References
- Agrawal, V. V., M. Ferguson, and G. C. Souza. 2016. “Trade-In Rebates for Price Discrimination and Product Recovery.” IEEE Transactions on Engineering Management 63 (3): 326–339. doi:10.1109/TEM.2016.2574244.
- Agrawal, S., and M. K. Tiwari. 2008. “A Collaborative Ant Colony Algorithm to Stochastic Mixed-Model U-Shaped Disassembly Line Balancing and Sequencing Problem.” International Journal of Production Research 46 (6): 1405–1429. doi:10.1080/00207540600943985.
- Aksoy, H. K., and S. M. Gupta. 2005. “Buffer Allocation Plan for a Remanufacturing Cell.” Computers & Industrial Engineering 48 (3): 657–677. doi:10.1016/j.cie.2003.03.007.
- Aksoy, H. K., and S. M. Gupta. 2010. “Near Optimal Buffer Allocation in Remanufacturing Systems with N-Policy.” Computers & Industrial Engineering 59 (4): 496–508. doi:10.1016/j.cie.2010.06.004.
- Alkhayyal, B. 2019a. “Corporate Social Responsibility Practices in the U.S.: Using Reverse Supply Chain Network Design and Optimization Considering Carbon Cost.” Sustainability 11 (7): 2097. doi:10.3390/su11072097.
- Alkhayyal, B. 2019b. “Designing an Optimization Carbon Cost Network in a Reverse Supply Chain.” Production & Manufacturing Research 7 (1): 271–293. doi:10.1080/21693277.2019.1619103.
- Alqahtani, A. Y., and S. M. Gupta. 2017a. “Evaluating Two-Dimensional Warranty Policies for Remanufactured Products.” Journal of Remanufacturing 7 (1): 19–47. doi:10.1007/s13243-017-0032-8.
- Alqahtani, A. Y., and S. M. Gupta. 2017b. “Warranty as a Marketing Strategy for Remanufactured Products.” Journal of Cleaner Production 161: 1294–1307. doi:10.1016/j.jclepro.2017.06.193.
- Alqahtani, A. Y., and S. M. Gupta. 2017. “Evaluating Two-Dimensional Warranty Policies for Remanufactured Products.” Journal of Remanufacturing 7 (1): 19–47. doi:10.1007/s13243-017-0032-8.
- Alqahtani, A. Y., and S. M. Gupta. 2018. “Money-Back Guarantee Warranty Policy with Preventive Maintenance Strategy for Sensor-Embedded Remanufactured Products.” Journal of Industrial Engineering International 14 (4): 767–782. doi:10.1007/s40092-018-0259-5.
- Alshibli, M., A. ElSayed, E. Kongar, T. Sobh, and S. M. Gupta. 2019. “A Robust Robotic Disassembly Sequence Design Using Orthogonal Arrays and Task Allocation.” Robotics 8 (1): 20. doi:10.3390/robotics8010020.
- Alshibli, M., A. El Sayed, O. Tozanli, E. Kongar, T. M. Sobh, and S. M. Gupta. 2018. “A Decision Maker-Centered End-of-Life Product Recovery System for Robot Task Sequencing.” Journal of Intelligent & Robotic Systems 91 (3): 603–616. doi:10.1007/s10846-017-0749-5.
- Aras, N., R. Güllü, and S. Yürülmez. 2011. “Optimal Inventory and Pricing Policies for Remanufacturable Leased Products.” International Journal of Production Economics 133 (1): 262–271. doi:10.1016/j.ijpe.2010.01.024.
- Bahga, A., and V. K. Madisetti. 2016. “Blockchain Platform for Industrial Internet of Things.” Journal of Software Engineering and Applications 9 (10): 533. doi:10.4236/jsea.2016.910036.
- Battaïa, O., A. Dolgui, S. S. Heragu, S. M. Meerkov, and M. K. Tiwari. 2018. “Design for Manufacturing and Assembly/Disassembly: Joint Design of Products and Production Systems.” International Journal of Production Research 56 (24): 7181–7189. doi:10.1080/00207543.2018.1549795.
- Behdad, S., A. T. Joseph, and D. Thurston. 2013. "Systems Simulation of Design for End-of-Life Recovery under Uncertainty." In Proceedings of the ASME 2013 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference. Volume 4: 18th Design for Manufacturing and the Life Cycle Conference; 2013 ASME/IEEE International Conference on Mechatronic and Embedded Systems and Applications. Portland, Oregon, USA. doi:10.1115/DETC2013-12639.
- Ben-Daya, M., E. Hassini, and Z. Bahroun. 2019. “Internet of Things and Supply Chain Management: A Literature Review.” International Journal of Production Research 57 (15-16): 4719–4742. doi:10.1080/00207543.2017.1402140.
- Bentaha, M. L., O. Battaïa, and A. Dolgui. 2015. “An Exact Solution Approach for Disassembly Line Balancing Problem Under Uncertainty of the Task Processing Times.” International Journal of Production Research 53 (6): 1807–1818. doi:10.1080/00207543.2014.961212.
- Bumblauskas, D., D. Gemmill, A. Igou, and J. Anzengruber. 2017. “Smart Maintenance Decision Support Systems (Smdss) Based on Corporate Big Data Analytics.” Expert Systems with Applications 90: 303–317. doi:10.1016/j.eswa.2017.08.025.
- Cao, K., X. Xu, Y. Bian, and Y. Sun. 2019. “Optimal Trade-In Strategy of Business-to-Consumer Platform with Dual-Format Retailing Model.” Omega 82: 181–192. doi:10.1016/j.omega.2018.01.004.
- Cevikcan, E., D. Aslan, and F. B. Yeni. 2019. “Disassembly Line Design with Multi-Manned Workstations: A Novel Heuristic Optimisation Approach.” International Journal of Production Research, 1–22. doi:10.1080/00207543.2019.1587190.
- Chang, M. M. L., S. K. Ong, and A. Y. C. Nee. 2017. “Approaches and Challenges in Product Disassembly Planning for Sustainability.” Procedia CIRP 60: 506–511. doi:10.1016/j.procir.2017.01.013.
- Chen, J.-M., and Y.-T. Hsu. 2015. “Trade-In Strategy for a Durable Goods Firm with Recovery Cost.” Journal of Industrial and Production Engineering 32 (6): 396–407. doi:10.1080/21681015.2015.1071288.
- Christidis, K., and M. Devetsikiotis. 2016. “Blockchains and Smart Contracts for the Internet of Things.” IEEE Access 4: 2292–2303. doi:10.1109/ACCESS.2016.2566339.
- Cole, D., S. Mahapatra, and S. Webster. 2017. “A Comparison of Buyback and Trade-In Policies to Acquire Used Products for Remanufacturing.” Journal of Business Logistics 38 (3): 217–232. doi:10.1111/jbl.12159.
- Das, S. K., P. Yedlarajiah, and R. Narendra. 2000. “An Approach for Estimating the End-of-Life Product Disassembly Effort and Cost.” International Journal of Production Research 38 (3): 657–673. doi:10.1080/002075400189356.
- DHL Trend Research. 2018. “Blockchain in Logistics.” DHL. https://www.logistics.dhl/content/dam/dhl/global/core/documents/pdf/glo-core-blockchain-trend-report.pdf.
- Dolgui, A. 2019. “Selected Surveys on Cutting Edge Problems in Production Research.” International Journal of Production Research 57 (15-16): 4621–4626. doi:10.1080/00207543.2019.1639372.
- Dolgui, A., D. Ivanov, S. Potryasaev, B. Sokolov, M. Ivanova, and F. Werner. 2019. “Blockchain-Oriented Dynamic Modelling of Smart Contract Design and Execution in The Supply Chain.” International Journal of Production Research, 1–16. doi:10.1080/00207543.2019.1627439.
- Dotoli, M., A. Fay, M. Miśkowicz, and C. Seatzu. 2019. “An Overview of Current Technologies and Emerging Trends in Factory Automation.” International Journal of Production Research 57 (15–16): 5047–5067. doi:10.1080/00207543.2018.1510558.
- Dulman, M. T., and S. M. Gupta. 2018a. “Evaluation of Maintenance and EOL Operation Performance of Sensor-Embedded Laptops.” Logistics 2 (1): 3. doi:10.3390/logistics2010003.
- Dulman, M. T., and S. M. Gupta. 2018b. “Maintenance and Remanufacturing Strategy: Using Sensors to Predict The Status of Wind Turbines.” Journal of Remanufacturing 8 (3): 131–152. doi:10.1007/s13243-018-0050-1.
- Elsayed, A., E. Kongar, and S. M. Gupta. 2012. “An Evolutionary Algorithm for Selective Disassembly of End-of-Life Products.” International Journal of Swarm Intelligence and Evolutionary Computation 1: 1–17. doi:10.4303/ijsiec/Z110601.
- Galbreth, M. R., and J. D. Blackburn. 2006. “Optimal Acquisition and Sorting Policies for Remanufacturing.” Production and Operations Management 15 (3): 384–392. doi:10.1111/j.1937-5956.2006.tb00252.x.
- Geraldo, F., and M. S. Jayashankar. 2006. “Managing New and Remanufactured Products.” Management Science 52 (1): 15–26. doi:10.1287/mnsc.1050.0465.
- Godichaud, M., and L. Amodeo. 2019. “EOQ Inventory Models for Disassembly Systems with Disposal and Lost Sales.” International Journal of Production Research 57 (18): 5685–5704. doi:10.1080/00207543.2018.1542180.
- Guide Jr, V. D. R. R, H. Teunter, and L. N. van Wassenhove. 2003. “Matching Demand and Supply to Maximize Profits From Remanufacturing.” Manufacturing & Service Operations Management 5 (4): 303–316. doi:10.1287/msom.5.4.303.24883.
- Gunasekaran, A., Y. Y. Yusuf, E. O. Adeleye, T. Papadopoulos, D. Kovvuri, and D. G. Geyi. 2019. “Agile Manufacturing: An Evolutionary Review of Practices.” International Journal of Production Research 57 (15-16): 5154–5174. doi:10.1080/00207543.2018.1530478.
- Habibi, M. K. K., O. Battaïa, V.-D. Cung, A. Dolgui, and M. K. Tiwari. 2019. “Sample Average Approximation for Multi-Vehicle Collection–Disassembly Problem Under Uncertainty.” International Journal of Production Research 57 (8): 2409–2428. doi:10.1080/00207543.2018.1519262.
- He, J., F. Chu, F. Zheng, M. Liu, and C. Chu. 2019. “A Multi-Objective Distribution-Free Model and Method for Stochastic Disassembly Line Balancing Problem.” International Journal of Production Research, 1–17. doi:10.1080/00207543.2019.1656841.
- Heese, H. S., K. Cattani, G. Ferrer, W. Gilland, and A. V. Roth. 2005. “Competitive Advantage Through Take-Back of Used Products.” European Journal of Operational Research 164 (1): 143–157. doi:10.1016/j.ejor.2003.11.008.
- Hofmann, E., and M. Rüsch. 2017. “Industry 4.0 and the Current Status as Well as Future Prospects on Logistics.” Computers in Industry 89: 23–34. doi:10.1016/j.compind.2017.04.002.
- Huang, C. -C., W. -Y. Liang, and S. -R. Yi. 2017. “Cloud-based Design for Disassembly to Create Environmentally Friendly Products.” Journal of Intelligent Manufacturing 28 (5): 1203–1218. doi:10.1007/s10845-015-1093-x.
- Igarashi, K., T. Yamada, S. M. Gupta, M. Inoue, and N. Itsubo. 2016. “Disassembly System Modeling and Design with Parts Selection for Cost, Recycling and CO2 Saving Rates Using Multi Criteria Optimization.” Journal of Manufacturing Systems 38: 151–164. doi:10.1016/j.jmsy.2015.11.002.
- Ilgin, M. A., and S. M. Gupta. 2010a. “Comparison of Economic Benefits of Sensor Embedded Products and Conventional Products in a Multi-Product Disassembly Line.” Computers & Industrial Engineering 59 (4): 748–763. doi:10.1016/j.cie.2010.07.031.
- Ilgin, M. A., and S. M. Gupta. 2010. “Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art.” Journal of Environmental Management 91 (3): 563–591. doi:10.1016/j.jenvman.2009.09.037.
- Ilgin, M. A., and S. M. Gupta. 2011a. “Evaluating the Impact of Sensor-Embedded Products on the Performance of an Air Conditioner Disassembly Line.” International Journal of Advanced Manufacturing Technology 53 (9): 1199–1216. doi:10.1007/s00170-010-2891-0.
- Ilgin, M. A., and S. M. Gupta. 2011b. “Performance Improvement Potential of Sensor Embedded Products in Environmental Supply Chains.” Resources, Conservation and Recycling 55 (6): 580–592. doi:10.1016/j.resconrec.2010.05.001.
- Ilgin, M. A., S. M. Gupta, and K. Nakashima. 2011. “Coping with Disassembly Yield Uncertainty in Remanufacturing Using Sensor Embedded Products.” Journal of Remanufacturing 1 (1): 7. doi:10.1186/2210-4690-1-7.
- Ilgin, M. A., and G. T. Taşoğlu. 2016. “Simultaneous Determination of Disassembly Sequence and Disassembly-to-Order Decisions Using Simulation Optimization.” Journal of Manufacturing Science and Engineering 138 (10). doi:10.1115/1.4033603.
- Ji, X., Z. Zhang, S. Huang, and L. Li. 2016. “Capacitated Disassembly Scheduling with Parts Commonality and Start-Up Cost and Its Industrial Application.” International Journal of Production Research 54 (4): 1225–1243. doi:10.1080/00207543.2015.1058536.
- Johnson, M. R., and I. P. McCarthy. 2014. “Product Recovery Decisions Within the Context of Extended Producer Responsibility.” Journal of Engineering and Technology Management 34: 9–28. doi:10.1016/j.jengtecman.2013.11.002.
- Joshi, A. D., and S. M. Gupta. 2019. “Evaluation of Design Alternatives of End-of-Life Products using Internet of Things.” International Journal of Production Economics 208: 281–293. doi:10.1016/j.ijpe.2018.12.010.
- Joshi, A. D., S. M. Gupta, and A. Ishigaki. 2017. “Evaluation of Design Alternatives of Sensor Embedded End-of-Life Products in Multiple Periods.” Procedia CIRP 61: 98–103. doi:10.1016/j.procir.2016.11.204.
- Kazancoglu, Y., and Y. D. Ozkan-Ozen. 2019. “Sustainable Disassembly Line Balancing Model Based on Triple Bottom Line.” International Journal of Production Research, 1–21. doi:10.1080/00207543.2019.1651456.
- Keivanpour, S., and D. Ait Kadi. 2018. “Strategic Eco-Design Map of the Complex Products: Toward Visualisation of the Design for Environment.” International Journal of Production Research 56 (24): 7296–7312. doi:10.1080/00207543.2017.1388931.
- Keyvanshokooh, E., M. Fattahi, S. M. Seyed-Hosseini, and R. Tavakkoli-Moghaddam. 2013. “A Dynamic Pricing Approach for Returned Products in Integrated Forward/Reverse Logistics Network Design.” Applied Mathematical Modelling 37 (24): 10182–10202. doi:10.1016/j.apm.2013.05.042.
- Kim, H. J., D. H. Lee, and P. Xirouchakis. 2007. “Disassembly Scheduling: Literature Review and Future Research Directions.” International Journal of Production Research 45 (18-19): 4465–4484. doi:10.1080/00207540701440097.
- Kim, H.-W., C. Park, and D.-H. Lee. 2018. “Selective Disassembly Sequencing with Random Operation Times in Parallel Disassembly Environment.” International Journal of Production Research 56 (24): 7243–7257. doi:10.1080/00207543.2018.1432911.
- Kizilkaya, E. A., and S. M. Gupta. 2006. “Dynamic Kanban System for Disassembly Line Applied to an Industrial Voice Recognition Client Unit.” Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing VI: 22–29.
- Kongar, E., and S. M. Gupta. 2002. “A Multi-Criteria Decision Making Approach for Disassembly-to-Order Systems.” Journal of Electronics Manufacturing 11 (02): 171–183. doi:10.1142/S0960313102000345.
- Kongar, E., and S. M. Gupta. 2006. “Disassembly to Order System Under Uncertainty.” Omega 34 (6): 550–561. doi:10.1016/j.omega.2005.01.006.
- Lambert, A. J. D. 2003. “Disassembly Sequencing: A Survey.” International Journal of Production Research 41 (16): 3721–3759. doi:10.1080/0020754031000120078.
- Li, K. J., and S. H. Xu. 2015. “The Comparison Between Trade-In and Leasing of a Product with Technology Innovations.” Omega 54: 134–146. doi:10.1016/j.omega.2015.01.018.
- Liao, Y., F. Deschamps, E. F. R. Loures, and L. F. P. Ramos. 2017. “Past, Present and Future of Industry 4.0 – A Systematic Literature Review and Research Agenda Proposal.” International Journal of Production Research 55 (12): 3609–3629. doi:10.1080/00207543.2017.1308576.
- Litke, A., D. Anagnostopoulos, and T. Varvarigou. 2019. “Blockchains for Supply Chain Management: Architectural Elements and Challenges Towards a Global Scale Deployment.” Logistics 3 (1): 5. doi:10.3390/logistics3010005.
- Majumder, P., and H. Groenevelt. 2001. “Competition in Remanufacturing.” Production and Operations Management 10 (2): 125–141. doi:10.1111/j.1937-5956.2001.tb00074.x.
- Marconi, M., M. Germani, M. Mandolini, and C. Favi. 2019. “Applying Data Mining Technique to Disassembly Sequence Planning: A Method to Assess Effective Disassembly Time of Industrial Products.” International Journal of Production Research 57 (2): 599–623. doi:10.1080/00207543.2018.1472404.
- Mesa, J. A., I. Esparragoza, and H. Maury. 2018. “Development of a Metric to Assess the Complexity of Assembly/Disassembly Tasks in Open Architecture Products.” International Journal of Production Research 56 (24): 7201–7219. doi:10.1080/00207543.2017.1398431.
- Meyer, G. G., K. Främling, and J. Holmström. 2009. “Intelligent Products: A Survey.” Computers in Industry 60 (3): 137–148. doi:10.1016/j.compind.2008.12.005.
- Miao, Z., H. Mao, K. Fu, and Y. Wang. 2018. “Remanufacturing with Trade-Ins Under Carbon Regulations.” Computers & Operations Research 89: 253–268. doi:10.1016/j.cor.2016.03.014.
- Morgan, S. D., and R. J. Gagnon. 2013. “A Systematic Literature Review of Remanufacturing Scheduling.” International Journal of Production Research 51 (16): 4853–4879. doi:10.1080/00207543.2013.774491.
- O’Donovan, P., K. Leahy, K. Bruton, and D. T. J. O’Sullivan. 2015. “An Industrial Big Data Pipeline for Data-Driven Analytics Maintenance Applications in Large-Scale Smart Manufacturing Facilities.” Journal of Big Data 2 (1): 25. doi:10.1186/s40537-015-0034-z.
- Ondemir, O., and S. M. Gupta. 2014. “Quality Management in Product Recovery Using the Internet of Things: An Optimization Approach.” Computers in Industry 65 (3): 491–504. doi:10.1016/j.compind.2013.11.006.
- Özceylan, E., C. B. Kalayci, A. Güngör, and S. M. Gupta. 2019. “Disassembly Line Balancing Problem: A Review of the State of the Art and Future Directions.” International Journal of Production Research 57 (15-16): 4805–4827. doi:10.1080/00207543.2018.1428775.
- Özceylan, E., and T. Paksoy. 2013. “Reverse Supply Chain Optimisation with Disassembly Line Balancing.” International Journal of Production Research 51 (20): 5985–6001. doi:10.1080/00207543.2013.784405.
- Phadke, M. S. 1989. Quality Engineering Using Robust Design. NJ: Prentice Hall.
- Ray, S., T. Boyaci, and N. Aras. 2005. “Optimal Prices and Trade-in Rebates for Durable, Remanufacturable Products.” Manufacturing & Service Operations Management 7 (3): 208–228. doi:10.1287/msom.1050.0080.
- Rios, P. J., and J. A. Stuart. 2004. “Scheduling Selective Disassembly for Plastics Recovery in an Electronics Recycling Center.” IEEE Transactions on Electronics Packaging Manufacturing 27 (3): 187–197. doi:10.1109/TEPM.2004.843128.
- Sarkis, J., and Q. Zhu. 2018. “Environmental Sustainability and Production: Taking the Road Less Travelled.” International Journal of Production Research 56 (1-2): 743–759. doi:10.1080/00207543.2017.1365182.
- Soh, S. L., S. K. Ong, and A. Y. C. Nee. 2015. “Application of Design for Disassembly From Remanufacturing Perspective.” Procedia CIRP 26: 577–582. doi:10.1016/j.procir.2014.07.028.
- Souza, G. C. 2013. “Closed-Loop Supply Chains: A Critical Review, and Future Research.” Decision Sciences 44 (1): 7–38. doi:10.1111/j.1540-5915.2012.00394.x.
- Stock, T., and G. Seliger. 2016. “Opportunities of Sustainable Manufacturing in Industry 4.0.” Procedia CIRP 40: 536–541. doi:10.1016/j.procir.2016.01.129.
- Taguchi, G. 1986. Orthogonal Arrays and Linear Graphs. Dearborn, Ml: American Supplier Institute.
- Tao, Y., K. Meng, P. Lou, X. Peng, and X. Qian. 2019. “Joint Decision-Making on Automated Disassembly System Scheme Selection and Recovery Route Assignment Using Multi-Objective Meta-Heuristic Algorithm.” International Journal of Production Research 57 (1): 124–142. doi:10.1080/00207543.2018.1461274.
- Tian, X., and Z.-H. Zhang. 2019. “Capacitated Disassembly Scheduling and Pricing of Returned Products with Price-Dependent Yield.” Omega 84: 160–174. doi:10.1016/j.omega.2018.04.010.
- Torres, F., P. Gil, S. T. Puente, J. Pomares, and R. Aracil. 2004. “Automatic PC Disassembly for Component Recovery.” International Journal of Advanced Manufacturing Technology 23 (1–2): 39–46. doi:10.1007/s00170-003-1590-5.
- Tozanli, O., G. M. Duman, E. Kongar, and S. M. Gupta. 2017. “Environmentally Concerned Logistics Operations in Fuzzy Environment: A Literature Survey.” Logistics 1 (1): 4. doi:10.3390/logistics1010004.
- Udomsawat, G., and S. M. Gupta. 2006. “Controlling Disassembly Line with Multi-Kanban System.” Proceedings of the SPIEInternational Conference on Environmentally Conscious Manufacturing VI: 42–53.
- Waldman, M. 2003. “Durable Goods Theory for Real World Markets.” Journal of Economic Perspectives 17 (1): 131–154. doi:10.1257/089533003321164985.
- Wang, Y., Y. Lin, R. Y. Zhong, and X. Xu. 2019. “IoT-Enabled Cloud-Based Additive Manufacturing Platform to Support Rapid Product Development.” International Journal of Production Research 57 (12): 3975–3991. doi:10.1080/00207543.2018.1516905.
- WEF. 2017. “Impact of the Fourth Industrial Revolution on Supply Chains.” Accessed October 2017. http://www3.weforum.org/docs/WEF_Impact_of_the_Fourth_Industrial_Revolution_on_Supply_Chains_.pdf.
- Wu, C.-H. 2012. “Product-Design and Pricing Strategies with Remanufacturing.” European Journal of Operational Research 222 (2): 204–215. doi:10.1016/j.ejor.2012.04.031.
- Wu, C.-H. 2015. “Strategic and Operational Decisions Under Sales Competition and Collection Competition for End-of-Use Products in Remanufacturing.” International Journal of Production Economics 169: 11–20. doi:10.1016/j.ijpe.2015.07.020.
- Xanthopoulos, A., and E. Iakovou. 2009. “On the Optimal Design of the Disassembly and Recovery Processes.” Waste Management 29 (5): 1702–1711. doi:10.1016/j.wasman.2008.11.009.
- Yin, R., H. Li, and C. S. Tang. 2015. “Optimal Pricing of Two Successive-Generation Products with Trade-in Options Under Uncertainty.” Decision Sciences 46 (3): 565–595. doi:10.1111/deci.12139.
- Zhang, F., and R. Zhang. 2015. “Trade-In Remanufacturing, Strategic Customer Behavior, and Government Subsidies (October 7, 2017).” Available at SSRN. https://ssrn.com/abstract=2571560 or http://dx.doi.org/10.2139/ssrn.2571560.
- Zhou, L., and S. M. Gupta. 2019a. “Marketing Research and Life Cycle Pricing Strategies for New and Remanufactured Products.” Journal of Remanufacturing 9 (1): 29–50. doi:10.1007/s13243-018-0054-x.
- Zhou, L., and S. M. Gupta. 2019b. “A Pricing and Acquisition Strategy for New and Remanufactured High-Technology Products.” Logistics 3 (1): 8. doi:10.3390/logistics3010008.
- Zhou, Z., J. Liu, D. T. Pham, W. Xu, F. J. Ramirez, C. Ji, and Q. Liu. 2019. “Disassembly Sequence Planning: Recent Developments and Future Trends.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 233 (5): 1450–1471. doi:10.1177/0954405418789975.
- Zhu, X., M. Wang, G. Chen, and X. Chen. 2016. “The Effect of Implementing Trade-In Strategy on Duopoly Competition.” European Journal of Operational Research 248 (3): 856–868. doi:10.1016/j.ejor.2015.07.053.