942
Views
26
CrossRef citations to date
0
Altmetric
Articles

Cloud manufacturing service composition and optimal selection with sustainability considerations: a multi-objective integer bi-level multi-follower programming approach

, &
Pages 6024-6042 | Received 18 Mar 2019, Accepted 02 Sep 2019, Published online: 16 Sep 2019

  • Ahn, G., Y. J. Park, and S. Hur. 2019. “Performance Computation Methods for Composition of Tasks with Multiple Patterns in Cloud Manufacturing.” International Journal of Production Research 57 (2): 517–530.
  • Alipour, M., K. Zare, and H. Seyedi. 2018. “A Multi-Follower Bilevel Stochastic Programming Approach for Energy Management of Combined Heat and Power Micro-Grids.” Energy 149: 135–146.
  • Amrina, E., and S. M. Yusof. 2011. “Key Performance Indicators for Sustainable Manufacturing Evaluation in Automotive Companies.” In 2011 IEEE International Conference on Industrial Engineering and Engineering Management, 1093–1097. Singapore: IEEE.
  • Ansari, E., and H. Zhiani Rezai. 2011. “Solving Multi-Objective Linear Bilevel Multi-Follower Programming Problem.” International Journal of Industrial Mathematics 3 (4): 303–316.
  • Benjaafar, S., Y. Li, and M. Daskin. 2013. “Carbon Footprint and the Management of Supply Chains: Insights from Simple Models.” IEEE Transactions on Automation Science and Engineering 10 (1): 99–116.
  • Cao, Y., S. Wang, L. Kang, and Y. Gao. 2016. “A TQCS-Based Service Selection and Scheduling Strategy in Cloud Manufacturing.” The International Journal of Advanced Manufacturing Technology 82: 235–251.
  • Chen, J., G. Q. Huang, J. Q. Wang, and C. Yang. 2019. “A Cooperative Approach to Service Booking and Scheduling in Cloud Manufacturing.” European Journal of Operational Research 273 (3): 861–873.
  • Chen, L., J. Olhager, and O. Tang. 2014. “Manufacturing Facility Location and Sustainability: A Literature Review and Research Agenda.” International Journal of Production Economics 149: 154–163.
  • Coello, C. A. C., G. B. Lamont, and D. A. Van Veldhuizen. 2007. Evolutionary Algorithms for Solving Multi-Objective Problems. New York: Springer.
  • Deb, K., A. Pratap, S. Agarwal, and T. A. M. T. Meyarivan. 2002. “A Fast and Elitist Multiobjective Genetic Algorithm: NSGA-II.” IEEE Transactions on Evolutionary Computation 6 (2): 182–197.
  • Devanathan, S., D. Ramanujan, W. Z. Bernstein, F. Zhao, and K. Ramani. 2010. “Integration of Sustainability into Early Design Through the Function Impact Matrix.” Journal of Mechanical Design 132 (8): 081004.
  • Du, J., X. Li, L. Yu, R. Dan, and J. Zhou. 2017. “Multi-Depot Vehicle Routing Problem for Hazardous Materials Transportation: A Fuzzy Bilevel Programming.” Information Sciences 399: 201–218.
  • EIA. 2013. International Energy Outlook 2013 (Online). www.eia.gov/forecasts/ieo/pdf/0484(2013).pdf.
  • ESDNBS (Energy Statistics Division of National Bureau of Statistics). 2013. China Energy Statistical Yearbook 2013. Beijing: China Statistics Press.
  • Esmaeilian, B., S. Behdad, and B. Wang. 2016. “The Evolution and Future of Manufacturing: A Review.” Journal of Manufacturing Systems 39: 79–100.
  • Haapala, K. R., F. Zhao, J. Camelio, J. W. Sutherland, S. J. Skerlos, D. A. Dornfeld, et al. 2013. “A Review of Engineering Research in Sustainable Manufacturing.” Journal of Manufacturing Science and Engineering 135 (4): 041013.
  • Herrmann, C., C. Schmidt, D. Kurle, S. Blume, and S. Thiede. 2014. “Sustainability in Manufacturing and Factories of the Future.” International Journal of Precision Engineering and Manufacturing-Green Technology 1 (4): 283–292.
  • Huang, X., B. Du, L. Sun, F. Chen, and W. Dai. 2016. “Service Requirement Conflict Resolution Based on Ant Colony Optimization in Group-Enterprises-Oriented Cloud Manufacturing.” The International Journal of Advanced Manufacturing Technology 84 (1-4): 183–196.
  • Jiang, H., J. Yi, S. Chen, and X. Zhu. 2016. “A Multi-Objective Algorithm for Task Scheduling and Resource Allocation in Cloud-Based Disassembly.” Journal of Manufacturing Systems 41: 239–255.
  • Ke, H., H. Huang, D. A. Ralescu, and L. Wang. 2016. “Fuzzy Bilevel Programming with Multiple Non-Cooperative Followers: Model, Algorithm and Application.” International Journal of General Systems 45 (3): 336–351.
  • Lartigau, J., X. Xu, L. Nie, and D. Zhan. 2015. “Cloud Manufacturing Service Composition Based on QoS with Geo-Perspective Transportation Using an Improved Artificial Bee Colony Optimisation Algorithm.” International Journal of Production Research 53 (14): 4380–4404.
  • Li, H., K. C. Chan, M. Liang, and X. Luo. 2016. “Composition of Resource-Service Chain for Cloud Manufacturing.” IEEE Transactions on Industrial Informatics 12 (1): 211–219.
  • Li, F., T. W. Liao, and L. Zhang. 2019. “Two-level Multi-Task Scheduling in a Cloud Manufacturing Environment.” Robotics and Computer-Integrated Manufacturing 56: 127–139.
  • Li, H., Y. Lu, J. Zhang, and T. Wang. 2013. “Trends in Road Freight Transportation Carbon Dioxide Emissions and Policies in China.” Energy Policy 57 (3): 99–106.
  • Li, F., L. Zhang, T. W. Liao, and Y. Liu. 2018. “Multi-Objective Optimisation of Multi-Task Scheduling in Cloud Manufacturing.” International Journal of Production Research, 1–17. doi:10.1080/00207543.2018.1538579.
  • Li, B. H., L. Zhang, S. L. Wang, F. Tao, J. W. Cao, X. D. Jiang, X. Song, and X. D. Chai. 2010. “Cloud Manufacturing: A New Service-Oriented Networked Manufacturing Model.” Computer Integrated Manufacturing Systems 16 (1): 1–16.
  • Lin, Y. K., and C. S. Chong. 2017. “Fast GA-Based Project Scheduling for Computing Resources Allocation in a Cloud Manufacturing System.” Journal of Intelligent Manufacturing 28 (5): 1189–1201.
  • Liu, Y., L. Wang, X. V. Wang, X. Xu, and L. Zhang. 2018. “Scheduling in Cloud Manufacturing: State-of-the-Art and Research Challenges.” International Journal of Production Research, 1–26. doi:10.1080/00207543.2018.1449978.
  • Lu, Y., X. Xu, and J. Xu. 2014. “Development of a Hybrid Manufacturing Cloud.” Journal of Manufacturing Systems 33 (4): 551–566.
  • Ratnaweera, A., S. K. Halgamuge, and H. C. Watson. 2004. “Self-Organizing Hierarchical Particle Swarm Optimizer with Time-Varying Acceleration Coefficients.” IEEE Transactions on Evolutionary Computation 8 (3): 240–255.
  • Sankararao, B., and C. K. Yoo. 2011. “Development of a Robust Multiobjective Simulated Annealing Algorithm for Solving Multiobjective Optimization Problems.” Industrial & Engineering Chemistry Research 50 (11): 6728–6742.
  • Shapira, P., J. Youtie, K. Yogeesvaran, and Z. Jaafar. 2006. “Knowledge Economy Measurement: Methods, Results and Insights from the Malaysian Knowledge Content Study.” Research Policy 35 (10): 1522–1537.
  • Su, K. K., W. S. Xu, and J. Y. Li. 2015. “Manufacturing Resource Allocation Method Based on Bi-Level Programming in Cloud Manufacturing.” Computer Integrated Manufacturing Systems 21 (7): 1941–1952.
  • Sundarakani, B., R. D. Souza, M. Goh, S. M. Wagner, and S. Manikandan. 2010. “Modeling Carbon Footprints Across the Supply Chain.” International Journal of Production Economics 128 (1): 43–50.
  • Tao, F., D. Zhao, Y. Hu, and Z. Zhou. 2008. “Resource Service Composition and Its Optimal-Selection Based on Particle Swarm Optimization in Manufacturing Grid System.” IEEE Transactions on Industrial Informatics 4 (4): 315–327.
  • Tao, F., D. Zhao, H. Yefa, and Z. Zhou. 2010. “Correlation-Aware Resource Service Composition and Optimal-Selection in Manufacturing Grid.” European Journal of Operational Research 201 (1): 129–143.
  • Tripathi, P. K., S. Bandyopadhyay, and S. K. Pal. 2007. “Multi-Objective Particle Swarm Optimization with Time Variant Inertia and Acceleration Coefficients.” Information Sciences 177 (22): 5033–5049.
  • Veleva, V., and M. Ellenbecker. 2001. “Indicators of Sustainable Production: Framework and Methodology.” Journal of Cleaner Production 9 (6): 519–549.
  • Von Stackelberg, H. 1952. The Theory of the Market Economy. Oxford: Oxford University Press.
  • Wang, Q., D. Tang, L. Yin, M. A. Salido, A. Giret, and Y. Xu. 2016a. “Bi-Objective Optimization for Low-Carbon Product Family Design.” Robotics and Computer-Integrated Manufacturing 41: 53–65.
  • Wang, S. L., Z. Q. Zhu, and L. Kang. 2016b. “Resource Allocation Model in Cloud Manufacturing.” Proceedings of the Institution of Mechanical Engineers, Part C: Journal of Mechanical Engineering Science 230 (10): 1726–1741. doi:10.1177/0954406215582016.
  • Wu, X., X. Jiang, W. Xu, Q. Ai, and Q. Liu. 2015. “A Unified Sustainable Manufacturing Capability Model for Representing Industrial Robot Systems in Cloud Manufacturing.” Paper Presented at the IFIP International Conference on Advances in Production Management Systems, Tokyo, Japan, September 7–9.
  • Xiang, F., Y. Hu, Y. Yu, and H. Wu. 2014. “QoS and Energy Consumption Aware Service Composition and Optimal-Selection Based on Pareto Group Leader Algorithm in Cloud Manufacturing System.” Central European Journal of Operations Research 22 (4): 663–685.
  • Xiang, F., G. Z. Jiang, L. L. Xu, and N. X. Wang. 2016. “The Case-Library Method for Service Composition and Optimal Selection of Big Manufacturing Data in Cloud Manufacturing System.” The International Journal of Advanced Manufacturing Technology 84 (1–4): 59–70.
  • Xiao, W., G. Du, Y. Zhang, and X. Liu. 2018. “Coordinated Optimization of Low-Carbon Product Family and Its Manufacturing Process Design by a Bilevel Game-Theoretic Model.” Journal of Cleaner Production 184: 754–773.
  • Xu, X. 2012. “From Cloud Computing to Cloud Manufacturing.” Robotics and Computer-Integrated Manufacturing 28 (1): 75–86.
  • Xu, W., L. Shao, B. Yao, Z. Zhou, and D. T. Pham. 2016. “Perception Data-Driven Optimization of Manufacturing Equipment Service Scheduling in Sustainable Manufacturing.” Journal of Manufacturing Systems 41: 86–101.
  • Xue, X., Z. Z. Liu, and S. F. Wang. 2016. “Manufacturing Service Composition for the Mass Customised Production.” International Journal of Computer Integrated Manufacturing 29 (2): 119–135.
  • Yang, X., G. Shi, and Z. Zhang. 2014. “Collaboration of Large Equipment Complete Service under Cloud Manufacturing Mode.” International Journal of Production Research 52 (2): 326–336.
  • Zhang, Y., G. Zhang, T. Qu, Y. Liu, and R. Y. Zhong. 2017. “Analytical Target Cascading for Optimal Configuration of Cloud Manufacturing Services.” Journal of Cleaner Production 151: 330–343.
  • Zhao, Y., Q. Liu, W. Xu, X. Wu, X. Jiang, Z. Zhou, and D. T. Pham. 2017. “Dynamic and Unified Modelling of Sustainable Manufacturing Capability for Industrial Robots in Cloud Manufacturing.” The International Journal of Advanced Manufacturing Technology 93 (5-8): 2753–2771.
  • Zhou, J., and X. Yao. 2017. “A Hybrid Approach Combining Modified Artificial Bee Colony and Cuckoo Search Algorithms for Multi-Objective Cloud Manufacturing Service Composition.” International Journal of Production Research 55 (16): 4765–4784.
  • Zhou, L., L. Zhang, Y. Laili, C. Zhao, and Y. Xiao. 2018a. “Multi-Task Scheduling of Distributed 3D Printing Services in Cloud Manufacturing.” The International Journal of Advanced Manufacturing Technology 96 (9-12): 3003–3017.
  • Zhou, L., L. Zhang, C. Zhao, Y. Laili, and L. Xu. 2018b. “Diverse Task Scheduling for Individualized Requirements in Cloud Manufacturing.” Enterprise Information Systems 12 (3): 300–318.
  • Zitzler, E., K. Deb, and L. Thiele. 2000. “Comparison of Multi-Objective Evolutionary Algorithms: Empirical Results.” Evolutionary Computation 8 (2): 173–195.
  • Zuo, Y., F. Tao, and A. Y. C. Nee. 2018. “An Internet of Things and Cloud-Based Approach for Energy Consumption Evaluation and Analysis for a Product.” International Journal of Computer Integrated Manufacturing 31 (4-5): 337–348.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.