.2006.04.004
  • Hutchins, D. 2008. Hoshin Kanri: The Strategic Approach to Continuous Improvement. Aldershot: Gower Publishing Limited.
  • International Organization for Standardization. 2013. Environmental Management Environmental Performance Evaluation – Guidelines.
  • Kaplan, R. S., and D. P. Norton. 2001. “Transforming the Balanced Scorecard from Performance Measurement to Strategic Management: Part 1.” Accounting Horizons 15: 87–104. doi: 10.2308/acch.2001.15.1.87
  • Kerzner, H. 2011. Project Management Metrics, KPIs, and Dashboards: A Guide to Measuring and Monitoring Project Performance. Hoboken, NJ: John Wiley & Sons.
  • Kimsey, D. B. 2010. “Lean Methodology in Health Care.” AORN Journal 92 (1): 53–60. doi: 10.1016/j.aorn.2010.01.015
  • Kodali, R. B., K. S. Sangwan, and V. K. Sunnapwar. 2004. “Performance Value Analysis for the Justification of World-Class Manufacturing Systems.” Journal of Advanced Manufacturing Systems 3 (1): 85–102. doi: 10.1142/S0219686704000417
  • Liker, J. K. 2004. The Toyota Way: 14 Management Principles from the World Greatest Manufacturers. New York: McGraw-Hill.
  • Lo-Iacono-Ferreira, V. G., S. F. Capuz-Rizo, and J. I. Torregrosa-López. 2018. “Key Performance Indicators to Optimize the Environmental Performance of Higher Education Institutions with Environmental Management System – A Case Study of Universitat Politècnica de València.” Journal of Cleaner Production 178: 846–865. doi: 10.1016/j.jclepro.2017.12.184
  • Low, S. P., and Y. P. Chin. 2003. “Integrating ISO 9001 and OHSAS 18001 for Construction.” Journal of Construction Engineering and Management 129 (3): 338–347. doi: 10.1061/(ASCE)0733-9364(2003)129:3(338)
  • Macinati, M. S., S. Bozzi, and M. G. Rizzo. 2016. “Budgetary Participation and Performance: The Mediating Effects of Medical Managers’ Job Engagement and Self-Efficacy.” Health Policy 120 (9): 1017–1028. doi: 10.1016/j.healthpol.2016.08.005
  • Maier, D., A. M. Vadastreanu, T. Keppler, T. Eidenmuller, and A. Maier. 2015. “Innovation as a Part of an Existing Integrated Management System, 4th World Conference on Business Economics and Management, WCBEM.” Procedia Economics and Finance 26: 1060–1067. doi: 10.1016/S2212-5671(15)00930-2
  • Mortaji, S. T. H., M. Bagherpour, and M. M. Mazdeh. 2013. “Fuzzy Time-Driven Activity-Based Costing.” Engineering Management Journal 25 (3): 63–73. doi: 10.1080/10429247.2013.11431983
  • Moumen, M., and H. El Aoufir. 2017. “Quality, Safety and Environment Management Systems (QES): Analysis of Empirical Studies on Integrated Management System (IMS).” Journal of Decision Systems 26 (3): 207–228. doi: 10.1080/12460125.2017.1305648
  • Murman, Earll, Thomas Allen, Kirkor Bozdogan, Joel Cutcher-Gershenfeld, Hugh McManus, Deborah Nightingale, Eric Rebentisch, et al. 2002. Lean Enterprise Value: Insights from MIT’s Lean Aerospace Initiative. New York: Palgrave. ISBN 978-1-4039-0750-9.
  • Nachiappan, R. M., and N. Anantharaman. 2006. “Performance Measurement of World Class Manufacturing System: An Overview.” The ICFAI Journal of Operations Management 21 (6): 29–53.
  • Nof, S. Y., J. Ceroni, W. Jeong, and M. Moghaddam. 2015. Revolutionizing Collaboration Through E-Work, E-Business and E-Service. Berlin: Springer-Verlag Berlin Heidelberg.
  • Nunhes, T. V., L. C. F. M. Barbosa, and O. J. Oliveira. 2017. “Identification and Analysis of the Elements and Functions Integrable in Integrated Management Systems.” Journal of Cleaner Production 142: 3225–3235. doi: 10.1016/j.jclepro.2016.10.147
  • Ohno, T. 1988. Toyota Production System: Beyond Large-Scale Production. Portland: Productivity Press.
  • Oliveira, J., J. C. Sá, and A. Fernandes. 2017. “Continuous Improvement Through ‘Lean Tools’: An Application in a Mechanical Company.” Procedia Manufacturing 13: 1082–1089. doi: 10.1016/j.promfg.2017.09.139
  • Pakdil, F., and K. M. Leonard. 2014. “Criteria for a Lean Organisation: Development of a Lean Assessment Tool.” International Journal of Production Research 52 (15): 4587–4607. doi: 10.1080/00207543.2013.879614
  • Parmenter, D. 2015. Key Performance Indicators: Developing, Implementing, and Using Winning KPIs. Hoboken, NJ: John Wiley & Sons.
  • Peral, J., A. Mate, and M. Marco. 2017. “Application of Data Mining Techniques to Identify Relevant Key Performance Indicators.” Journal of Computer Standards & Interfaces 50: 55–64. doi: 10.1016/j.csi.2016.09.009
  • Poksinska, B., J. A. Eklund, and J. J. Dahlgaard. 2006. “ISO 9001: 2000 in Small Organisations: Lost Opportunities, Benefits and Influencing Factors.” International Journal of Quality & Reliability Management 23 (5): 490–512. doi: 10.1108/02656710610664578
  • Priede, J. 2012. “Implementation of Quality Management System ISO 9001 in the World and Its Strategic Necessity.” Procedia - Social and Behavioral Sciences 58: 1466–1475. doi: 10.1016/j.sbspro.2012.09.1133
  • Pun, K. F., and I. K. Hui. 2002. “Integrating the Safety Dimension into Quality Management Systems: A Process Model.” Total Quality Management 13: 373–391. doi: 10.1080/09544120220135246
  • Romero, L. F., and A. Arce. 2017. “Applying Value Stream Mapping in Manufacturing: A Systematic Literature Review.” IFAC-PapersOnLine 50 (1): 1075–1086. doi: 10.1016/j.ifacol.2017.08.385
  • Rother, M., and R. Harris. 2001. Creating Continuous Flow. 1st ed. Cambridge, MA: Lean Enterprise Institute.
  • Rother, M., and J. Shook. 1999. Learning to See: Value Stream Mapping to Add Value and Eliminate Muda. 2nd ed. Brookline, MA: The Lean Enterprise Institute.
  • Senderská, K., A. Mareš, and Š Václav. 2017. “Spaghetti Diagram Application for Workers’ Movement Analysis.” UPB Scientific Bulletin, Series D 79 (1): 139–150.
  • Silva, L., J. Kovaleski, S. Gaia, M. Garcia, and P. Júnior. 2013. “Cost Deployment Tool for Technological Innovation of World Class Manufacturing.” Journal of Transportation Technologies 3 (1): 17–23. doi: 10.4236/jtts.2013.31002
  • Smalley, A. 2009. Creating Level Pull. 1st ed. Cambridge, MA: Lean Enterprise Institute.
  • Stadnicka, D., and K. Antosz. 2018. “Overall Equipment Effectiveness: Analysis of Different Ways of Calculations and Improvements.” In Advances in Manufacturing. Lecture Notes in Mechanical Engineering, edited by A. Hamrol, O. Ciszak, S. Legutko, and M. Jurczyk, 45–55. Cham: Springer.
  • Stadnicka, D., R. M. C. Ratnayake, and K. Antosz. 2015. “Investigation of Process Approach Implementation in Manufacturing Firms: A Methodology for Assessing Process Excellence Level.” Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 159–164.
  • Sunk, A., P. Kuhlang, T. Edtmayr, and W. Sihn. 2016. “Developments of Traditional Value Stream Mapping to Enhance Personal and Organizational System and Methods Competencies.” International Journal of Production Research 55 (13): 3732–3746. doi: 10.1080/00207543.2016.1272764
  • Womack, J. P., and D. T. Jones. 2005. “Lean Consumption.” Harvard Business Review 83 (3): 58–68.
  • Womack, J. P, D. T. Jones, and G. Beauvallet. 2012. Système Lean: Penser l’entreprise a plus juste (Lean System: Thinking the Business at the Right). 2éme éd. Paris: Pearson Education. ISBN13: 978-2-7440-6555-
  • Yamashina, H., and T. Kubo. 2002. “Manufacturing Cost Deployment.” International Journal of Production Research 40 (16): 4077–4091. doi: 10.1080/00207540210157178
  • Yamashina, H., T. Kubo, and K. Okazaki. 1999. “Manufacturing Cost Deployment.” Journal of the Japan Society for Precision Engineering 65 (2): 260–266. doi: 10.2493/jjspe.65.260
  • Zaman, A. U. 2014. “Identification of Key Assessment Indicators of the Zero Waste Management Systems.” Ecological Indicators 36: 682–693. doi: 10.1016/j.ecolind.2013.09.024
  • Zeng, S. X., X. M. Xie, C. M. Tam, and L. Y. Shen. 2011. “An Empirical Examination of Benefits from Implementing Integrated Management Systems (IMS).” Total Quality Management and Business Excellence 22 (2): 173–186. doi: 10.1080/14783363.2010.530797

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.