1,091
Views
38
CrossRef citations to date
0
Altmetric
Articles

Operational strategies for seru production system: a bi-objective optimisation model and solution methods

ORCID Icon
Pages 3195-3219 | Received 31 May 2019, Accepted 12 Sep 2019, Published online: 26 Sep 2019

  • Bal, A., and S. I. Satoglu. 2018. “A Goal Programming Model for Sustainable Reverse Logistics Operations Planning and an Application.” Journal of Cleaner Production 201: 1081–1091.
  • Berrichi, A., F. Yalaoui, L. Amodeo, and M. Mezghiche. 2010. “Bi-objective ant Colony Optimization Approach to Optimize Production and Maintenance Scheduling.” Computers & Operations Research 37 (9): 1584–1596.
  • Cevikcan, E., and M. B. Durmusoglu. 2011. “Minimising Utility Work and Utility Worker Transfers for a Mixed-model Assembly Line.” International Journal of Production Research 49 (24): 7293–7314.
  • Cevikcan, E., M. B. Durmusoglu, and M. Baskak. 2011. “Integrating Parts Design Characteristics and Scheduling on Parallel Machines.” Expert Systems with Applications 38 (10): 13232–13253.
  • Daniels, R. L., B. J. Hoopes, and J. B. Mazzola. 1996. “Scheduling Parallel Manufacturing Cells with Resource Flexibility.” Management Science 42 (9): 1260–1276.
  • Deb, K., A. Pratap, S. Agarwal, and T. A. M. T. Meyarivan. 2002. “A Fast and Elitist Multiobjective Genetic Algorithm: NSGA-II.” IEEE Transactions on Evolutionary Computation 6 (2): 182–197.
  • Durmusoglu, M. B., E. Cevikcan, and S. I. Satoglu. 2017. “The Progress of Assembly Cell Design from a Conventional Assembly System to a Walking Worker Assembly Cell.” In Cellular Manufacturing Systems: Recent Developments, Analysis and Case Studies, edited by Gürsel A. Süer and Mitsuo Gen, 327–343. New York: Nova Science.
  • Hamacher, H. W., C. R. Pedersen, and S. Ruzika. 2007. “Finding Representative Systems for Discrete Bicriterion Optimization Problems.” Operations Research Letters 35 (3): 336–344.
  • Han, Y. Y., D. W. Gong, X. Y. Sun, and Q. K. Pan. 2014. “An Improved NSGA-II Algorithm for Multi-objective Lot-streaming Flow Shop Scheduling Problem.” International Journal of Production Research 52 (8): 2211–2231.
  • Han, X., Z. Zhang, and Y. Yin. 2018. “Reliability Analysis for a Divisional Seru Production System with Stochastic Capacity.” In 2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 710–714. IEEE.
  • Hopp, W. J., E. Tekin, and M. P. Van Oyen. 2004. “Benefits of Skill Chaining in Serial Production Lines with Cross-trained Workers.” Management Science 50 (1): 83–98.
  • Ishibuchi, H., T. Yoshida, and T. Murata. 2003. “Balance Between Genetic Search and Local Search in Memetic Algorithms for Multiobjective Permutation Flowshop Scheduling.” IEEE Transactions on Evolutionary Computation 7 (2): 204–223.
  • Kaku, I., J. Gong, J. Tang, and Y. Yin. 2008. “A Mathematical Model for Converting Conveyor Assembly Line to Cellular Manufacturing.” Industrial Engineering & Management Systems 7 (2): 160–170.
  • Kaku, I., J. Gong, J. Tang, and Y. Yin. 2009. “Modeling and Numerical Analysis of Line-cell Conversion Problems.” International Journal of Production Research 47 (8): 2055–2078.
  • Karp, R. M. 1972. “Reducibility among Combinatorial Problems.” In Complexity of Computer Computations, 85–103. Boston, MA: Springer.
  • Kolisch, R. 1996. “Serial and Parallel Resource-constrained Project Scheduling Methods Revisited: Theory and Computation.” European Journal of Operational Research 90 (2): 320–333.
  • Kulturel-Konak, S., A. Konak, and D. W. Coit. 2007. “Multiobjective Metaheuristic Approaches to Reliability Optimization.” In Computational Intelligence in Reliability Engineering, 37–62. Berlin, Heidelberg: Springer.
  • Lian, J., C. Liu, W. Li, and Y. Yin. 2018. “A Multi-skilled Worker Assignment Problem in Seru Production Systems Considering the Worker Heterogeneity.” Computers & Industrial Engineering 118: 366–382.
  • Liu, C., F. Dang, W. Li, J. Lian, S. Evans, and Y. Yin. 2015. “Production Planning of Multi-stage Multi-option Seru Production Systems with Sustainable Measures.” Journal of Cleaner Production 105: 285–299.
  • Liu, C., W. Li, J. Lian, and Y. Yin. 2012. “Reconfiguration of Assembly Systems: From Conveyor Assembly Line to Serus.” Journal of Manufacturing Systems 31 (3): 312–325.
  • Liu, C., N. Yang, W. Li, J. Lian, S. Evans, and Y. Yin. 2013. “Training and Assignment of Multi-skilled Workers for Implementing Seru Production Systems.” The International Journal of Advanced Manufacturing Technology 69 (5–8): 937–959.
  • Luo, L., Z. Zhang, and Y. Yin. 2016. “Seru Loading with Worker-operation Assignment in Single Period.” In Industrial Engineering and Engineering Management (IEEM), 2016 IEEE International Conference on, 1055–1058. IEEE.
  • Mavrotas, G. 2009. “Effective Implementation of the ε-Constraint Method in Multi-objective Mathematical Programming Problems.” Applied Mathematics and Computation 213 (2): 455–465.
  • Mavrotas, G., and K. Florios. 2013. “An Improved Version of the Augmented ε-Constraint Method (AUGMECON2) for Finding the Exact Pareto Set in Multi-objective Integer Programming Problems.” Applied Mathematics and Computation 219 (18): 9652–9669.
  • Pires, D. F., C. H. Antunes, and A. G. Martins. 2012. “NSGA-II with Local Search for a Multi-objective Reactive Power Compensation Problem.” International Journal of Electrical Power & Energy Systems 43 (1): 313–324.
  • Ramesh, S., S. Kannan, and S. Baskar. 2012. “Application of Modified NSGA-II Algorithm to Multi-objective Reactive Power Planning.” Applied Soft Computing 12 (2): 741–753.
  • Rasmi, S. A. B., and M. Türkay. 2019. “GoNDEF: An Exact Method to Generate All Non-dominated Points of Multi-objective Mixed-integer Linear Programs.” Optimization and Engineering 20 (1): 89–117.
  • Sakazume, Y. 2005. “Is Japanese Cell Manufacturing a New System?: A Comparative Study Between Japanese Cell Manufacturing and Cellular Manufacturing.” Journal of Japan Industrial Management Association 55 (6): 341–349.
  • Schmenner, R. W., and M. L. Swink. 1998. “On Theory in Operations Management.” Journal of Operations Management 17 (1): 97–113.
  • Shahidi-Zadeh, B., R. Tavakkoli-Moghaddam, A. Taheri-Moghadam, and I. Rastgar. 2017. “Solving a Bi-objective Unrelated Parallel Batch Processing Machines Scheduling Problem: A Comparison Study.” Computers & Operations Research 88: 71–90.
  • Shao, L., Z. Zhang, and Y. Yin. 2016. “A Bi-objective Combination Optimisation Model for Line-seru Conversion Based on Queuing Theory.” International Journal of Manufacturing Research 11 (4): 322–338.
  • Shao, L., Z. Zhang, and Y. Yin. 2017. “Production System Performance Improvement by Assembly Line-seru Conversion.” In Proceedings of the Tenth International Conference on Management Science and Engineering Management, 1165–1180. Singapore: Springer.
  • Stecke, K. E., Y. Yin, and I. Kaku. 2014. “Seru Production: An Extension of Just-in-Time Approach for Volatile Business Environments.” In Analytical Approaches to Strategic Decision-making: Interdisciplinary Considerations, 45–58. Hershey, PA: IGI Global.
  • Stecke, K. E., Y. Yin, I. Kaku, and Y. Murase. 2012. “Seru: the Organizational Extension of JIT for a Super-talent Factory.” International Journal of Strategic Decision Sciences 3 (1): 106–119.
  • Sun, W., Q. Li, C. Huo, Y. Yu, and K. Ma. 2016. “Formulations, Features of Solution Space, and Algorithms for Line-pure Seru System Conversion.” Mathematical Problems in Engineering 2016: 1–14.
  • Sun, W., Y. Wu, Q. Lou, and Y. Yu. 2019. “A Cooperative Coevolution Algorithm for the Seru Production with Minimizing Makespan.” IEEE Access 7: 5662–5670.
  • Villa, A., and T. Taurino. 2013. “From JIT to Seru, for a Production as Lean as Possible.” Procedia Engineering 63: 956–965.
  • Wang, S., and M. Liu. 2015. “Multi-objective Optimization of Parallel Machine Scheduling Integrated with Multi-resources Preventive Maintenance Planning.” Journal of Manufacturing Systems 37: 182–192.
  • Wang, Y., and J. Tang. 2017. “Multi-objective Optimization Model for Seru Production System Formation Under Uncertain Condition.” In Service Systems and Service Management (ICSSSM), 2017 International Conference, 1–6. IEEE.
  • Wang, Y., and J. Tang. 2018. “Cost and Service-level-Based Model for a Seru Production System Formation Problem with Uncertain Demand.” Journal of Systems Science and Systems Engineering 27 (4): 519–537.
  • Wang, P. S., T. Yang, and M. C. Chang. 2017. “Effective Layout Designs for the Shojinka Control Problem for a TFT-LCD Module Assembly Line.” Journal of Manufacturing Systems 44: 255–269.
  • Wu, L., F. T. Chan, B. Niu, and L. Li. 2018. “Cross-trained Worker Assignment and Comparative Analysis on Throughput of Divisional and Rotating Seru.” Industrial Management & Data Systems 118 (5): 1114–1136.
  • Ye, W., and T. Jiafu. 2018. “Is Full Skill the Best Configuration for Seru Production System?” In 2018 Chinese Control and Decision Conference (CCDC), 3904–3909. IEEE.
  • Yin, Y., I. Kaku, and K. E. Stecke. 2008. The Evolution of Seru Production Systems Throughout Canon. Vol. 14. NeilsonJournals Publishing.
  • Yin, Y., K. E. Stecke, and D. Li. 2018. “The Evolution of Production Systems From Industry 2.0 Through Industry 4.0.” International Journal of Production Research 56 (1–2): 848–861. Edinburgh.
  • Yin, Y., K. E. Stecke, M. Swink, and I. Kaku. 2017. “Lessons From Seru Production on Manufacturing Competitively in a High Cost Environment.” Journal of Operations Management 49–51: 67–76.
  • Ying, K. C., and Y. J. Tsai. 2017. “Minimising Total Cost for Training and Assigning Multiskilled Workers in Seru Production Systems.” International Journal of Production Research 55 (10): 2978–2989.
  • Yılmaz, Ö. F. 2019. “Operational Strategies for Seru Production System: A Bi-objective Problem and Solution Methods (Dataset).” GitHub-omerfarukktu Repository. https://github.com/omerfarukktu/DATASET.
  • Yılmaz, Ö. F., and M. B. Durmuşoğlu. 2018a. “Evolutionary Algorithms for Multi-objective Scheduling in a Hybrid Manufacturing System.” In Handbook of Research on Applied Optimization Methodologies in Manufacturing Systems, 162–187. Hershey, PA: IGI Global.
  • Yilmaz, O. F., and M. B. Durmusoglu. 2018b. “A Performance Comparison and Evaluation of Metaheuristics for a Batch Scheduling Problem in a Multi-hybrid Cell Manufacturing System with Skilled Workforce Assignment.” Journal of Industrial & Management Optimization, 143–157.
  • Yu, Y., J. Gong, J. Tang, Y. Yin, and I. Kaku. 2012. “How to Carry out Assembly Line–Cell Conversion? A Discussion Based on Factor Analysis of System Performance Improvements.” International Journal of Production Research 50 (18): 5259–5280.
  • Yu, Y., W. Sun, J. Tang, I. Kaku, and J. Wang. 2017. “Line-seru Conversion Towards Reducing Worker (s) Without Increasing Makespan: Models, Exact and Meta-heuristic Solutions.” International Journal of Production Research 55 (10): 2990–3007.
  • Yu, Y., W. Sun, J. Tang, and J. Wang. 2017. “Line-hybrid Seru System Conversion: Models, Complexities, Properties, Solutions and Insights.” Computers & Industrial Engineering 103: 282–299.
  • Yu, Y., J. Tang, J. Gong, Y. Yin, and I. Kaku. 2014. “Mathematical Analysis and Solutions for Multi-objective Line-cell Conversion Problem.” European Journal of Operational Research 236 (2): 774–786.
  • Yu, Y., J. Tang, W. Sun, Y. Yin, and I. Kaku. 2013a. “Combining Local Search Into Non-dominated Sorting for Multi-objective Line-cell Conversion Problem.” International Journal of Computer Integrated Manufacturing 26 (4): 316–326.
  • Yu, Y., J. Tang, W. Sun, Y. Yin, and I. Kaku. 2013b. “Reducing Worker (s) by Converting Assembly Line Into a Pure Cell System.” International Journal of Production Economics 145 (2): 799–806.
  • Yu, Y., J. Wang, K. Ma, and W. Sun. 2018. “Seru System Balancing: Definition, Formulation, and Exact Solution.” Computers & Industrial Engineering 122: 318–325.
  • Yu, Y., S. Wang, J. Tang, I. Kaku, and W. Sun. 2016. “Complexity of Line-seru Conversion for Different Scheduling Rules and Two Improved Exact Algorithms for the Multi-objective Optimization.” SpringerPlus 5 (1): 809.
  • Zhang, X., C. Liu, W. Li, S. Evans, and Y. Yin. 2017. “Effects of Key Enabling Technologies for Seru Production on Sustainable Performance.” Omega 66: 290–307.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.