406
Views
7
CrossRef citations to date
0
Altmetric
Articles

Service level improvement due to worker cross training with stochastic worker absence

, , &
Pages 4416-4433 | Received 05 Dec 2019, Accepted 28 Apr 2020, Published online: 28 May 2020

References

  • Altendorfer, Klaus. 2015. “Influence of Lot Size and Planned Lead Time on Service Level and Inventory for a Single-Stage Production System with Advance Demand Information and Random Required Lead Times.” International Journal of Production Economics 170: 478–488. doi:10.1016/j.ijpe.2015.07.030.
  • Altendorfer, Klaus. 2019. “Effect of Limited Capacity on Optimal Planning Parameters for a Multi-Item Production System with Setup Times and Advance Demand Information.” International Journal of Production Research 57 (6): 1892–1913. doi:10.1080/00207543.2018.1511925.
  • Altendorfer, Klaus, and Herbert Jodlbauer. 2011. “An Analytical Model for Service Level and Tardiness in a Single Machine MTO Production System.” International Journal of Production Research 49 (7): 1827–1850. doi:10.1080/00207541003660176.
  • Altendorfer, Klaus, Sonja Strasser, and Andreas Peirleitner. 2019. “Material Requirements Planning Performance Improvement Due to Safety Stock Relaxation.” International Journal on Advances in Systems and Measurements 12 (1&2): 89–100.
  • Bhatnagar, Rohit, Venkatramanaiah Saddikutti, and Anand Rajgopalan. 2007. “Contingent Manpower Planning in a High Clock Speed Industry.” International Journal of Production Research 45 (9): 2051–2072. doi:10.1080/00207540600665802.
  • Brusco, Michael J. 2008. “An Exact Algorithm for a Workforce Allocation Problem with Application to an Analysis of Cross-Training Policies.” IIE Transactions 40 (5): 495–508. doi:10.1080/07408170701598124.
  • Burkard, Rainer, Mauro Dell’Amico, and Silvano Martello. 2012. Assignment Problems. Philadelphia, PA: SIAM (Society for Industrial and Applied Mathematics).
  • Costa, Antonio, Fulvio Antonio Cappadonna, and Sergio Fichera. 2013. “Joint Optimization of a Flow-Shop Group Scheduling with Sequence Dependent Set-Up Times and Skilled Workforce Assignment.” International Journal of Production Research 52 (9): 2696–2728. doi:10.1080/00207543.2014.883469.
  • Dagkakis, Georgios, Anna Rotondo, and Cathal Heavey. 2019. “Embedding Optimization with Deterministic Discrete Event Simulation for Assignment of Cross-Trained Operators. An Assembly Line Case Study.” Computers & Operations Research 111: 99–115. doi:10.1016/j.cor.2019.06.008. doi: 10.1016/j.cor.2019.06.008
  • Dakkak, B., H. Irhirane, and A. Bounit. 2019. “Support Tool to Assit the Choice of Skills for Maintence Intervention Based on Experimental Design.” International Journal for Quality Research 13 (3): 705–720. doi: 10.24874/IJQR13.03-13
  • Deb, Kalyanmoy. 2014. “Multi-objective Optimization.” In Search Methodologies, edited by Edmund K. Burke and Graham Kendall, 403–449. New York, NY: Springer.
  • Deb, K., A. Pratap, S. Agarwal, and T. Meyarivan. 2002. “A Fast and Elitist Multiobjective Genetic Algorithm: NSGA-II.” IEEE Transactions on Evolutionary Computation 6 (2): 182–197. doi:10.1109/4235.996017.
  • de Bruecker, Philippe, Jeroen Beliën, Jorne van den Bergh, and Erik Demeulemeester. 2018. “A Three-Stage Mixed Integer Programming Approach for Optimizing the Skill Mix and Training Schedules for Aircraft Maintenance.” European Journal of Operational Research 267 (2): 439–452. doi:10.1016/j.ejor.2017.11.047.
  • de Bruecker, Philippe, Jorne van den Bergh, Jeroen Beliën, and Erik Demeulemeester. 2015. “Workforce Planning Incorporating Skills: State of the Art.” European Journal of Operational Research 243 (1): 1–16. doi:10.1016/j.ejor.2014.10.038.
  • Dolgui, Alexandre, Hashemi Petroodi, Seyyed Ehsan, Sergey Kovalev, Mikhail Y. Kovalyov, and Simon Thevenin. 2019. “Workforce Planning and Assignment in Mixed-Model Assembly Lines as a Factor of Line Reconfigurability: State of the Art.” IFAC-PapersOnLine 52 (13): 2746–2751. doi: 10.1016/j.ifacol.2019.11.623
  • Eiselt, H. A., and Vladimir Marianov. 2008. “Employee Positioning and Workload Allocation.” Computers & Operations Research 35 (2): 513–524. doi:10.1016/j.cor.2006.03.014.
  • Ernst, A. T., H. Jiang, M. Krishnamoorthy, and D. Sier. 2004. “Staff Scheduling and Rostering. A Review of Applications, Methods and Models.” European Journal of Operational Research 153 (1): 3–27. doi:10.1016/S0377-2217(03)00095-X.
  • Feng, Yuan, and Wenhui Fan. 2014. “A Hybrid Simulation Approach to Dynamic Multi-Skilled Workforce Planning of Production Line.” In 2014 Winter Simulation Conference - (WSC 2014), 1632–1643. Savanah, GA: IEEE (Institute of Electrical and Electronics Engineers).
  • Fırat, Murat, and C. A. J. Hurkens. 2012. “An Improved MIP-Based Approach for a Multi-Skill Workforce Scheduling Problem.” Journal of Scheduling 15 (3): 363–380. doi:10.1007/s10951-011-0245-x.
  • Hopp, Wallace J., and Mark P Oyen. 2004. “Agile Workforce Evaluation. A Framework for Cross-Training and Coordination.” IIE Transactions 36 (10): 919–940. doi:10.1080/07408170490487759.
  • Hopp, Wallace J., and Mark L. Spearman. 2011. Factory Physics. 3rd ed. Long Grove, IL: Waveland.
  • Hopp, Wallace J., Eylem Tekin, and Mark P. Van Oyen. 2004. “Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers.” Management Science 50 (1): 83–98. doi:10.1287/mnsc.1030.0166.
  • Karaesmen, F., J. A. Buzacott, and Y. Dallery. 2002. “Integrating Advance Order Information in Make-to-Stock Production Systems.” IIE Transactions 34 (8): 649–662.
  • Karder, Johannes, Victoria A. Hauder, Andreas Beham, Klaus Altendorfer, and Michael Affenzeller. 2019. “A New Solution Encoding for Simulation-Based Multi-Objective Workforce Qualification Optimization.” In 31st European Modeling and Simulation Symposium (EMSS 2019), edited by Michael Affenzeller, Agostino G. Bruzzone, Francesco Longo, and Guilherme Pereira, 254–261. Lisbon: CAL-TEK S.r.l.
  • McDonald, Thomas, Kimberly P. Ellis, Eileen M. van Aken, and C. Patrick Koelling. 2009. “Development and Application of a Worker Assignment Model to Evaluate a Lean Manufacturing Cell.” International Journal of Production Research 47 (9): 2427–2447. doi:10.1080/00207540701570174.
  • Pinedo, Michael, and Josh Reed. 2013. “The ‘Least Flexible Job First’ Rule in Scheduling and in Queueing.” Operations Research Letters 41 (6): 618–621. doi:10.1016/j.orl.2013.08.009.
  • Ross, G. Terry, and Richard M. Soland. 1975. “A Branch and Bound Algorithm for the Generalized Assignment Problem.” Mathematical Programming 8 (1): 91–103. doi: 10.1007/BF01580430
  • Schober, Andreas, Klaus Altendorfer, Johannes Karder, and Andreas Beham. 2019. “Influence of Workforce Qualification on Service Level in a Flow Shop with Two Lines.” IFAC-PapersOnLine 52 (13): 553–558. doi: 10.1016/j.ifacol.2019.11.216
  • Statistik Austria: Krankenstands-Statistik. 2017. Accessed 15 September, 2019. https://www.statistik.at/web_de/statistiken/menschen_und_gesellschaft/gesundheit/gesundheitszustand/krankenstandstage/index.html.
  • Strasser, Sonja, Klaus Altendorfer, and Andreas Peirleitner. 2018. “Sensitivity Analysis of Simulation Study Results on Safety Stock Relaxation in Material Requirement Planning.” In SIMUL 2018. The Tenth International Conference on Advances in System Simulation, edited by Arash Ramezani, 23–28. Nice, France: IARIA (International Academy, Research and Industry Association).
  • Vairaktarakis, George, and Janice Kim Winch. 1999. “Worker Cross-Training in Paced Assembly Lines.” Manufacturing & Service Operations Management 1 (2): 112–131. doi:10.1287/msom.1.2.112.
  • van den Bergh, Jorne, Jeroen Beliën, Philippe de Bruecker, Erik Demeulemeester, and L. de Boeck. 2013. “Personnel Scheduling. A Literature Review.” European Journal of Operational Research 226 (3): 367–385. doi:10.1016/j.ejor.2012.11.029.
  • Winch, J. K., X. Cai, and G. L. Vairaktarakis. 2007. “Cyclic Job Scheduling in Paced Assembly Lines with Cross-Trained Workers.” International Journal of Production Research 45 (4): 803–828. doi:10.1080/00207540600635144.
  • Zülch, Gert, and Sven Rottinger. 2007. “Approach for Personnel Development Planning Based on the Technology Calendar Concept.” International Journal of Production Economics 105 (1): 273–281. doi:10.1016/j.ijpe.2006.04.018.
  • Zülch, Gert, Sven Rottinger, and Thorsten Vollstedt. 2004. “A Simulation Approach for Planning and Re-Assigning of Personnel in Manufacturing.” International Journal of Production Economics 90 (2): 265–277. doi:10.1016/j.ijpe.2003.11.008.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.