References
- Allahverdi, A. 2015. “The Third Comprehensive Survey on Scheduling Problems with Setup Times/costs.” European Journal of Operational Research 246 (2): 345–378. doi:10.1016/J.EJOR.2015.04.004.
- Amorim, P., T. Pinto-Varela, B. Almada-Lobo, and A. P. F. D. Barbósa-Póvoa. 2013. “Comparing Models for Lot-sizing and Scheduling of Single-stage Continuous Processes: Operations Research and Process Systems Engineering Approaches.” Computers & Chemical Engineering 52: 177–192. doi:10.1016/j.compchemeng.2013.01.006.
- Baldo, T. A., M. O. Santos, B. Almada-Lobo, and R. Morabito. 2014. “An Optimization Approach for the Lot Sizing and Scheduling Problem in the Brewery Industry.” Computers & Industrial Engineering 72: 58–71. doi:10.1016/j.cie.2014.02.008.
- Ben-Tal, A., L. E. Ghaoui, and A. Nemirovski. 2009. Robust Optimization. Princeton University Press. doi:10.1016/s1474-6670(17)42591-2.
- Cerdá, J., G. P. Henning, and I. E. Grossmann. 1997. “Mixed-integer Linear Programming Model for Short-term Scheduling of Single-stage Multiproduct Batch Plants with Parallel Lines.” Industrial & Engineering Chemistry Research 36 (5): 1695–1707. doi:10.1021/ie9605490.
- Clark, A. R., M. Mahdieh, and S. Rangel. 2014. “Production Lot Sizing and Scheduling with Non-triangular Sequence-dependent Setup Times.” International Journal of Production Research 52 (8): 2490–2503. doi:10.1080/00207543.2014.885662.
- Clark, A. R., R. Morabito, and E. A. V. Toso. 2010. “Production Setup-sequencing and Lot-sizing at an Animal Nutrition Plant Through ATSP Subtour Elimination and Patching.” Journal of Scheduling 13 (2): 111–121. doi:10.1007/s10951-009-0135-7.
- Connolly, A. 2017. “2017 Alltech Global Feed Survey.” Accessed 13 June 2017. doi:http://go.alltech.com/alltech-feed-survey#blogcontinued.
- Dauzere-Peres, S., and J. B. Lasserre. 1993. “A Modified Shifting Bottleneck Procedure for Job-shop Scheduling.” International Journal of Production Research 31 (4): 923–932. doi:10.1080/00207549308956766.
- Ferreira, D., A. R. Clark, B. Almada-Lobo, and R. Morabito. 2012. “Single-stage Formulations for Synchronised Two-stage Lot Sizing and Scheduling in Soft Drink Production.” International Journal of Production Economics 136 (2): 255–265. doi:10.1016/j.ijpe.2011.11.028.
- Forrest, J., and R. Lougee-Heimer. 2005. “CBC User Guide.” In INFORMS Tutorials in Operations Research: Emerging Theory, Methods, and Applications, 257–277. doi:10.1287/educ.1053.0020.
- Fuchigami, H. Y., and S. Rangel. 2018. “A Survey of Case Studies in Production Scheduling: Analysis and Perspectives.” Journal of Computational Science 25: 425–436. doi:10.1016/J.JOCS.2017.06.004.
- Graham, R. L., E. L. Lawler, J. K. Lenstra, and A. H. G. R. Kan. 1979. “Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey.” Annals of Discrete Mathematics 5: 287–326. doi:10.1016/S0167-5060(08)70356-X.
- Gurobi Optimization Inc. 2016. “Gurobi Optimizer Reference Manual.” doi:http://www.gurobi.com.
- IBM. 2017. “IBM ILOG CPLEX Optimization Studio.” doi:https://www.ibm.com/bs-en/marketplace/ibm-ilog-cplex.
- Jiang, W., Z. Yuan, J. Bi, and L. Sun. 2010. “Conserving Water by Optimizing Production Schedules in the Dyeing Industry.” Journal of Cleaner Production 18 (16–17): 1696–1702. doi:10.1016/j.jclepro.2010.07.004.
- Kim, S. C., and P. M. Bobrowski. 1994. “Impact of Sequence-dependent Setup Time on Job Shop Scheduling Performance.” International Journal of Production Research 32 (7): 1503–1520. doi:10.1080/00207549408957019.
- Kim, J. G., S. Song, and B. Jeong. 2019. “Minimising Total Tardiness for the Identical Parallel Machine Scheduling Problem with Splitting Jobs and Sequence-dependent Setup Times.” International Journal of Production Research. doi:10.1080/00207543.2019.1672900.
- Lawrence, S. R., and A. H. Buss. 1994. “Shifting Production Bottlenecks: Causes, Cures and Conundrums.” Production and Operations Management 3 (1): 21–37. doi:10.1111/j.1937-5956.1994.tb00107.x.
- Linn, R., and W. Zhang. 1999. “Hybrid Flow Shop Scheduling: A Survey.” Computers and Industrial Engineering 37: 57–61. doi:10.1016/S0360-8352(99)00023-6.
- Manne, A. S. 1960. “On the Job-shop Scheduling Problem.” Operations Research 8 (2): 219–223. doi:10.1287/opre.8.2.219.
- Pan, C. H. 1997. “A Study of Integer Programming Formulations for Scheduling Problems.” International Journal of Systems Science 28 (1): 33–41. doi:10.1080/00207729708929360.
- Papadimitriou, C. H., and K. Steiglitz. 1998. Combinatorial Optimization: Algorithms and Complexity. Mineola, NY: Dover Publications.
- Pinedo, M. L. 2016. Scheduling: Theory, Algorithms, and Systems. Springer International Publishing. doi:10.1007/978-0-387-78935-4.
- Pollard, D., S. Chuo, and B. Lee. 2008. “Strategies for Mass Customization.” Journal of Business & Economics Research 6 (7): 77–86. doi:10.19030/jber.v6i7.2447.
- Shi, F., S. Zhao, and Y. Meng. 2019. “Hybrid Algorithm Based on Improved Extended Shifting Bottleneck Procedure and GA for Assembly Job Shop Scheduling Problem.” International Journal of Production Research. doi:10.1080/00207543.2019.1622052.
- Stefansson, H., N. Shah, and P. Jensson. 2006. “Multiscale Planning and Scheduling in the Secondary Pharmaceutical Industry.” AIChE Journal 52 (12): 4133–4149. doi:10.1002/aic.10989.
- Toledo, C. F. M., L. De Oliveira, R. De Freitas Pereira, P. M. França, and R. Morabito. 2014. “A Genetic Algorithm/mathematical Programming Approach to Solve a Two-level Soft Drink Production Problem.” Computers & Operations Research 48: 40–52. doi:10.1016/j.cor.2014.02.012.
- Toso, E. A. V., R. Morabito, and A. R. Clark. 2009. “Lot Sizing and Sequencing Optimisation at an Animal-feed Plant.” Computers & Industrial Engineering 57 (3): 813–821. doi:10.1016/j.cie.2009.02.011.
- Velez, S., Y. Dong, and C. T. Maravelias. 2017. “Changeover Formulations for Discrete-time Mixed-integer Programming Scheduling Models.” European Journal of Operational Research. doi:10.1016/j.ejor.2017.01.004.
- Williams, H. P. 2013. Model Building in Mathematical Programming. John Wiley & Sons. doi:10.1057/jors.1986.76.
- Zhang, Q., H. Manier, and M. A. Manier. 2014. “A Modified Shifting Bottleneck Heuristic and Disjunctive Graph for Job Shop Scheduling Problems with Transportation Constraints.” International Journal of Production Research 52 (4): 985–1002. doi:10.1080/00207543.2013.828164.
- Zhu, X., and W. E. Wilhelm. 2006. “Scheduling and Lot Sizing with Sequence-dependent Setup: A Literature Review.” IIE Transactions 38 (11): 987–1007. doi: 10.1080/07408170600559706