References
- Afzalirad, M., and J. Rezaeian. 2016. “Resource-constrained Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Times, Precedence Constraints and Machine Eligibility Restrictions.” Computers & Industrial Engineering 98 (C): 40–52. doi:10.1016/j.cie.2016.05.020.
- Beezão, A. C., J.-F. Cordeau, G. Laporte, and H. H. Yanasee. 2017. “Scheduling Identical Parallel Machines with Tooling Constraints.” European Journal of Operational Research 257 (3): 834–844. doi:10.1016/j.ejor.2016.08.008.
- Bilge, Ü, F. Kıraç, M. Kurtulan, and P. Pekgün. 2004. “A Tabu Search Algorithm for Parallel Machine Total Tardiness Problem.” Computers & Operations Research 31 (3): 397–414. doi:10.1016/S0305-0548(02)00198-3.
- Biskup, D., J. Herrmann, and J. N. D. Gupta. 2008. “Scheduling Identical Parallel Machines to Minimize Total Tardiness.” International Journal of Production Economics 115 (1): 134–142. doi:10.1016/ j.ijpe.2008.04.011.
- Chang, P.-C., and S.-H. Chen. 2011. “Integrating Dominance Properties with Genetic Algorithms for Parallel Machine Scheduling Problems with Setup Times.” Applied Soft Computing 11 (1): 1263–1274. doi: 10.1016/j.asoc.2010.03.003
- Cheng, T. C. E., and C. C. S. Sin. 1990. “A State-of-the-art Review of Parallel-Machine Scheduling Research.” European Journal of Operational Research 47 (3): 271–292. doi:10.1016/0377-2217(90)90215-W.
- Cheng, B., Q. Wang, S. Yang, and X. Hu. 2013. “An Improved ant Colony Optimization for Scheduling Identical Parallel Batching Machines with Arbitrary job Sizes.” Applied Soft Computing 13 (2): 765–772. doi:10.1016/j.asoc.2012.10.021.
- Eroglu, D. Y., and H. C. Ozmutlu. 2014. “MIP Models and Hybrid Algorithms for Simultaneous job Splitting and Scheduling on Unrelated Parallel Machines.” The Scientific World Journal 2014 (519520): 1–19. doi:10.1155/2014/519520.
- Eroglu, D. Y., and H. C. Ozmutlu. 2017. “Solution Method for a Large-Scale Loom Scheduling Problem with Machine Eligibility and Splitting Property.” Journal of Textile & Apparel 108 (12): 2154–2165. doi:10.1080/00405000.2017.1316177.
- Eroglu, D. Y., H. C. Ozmutlu, and S. A. Koksal. 2014. “A Genetic Algorithm for the Unrelated Parallel Machine Scheduling Problem with job Splitting and Sequence-Dependent Setup Times–Loom Scheduling.” Journal of Textile & Apparel 24 (1): 66–73. http://dergipark.gov.tr/download/article-file/218376.
- Eroglu, D. Y., H. C. Ozmutlu, and S. Ozmutlu. 2014. “Genetic Algorithm with Local Search for the Unrelated Parallel Machine Scheduling Problem with Sequence-Dependent set-up Times.” International Journal of Production Research 52 (19): 5841–5856. doi:10.1080/00207543.2014.920966.
- Fanjul-Peyro, L., F. Perea, and R. Ruiz. 2017. “Models and Matheuristics for the Unrelated Parallel Machine Scheduling Problem with Additional Resources.” European Journal of Operational 260 (2): 482–493. doi:10.1016/j.ejor.2017.01.002.
- Kabbi, J., and Y. Harrath. 2019. “Scheduling on Uniform Parallel Machines with Periodic Unavailability Constraints.” International Journal of Production Research 57 (1): 216–227. doi:10.1080/00207543.2018.1471242.
- Kim, S. C., and P. M. Bobrowski. 1994. “Impact of Sequence-Dependent Setup Time on job Shop Scheduling Performance.” International Journal of Production Research 32 (7): 1503–1520. doi:10.1080/00207549408957019.
- Kim, Y. D., S. O. Shim, S. B. Kim, and Y. C. Choi. 2004. “Parallel Machine Scheduling Considering a job-Splitting Property.” International Journal of Production Research 42 (21): 4531–4546. doi:10.1080/00207540410001720745.
- Koulamas, C., and G. J. Kyparisis. 2009. “A Modified LPT Algorithm for the Two Uniform Parallel Machine Makespan Minimization Problem.” European Journal of Operational Research 196 (1): 61–68. doi:10.1016/j.ejor.2008.02.008.
- Labbi, W., M. Boudhar, and A. Oulamara. 2017. “Scheduling Two Identical Parallel Machines with Preparation Constraints.” International Journal of Production Research 55 (6): 1531–1548. doi:10.1080/00207543.2014.978032.
- Lee, C. H. 2018. “A Dispatching Rule and a Random Iterated Greedy Metaheuristic for Identical Parallel Machine Scheduling to Minimize Total Tardiness.” International Journal of Production Research 56 (6): 2292–2308. doi:10.1080/00207543.2017.1374571.
- Lee, W. C., M. C. Chuang, and W. C. Yeh. 2012. “Uniform Parallel-Machine Scheduling to Minimize Makespan with Position-Based Learning Curves.” Computers & Industrial Engineering 63 (4): 813–818. doi:10.1016/j.cie.2012.05.003.
- Lee, W. C., C. C. Wu, and P. Chen. 2006. “A Simulated Annealing Approach to Makespan Minimization on Identical Parallel Machines.” The International Journal of Advanced Manufacturing Technology 31 (3-4): 328–334. doi:10.1007/s00170-005-0188-5.
- Lei D., Y. Yuan, J. Cai, and D. Bai. 2019. “An Imperialist Competitive Algorithm with Memory for Distributed Unrelated Parallel Machines Scheduling.” International Journal of Production Research Advance online publication. doi:10.1080/00207543.2019.1598596.
- Liao, C. J., C. H. Lee, and H. T. Tsai. 2016. “Scheduling with Multi-Attribute set-up Times on Unrelated Parallel Machines.” International Journal of Production Research 54 (16): 4839–4853. doi:10.1080/00207543.2015.1118574.
- Lin, Y. K., M. E. Pfund, and J. W. Fowler. 2011. “Heuristics for Minimizing Regular Performance Measures in Unrelated Parallel Machine Scheduling Problems.” Computers & Operations Research 38 (6): 901–916. doi:10.1016/j.cor.2010.08.018.
- Logendran, R., and F. Subur. 2004. “Unrelated Parallel Machine Scheduling with Job Splitting.” IIE Transactions 36 (4): 359–372. doi:10.1080/07408170490279598.
- Man, K. F., K. S. Tang, and S. Kwong. 1996. “Genetic Algorithms: Concepts and Applications.” IEEE Transactions on Industrial Electronics 43 (5): 519–534. doi:10.1109/41.538609.
- Mokotoff, E. 2001. “Parallel Machine Scheduling Problems: A Survey.” Asia-Pacific Journal of Operational Research 18 (2): 193–242. https://www.researchgate.net/publication/265459019 _Parallel_machine_scheduling_problems_A_survey.
- Park, M. W., and Y. D. Kim. 1998. “A Systematic Procedure for Setting Parameters in Simulated Annealing Algorithm.” Computers & Operations Research 25 (3): 207–217. doi:10.1016/S0305-0548(97)00054-3.
- Park, T., T. Lee, and C. O. Kim. 2012. “Due-date Scheduling on Parallel Machines with job Splitting and Sequence-Dependent Major/Minor Setup Times.” The International Journal of Advanced Manufacturing Technology 59 (1-4): 325–333. doi:10.1007/s00170-011-3489-x.
- Sarıçiçek, I., and C. Çelik. 2011. “Two Metaheuristics for Parallel Machine Scheduling with job Splitting to Minimize Total Tardiness.” Applied Mathematical Modelling 35 (8): 4117–4126. doi:10.1016 /j.apm.2011.02.035.
- Shim, S. O., and Y. D. Kim. 2008. “A Branch and Bound Algorithm for an Identical Parallel Machine Scheduling Problem with a job Splitting Property.” Computers & Operations Research 35 (3): 863–875. doi:10.1016/j.cor.2006.04.006.
- Tahar, D. N., F. Yalaoui, C. Chu, and L. Amodeo. 2006. “A Linear Programming Approach for Identical Parallel Machine Scheduling with job Splitting and Sequence-Dependent Setup Times.” International Journal of Production Economics 99 (1): 63–73. doi:10.1016/j.ijpe.2004.12.007.
- Tanaka, S., and M. Araki. 2008. “A Branch-and-Bound Algorithm with Lagrangian Relaxation to Minimize Total Tardiness on Identical Parallel Machines.” International Journal of Production Economics 113 (1): 446–458. doi:10.1016/j.ijpe.2007.10.006.
- Tran, T. T., A. Araujo, and J. C. Beck. 2016. “Decomposition Methods for the Parallel Machine Scheduling Problem with Setups.” Informs Journal on Computing 28 (1): 83–95. doi:10.1287/ijoc.2015.0666.
- Vallada, E., and R. Ruiz. 2011. “A Genetic Algorithm for the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Times.” European Journal of Operational Research 211 (3): 612–622. doi:10.1016/j.ejor.2011.01.011.
- Wang, X., and T. C. E. Cheng. 2015. “A Heuristic for Scheduling Jobs on two Identical Parallel Machines with a Machine Availability Constraint.” International Journal of Production Economics 161: 74–82. doi:10.1016/j.ijpe.2014.12.001.
- Wang, W. L., H. Y. Wang, Y. W. Zhao, L. P. Zhang, and X. L. Xu. 2013. “Parallel Machine Scheduling with Splitting Jobs by a Hybrid Differential Evolution Algorithm.” Computers & Industrial Engineering 40: 1196–1206. doi:10.1016/j.cor.2012.12.007.
- Xing, W., and J. Zhang. 2000. “Parallel Machine Scheduling with Splitting Jobs.” Discrete Applied Mathematics 103: 259–269. doi:10.1016/S0166-218X(00)00176-1.
- Yang, D. L., and S. J. Yang. 2013. “Unrelated Parallel-Machine Scheduling Problems with Multiple Rate-Modifying Activities.” Information Sciences 235: 280–286. doi:10.1016/j.ins.2013.02.013.
- Yeh, W. C., M. C. Chuang, and W. C. Lee. 2015. “Uniform Parallel Machine Scheduling with Resource Consumption Constraint.” Applied Mathematical Modelling 39 (8): 2131–2138. doi:10.1016/j.apm.2014.10.012.