- Bal, A., and S. I. Satoglu. 2018. “A Goal Programming Model for Sustainable Reverse Logistics Operations Planning and an Application.” Journal of Cleaner Production 201: 1081–1091.
- Berrichi, A., F. Yalaoui, L. Amodeo, and M. Mezghiche. 2010. “Bi-objective ant Colony Optimization Approach to Optimize Production and Maintenance Scheduling.” Computers & Operations Research 37 (9): 1584–1596.
- Cevikcan, E., and M. B. Durmusoglu. 2011. “Minimising Utility Work and Utility Worker Transfers for a Mixed-model Assembly Line.” International Journal of Production Research 49 (24): 7293–7314.
- Cevikcan, E., M. B. Durmusoglu, and M. Baskak. 2011. “Integrating Parts Design Characteristics and Scheduling on Parallel Machines.” Expert Systems with Applications 38 (10): 13232–13253.
- Daniels, R. L., B. J. Hoopes, and J. B. Mazzola. 1996. “Scheduling Parallel Manufacturing Cells with Resource Flexibility.” Management Science 42 (9): 1260–1276.
- Deb, K., A. Pratap, S. Agarwal, and T. A. M. T. Meyarivan. 2002. “A Fast and Elitist Multiobjective Genetic Algorithm: NSGA-II.” IEEE Transactions on Evolutionary Computation 6 (2): 182–197.
- Durmusoglu, M. B., E. Cevikcan, and S. I. Satoglu. 2017. “The Progress of Assembly Cell Design from a Conventional Assembly System to a Walking Worker Assembly Cell.” In Cellular Manufacturing Systems: Recent Developments, Analysis and Case Studies, edited by Gürsel A. Süer and Mitsuo Gen, 327–343. New York: Nova Science.
- Hamacher, H. W., C. R. Pedersen, and S. Ruzika. 2007. “Finding Representative Systems for Discrete Bicriterion Optimization Problems.” Operations Research Letters 35 (3): 336–344.
- Han, Y. Y., D. W. Gong, X. Y. Sun, and Q. K. Pan. 2014. “An Improved NSGA-II Algorithm for Multi-objective Lot-streaming Flow Shop Scheduling Problem.” International Journal of Production Research 52 (8): 2211–2231.
- Han, X., Z. Zhang, and Y. Yin. 2018. “Reliability Analysis for a Divisional Seru Production System with Stochastic Capacity.” In 2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 710–714. IEEE.
- Hopp, W. J., E. Tekin, and M. P. Van Oyen. 2004. “Benefits of Skill Chaining in Serial Production Lines with Cross-trained Workers.” Management Science 50 (1): 83–98.
- Ishibuchi, H., T. Yoshida, and T. Murata. 2003. “Balance Between Genetic Search and Local Search in Memetic Algorithms for Multiobjective Permutation Flowshop Scheduling.” IEEE Transactions on Evolutionary Computation 7 (2): 204–223.
- Kaku, I., J. Gong, J. Tang, and Y. Yin. 2008. “A Mathematical Model for Converting Conveyor Assembly Line to Cellular Manufacturing.” Industrial Engineering & Management Systems 7 (2): 160–170.
- Kaku, I., J. Gong, J. Tang, and Y. Yin. 2009. “Modeling and Numerical Analysis of Line-cell Conversion Problems.” International Journal of Production Research 47 (8): 2055–2078.
- Karp, R. M. 1972. “Reducibility among Combinatorial Problems.” In Complexity of Computer Computations, 85–103. Boston, MA: Springer.
- Kolisch, R. 1996. “Serial and Parallel Resource-constrained Project Scheduling Methods Revisited: Theory and Computation.” European Journal of Operational Research 90 (2): 320–333.
- Kulturel-Konak, S., A. Konak, and D. W. Coit. 2007. “Multiobjective Metaheuristic Approaches to Reliability Optimization.” In Computational Intelligence in Reliability Engineering, 37–62. Berlin, Heidelberg: Springer.
- Lian, J., C. Liu, W. Li, and Y. Yin. 2018. “A Multi-skilled Worker Assignment Problem in Seru Production Systems Considering the Worker Heterogeneity.” Computers & Industrial Engineering 118: 366–382.
- Liu, C., F. Dang, W. Li, J. Lian, S. Evans, and Y. Yin. 2015. “Production Planning of Multi-stage Multi-option Seru Production Systems with Sustainable Measures.” Journal of Cleaner Production 105: 285–299.
- Liu, C., W. Li, J. Lian, and Y. Yin. 2012. “Reconfiguration of Assembly Systems: From Conveyor Assembly Line to Serus.” Journal of Manufacturing Systems 31 (3): 312–325.
- Liu, C., N. Yang, W. Li, J. Lian, S. Evans, and Y. Yin. 2013. “Training and Assignment of Multi-skilled Workers for Implementing Seru Production Systems.” The International Journal of Advanced Manufacturing Technology 69 (5–8): 937–959.
- Luo, L., Z. Zhang, and Y. Yin. 2016. “Seru Loading with Worker-operation Assignment in Single Period.” In Industrial Engineering and Engineering Management (IEEM), 2016 IEEE International Conference on, 1055–1058. IEEE.
- Mavrotas, G. 2009. “Effective Implementation of the ε-Constraint Method in Multi-objective Mathematical Programming Problems.” Applied Mathematics and Computation 213 (2): 455–465.
- Mavrotas, G., and K. Florios. 2013. “An Improved Version of the Augmented ε-Constraint Method (AUGMECON2) for Finding the Exact Pareto Set in Multi-objective Integer Programming Problems.” Applied Mathematics and Computation 219 (18): 9652–9669.
- Pires, D. F., C. H. Antunes, and A. G. Martins. 2012. “NSGA-II with Local Search for a Multi-objective Reactive Power Compensation Problem.” International Journal of Electrical Power & Energy Systems 43 (1): 313–324.
- Ramesh, S., S. Kannan, and S. Baskar. 2012. “Application of Modified NSGA-II Algorithm to Multi-objective Reactive Power Planning.” Applied Soft Computing 12 (2): 741–753.
- Rasmi, S. A. B., and M. Türkay. 2019. “GoNDEF: An Exact Method to Generate All Non-dominated Points of Multi-objective Mixed-integer Linear Programs.” Optimization and Engineering 20 (1): 89–117.
- Sakazume, Y. 2005. “Is Japanese Cell Manufacturing a New System?: A Comparative Study Between Japanese Cell Manufacturing and Cellular Manufacturing.” Journal of Japan Industrial Management Association 55 (6): 341–349.
- Schmenner, R. W., and M. L. Swink. 1998. “On Theory in Operations Management.” Journal of Operations Management 17 (1): 97–113.
- Shahidi-Zadeh, B., R. Tavakkoli-Moghaddam, A. Taheri-Moghadam, and I. Rastgar. 2017. “Solving a Bi-objective Unrelated Parallel Batch Processing Machines Scheduling Problem: A Comparison Study.” Computers & Operations Research 88: 71–90.
- Shao, L., Z. Zhang, and Y. Yin. 2016. “A Bi-objective Combination Optimisation Model for Line-seru Conversion Based on Queuing Theory.” International Journal of Manufacturing Research 11 (4): 322–338.
- Shao, L., Z. Zhang, and Y. Yin. 2017. “Production System Performance Improvement by Assembly Line-seru Conversion.” In Proceedings of the Tenth International Conference on Management Science and Engineering Management, 1165–1180. Singapore: Springer.
- Stecke, K. E., Y. Yin, and I. Kaku. 2014. “Seru Production: An Extension of Just-in-Time Approach for Volatile Business Environments.” In Analytical Approaches to Strategic Decision-making: Interdisciplinary Considerations, 45–58. Hershey, PA: IGI Global.
- Stecke, K. E., Y. Yin, I. Kaku, and Y. Murase. 2012. “Seru: the Organizational Extension of JIT for a Super-talent Factory.” International Journal of Strategic Decision Sciences 3 (1): 106–119.
- Sun, W., Q. Li, C. Huo, Y. Yu, and K. Ma. 2016. “Formulations, Features of Solution Space, and Algorithms for Line-pure Seru System Conversion.” Mathematical Problems in Engineering 2016: 1–14.
- Sun, W., Y. Wu, Q. Lou, and Y. Yu. 2019. “A Cooperative Coevolution Algorithm for the Seru Production with Minimizing Makespan.” IEEE Access 7: 5662–5670.
- Villa, A., and T. Taurino. 2013. “From JIT to Seru, for a Production as Lean as Possible.” Procedia Engineering 63: 956–965.
- Wang, S., and M. Liu. 2015. “Multi-objective Optimization of Parallel Machine Scheduling Integrated with Multi-resources Preventive Maintenance Planning.” Journal of Manufacturing Systems 37: 182–192.
- Wang, Y., and J. Tang. 2017. “Multi-objective Optimization Model for Seru Production System Formation Under Uncertain Condition.” In Service Systems and Service Management (ICSSSM), 2017 International Conference, 1–6. IEEE.
- Wang, Y., and J. Tang. 2018. “Cost and Service-level-Based Model for a Seru Production System Formation Problem with Uncertain Demand.” Journal of Systems Science and Systems Engineering 27 (4): 519–537.
- Wang, P. S., T. Yang, and M. C. Chang. 2017. “Effective Layout Designs for the Shojinka Control Problem for a TFT-LCD Module Assembly Line.” Journal of Manufacturing Systems 44: 255–269.
- Wu, L., F. T. Chan, B. Niu, and L. Li. 2018. “Cross-trained Worker Assignment and Comparative Analysis on Throughput of Divisional and Rotating Seru.” Industrial Management & Data Systems 118 (5): 1114–1136.
- Ye, W., and T. Jiafu. 2018. “Is Full Skill the Best Configuration for Seru Production System?” In 2018 Chinese Control and Decision Conference (CCDC), 3904–3909. IEEE.
- Yin, Y., I. Kaku, and K. E. Stecke. 2008. The Evolution of Seru Production Systems Throughout Canon. Vol. 14. NeilsonJournals Publishing.
- Yin, Y., K. E. Stecke, and D. Li. 2018. “The Evolution of Production Systems From Industry 2.0 Through Industry 4.0.” International Journal of Production Research 56 (1–2): 848–861. Edinburgh.
- Yin, Y., K. E. Stecke, M. Swink, and I. Kaku. 2017. “Lessons From Seru Production on Manufacturing Competitively in a High Cost Environment.” Journal of Operations Management 49–51: 67–76.
- Ying, K. C., and Y. J. Tsai. 2017. “Minimising Total Cost for Training and Assigning Multiskilled Workers in Seru Production Systems.” International Journal of Production Research 55 (10): 2978–2989.
- Yılmaz, Ö. F. 2019. “Operational Strategies for Seru Production System: A Bi-objective Problem and Solution Methods (Dataset).” GitHub-omerfarukktu Repository. https://github.com/omerfarukktu/DATASET.
- Yılmaz, Ö. F., and M. B. Durmuşoğlu. 2018a. “Evolutionary Algorithms for Multi-objective Scheduling in a Hybrid Manufacturing System.” In Handbook of Research on Applied Optimization Methodologies in Manufacturing Systems, 162–187. Hershey, PA: IGI Global.
- Yilmaz, O. F., and M. B. Durmusoglu. 2018b. “A Performance Comparison and Evaluation of Metaheuristics for a Batch Scheduling Problem in a Multi-hybrid Cell Manufacturing System with Skilled Workforce Assignment.” Journal of Industrial & Management Optimization, 143–157.
- Yu, Y., J. Gong, J. Tang, Y. Yin, and I. Kaku. 2012. “How to Carry out Assembly Line–Cell Conversion? A Discussion Based on Factor Analysis of System Performance Improvements.” International Journal of Production Research 50 (18): 5259–5280.
- Yu, Y., W. Sun, J. Tang, I. Kaku, and J. Wang. 2017. “Line-seru Conversion Towards Reducing Worker (s) Without Increasing Makespan: Models, Exact and Meta-heuristic Solutions.” International Journal of Production Research 55 (10): 2990–3007.
- Yu, Y., W. Sun, J. Tang, and J. Wang. 2017. “Line-hybrid Seru System Conversion: Models, Complexities, Properties, Solutions and Insights.” Computers & Industrial Engineering 103: 282–299.
- Yu, Y., J. Tang, J. Gong, Y. Yin, and I. Kaku. 2014. “Mathematical Analysis and Solutions for Multi-objective Line-cell Conversion Problem.” European Journal of Operational Research 236 (2): 774–786.
- Yu, Y., J. Tang, W. Sun, Y. Yin, and I. Kaku. 2013a. “Combining Local Search Into Non-dominated Sorting for Multi-objective Line-cell Conversion Problem.” International Journal of Computer Integrated Manufacturing 26 (4): 316–326.
- Yu, Y., J. Tang, W. Sun, Y. Yin, and I. Kaku. 2013b. “Reducing Worker (s) by Converting Assembly Line Into a Pure Cell System.” International Journal of Production Economics 145 (2): 799–806.
- Yu, Y., J. Wang, K. Ma, and W. Sun. 2018. “Seru System Balancing: Definition, Formulation, and Exact Solution.” Computers & Industrial Engineering 122: 318–325.
- Yu, Y., S. Wang, J. Tang, I. Kaku, and W. Sun. 2016. “Complexity of Line-seru Conversion for Different Scheduling Rules and Two Improved Exact Algorithms for the Multi-objective Optimization.” SpringerPlus 5 (1): 809.
- Zhang, X., C. Liu, W. Li, S. Evans, and Y. Yin. 2017. “Effects of Key Enabling Technologies for Seru Production on Sustainable Performance.” Omega 66: 290–307.
Operational strategies for seru production system: a bi-objective optimisation model and solution methods
Reprints and Corporate Permissions
Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?
To request a reprint or corporate permissions for this article, please click on the relevant link below:
Academic Permissions
Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?
Obtain permissions instantly via Rightslink by clicking on the button below:
If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.
Related research
People also read lists articles that other readers of this article have read.
Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.
Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.