912
Views
11
CrossRef citations to date
0
Altmetric
Articles

Interlocking problems in disassembly sequence planning

ORCID Icon, , , , , , ORCID Icon, ORCID Icon, & show all
Pages 4723-4735 | Received 25 Oct 2019, Accepted 04 May 2020, Published online: 11 Jun 2020

References

  • Barwood, M., J. Li, T. Pringle, and S. Rahimifard. 2015. “Utilisation of Reconfigurable Recycling Systems for Improved Material Recovery 10.13039/501100001809from e-Waste.” Procedia CIRP 29: 746–751. doi:10.1016/j.procir.2015.02.071.
  • Bentaha, M. L., A. Dolgui, O. Battaïa, R. J. Riggs, and J. Hu. 2018. “Profit-oriented Partial Disassembly Line Design: Dealing with Hazardous Parts and Task Processing Times Uncertainty.” International Journal of Production Research 56 (24): 7220–7242. doi: 10.1080/00207543.2017.1418987
  • Bourjault, A. 1984. “Contribution à une approche méthodologique de l’assemblage automatisé: élaboration automatique des séquences opératoires.” Thése d’Etat, Univ. Fr.
  • Cao, H., R. Mo, N. Wan, F. Shang, C. Li, and D. Zhang. 2015. “A Subassembly Identification Method for Truss Structures Manufacturing Based on Community Detection.” Assembly Automation 35 (3): 249–258. doi:10.1108/AA-02-2015-011.
  • Chang, M. M. L., A. Y. C. Nee, and S. K. Ong. 2020. “Interactive AR-Assisted Product Disassembly Sequence Planning (ARDIS).” International Journal of Production Research 1–16. doi:10.1080/00207543.2020.1730462.
  • De Fazio, T., and D. Whitney. 1987. “Simplified Generation of all Mechanical Assembly Sequences.” IEEE Journal on Robotics and Automation 3 (6): 640–658. doi: 10.1109/JRA.1987.1087132
  • De Ron, A. D., and K. Penev. 1995. “Disassembly and Recycling of Electronic Consumer Products: an Overview.” Technovation 15 (6): 363–374. doi: 10.1016/0166-4972(95)96597-M
  • EC. 2012. Manifesto for a resource-efficient Europe.
  • Fang, Y., H. Ming, M. Li, Q. Liu, and D. T. Pham. 2020. “Multi-objective Evolutionary Simulated Annealing Optimisation for Mixed-Model Multi-Robotic Disassembly Line Balancing with Interval Processing Time.” International Journal of Production Research 58 (3): 846–862. doi: 10.1080/00207543.2019.1602290
  • Gil, P., J. Pomares, S. V. T. Puente, C. Diaz, F. Candelas, and F. Torres. 2007. “Flexible Multi-Sensorial System for Automatic Disassembly Using Cooperative Robots.” International Journal of Computer Integrated Manufacturing 20 (8): 757–772. doi:10.1080/09511920601143169.
  • Gong, G., Q. Deng, R. Chiong, X. Gong, H. Huang, and W. Han. 2019. “Remanufacturing-oriented Process Planning and Scheduling: Mathematical Modelling and Evolutionary Optimisation.” International Journal of Production Research 1–19. doi:10.1080/00207543.2019.1634848.
  • Homem de Mello, L. S., and A. C. Sanderson. 1990. “AND/OR Graph Representation of Assembly Plans.” IEEE Transactions on Robotics and Automation 6 (2): 188–199. doi: 10.1109/70.54734
  • Homem de Mello, L. S. H., and A. C. Sanderson. 1991. “A Correct and Complete Algorithm for the Generation of Mechanical Assembly Sequences.” IEEE Transactions on Robotics and Automation 7 (2): 228–240. doi: 10.1109/70.75905
  • Ji, C., D. T. Pham, S. Su, J. Huang, and Y. Wang. 2017. “AUTOREMAN–D. 1.1-List of Generic Disassembly Task Categories.”.
  • Jin, G., W. Li, S. Wang, and S. Gao. 2015. “A Systematic Selective Disassembly Approach for Waste Electrical and Electronic Equipment with Case Study on Liquid Crystal Display Televisions.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture. doi:10.1177/0954405415575476.
  • Jin, G. Q., W. D. Li, and K. Xia. 2013. “Disassembly Matrix for Liquid Crystal Displays Televisions.” Procedia CIRP 11: 357–362. doi:10.1016/j.procir.2013.07.015.
  • Johnson, M. R., and I. P. McCarthy. 2014. “Product Recovery Decisions Within the Context of Extended Producer Responsibility.” Journal of Engineering and Technology Management 34: 9–28. doi: 10.1016/j.jengtecman.2013.11.002
  • Kanehara, T., T. Suzuki, A. Inaba, and S. Okuma. 1993. “On Algebraic and Graph Structural Properties of Assembly Petri net-Searching by Linear Programming.” Proceedings of 1993 IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS’93) 3: 2286–2293. doi: 10.1109/IROS.1993.583945
  • Kim, H.-W., and D.-H. Lee. 2017. “An Optimal Algorithm for Selective Disassembly Sequencing with Sequence-Dependent set-ups in Parallel Disassembly Environment.” International Journal of Production Research 55 (24): 7317–7333. doi: 10.1080/00207543.2017.1342879
  • Kim, H.-W., C. Park, and D.-H. Lee. 2018. “Selective Disassembly Sequencing with Random Operation Times in Parallel Disassembly Environment.” International Journal of Production Research 56 (24): 7243–7257. doi: 10.1080/00207543.2018.1432911
  • Kopacek, P., and G. Kronreif. 1996. “Semi-automated Robotic Disassembling of Personal Computers.” Proceedings 1996 IEEE Conference on Emerging Technologies and Factory Automation. ETFA’96 2 (2): 567–572. doi: 10.1109/ETFA.1996.573938
  • Krikke, H. R., A. van Harten, and P. C. Schuur. 1998. “On a Medium Term Product Recovery and Disposal Strategy for Durable Assembly Products.” International Journal of Production Research 36 (1): 111–140. doi: 10.1080/002075498193967
  • Laili, Y., F. Tao, D. T. Pham, Y. Wang, and L. Zhang. 2019. “Robotic Disassembly re-Planning Using a two-Pointer Detection Strategy and a Super-Fast Bees Algorithm.” Robotics and Computer-Integrated Manufacturing 59: 130–142. doi:10.1016/j.rcim.2019.04.003.
  • Lambert, A. J. D. 2003. “Disassembly Sequencing: a Survey.” International Journal of Production Research 41 (16): 3721–3759. doi: 10.1080/0020754031000120078
  • Li, R., et al. 2020. “Unfastening of Hexagonal Headed Screws by a Collaborative Robot.” IEEE Transactions on Automation Science and Engineering. doi:10.1109/TASE.2019.2958712.
  • Li, J. R., L. P. Khoo, and S. B. Tor. 2002. “A Novel Representation Scheme for Disassembly Sequence Planning.” The International Journal of Advanced Manufacturing Technology 20 (8): 621–630. doi: 10.1007/s001700200199
  • Liu, M., X. Liu, F. Chu, F. Zheng, and C. Chu. 2019a. “Robust Disassembly Line Balancing with Ambiguous Task Processing Times.” International Journal of Production Research 1–30. doi:10.1080/00207543.2019.1659520.
  • Liu, Q., Z. Liu, W. Xu, Q. Tang, Z. Zhou, and D. T. Pham. 2019b. “Human-robot Collaboration in Disassembly for Sustainable Manufacturing.” International Journal of Production Research 57 (12): 4027–4044. doi:10.1080/00207543.2019.1578906.
  • Liu, J., Z. Zhou, D. T. Pham, W. Xu, C. Ji, and Q. Liu. 2018. “Robotic Disassembly Sequence Planning Using Enhanced Discrete Bees Algorithm in Remanufacturing.” International Journal of Production Research 56 (9): 3134–3151. doi:10.1080/00207543.2017.1412527.
  • Maiyar, L. M., S. Singh, V. Prabhu, and M. K. Tiwari. 2019. “Part Segregation Based on Particle Swarm Optimisation for Assembly Design in Additive Manufacturing.” International Journal of Computer Integrated Manufacturing 32 (7): 705–722. doi:10.1080/0951192X.2019.1610577.
  • Matsumoto, M., and W. Ijomah. 2013. “Remanufacturing.” In Handbook of Sustainable Engineering, edited by Joanne Kauffman and Kun-Mo Lee, 389–408. Dordrecht: Springer Netherlands.
  • Navtn-Chandra, D. 1994. “The Recovery Problem in Product Design.” Journal of Engineering Design 5 (1): 65–86. doi: 10.1080/09544829408907873
  • Ong, N. S., and Y. C. Wong. 1999. “Automatic Subassembly Detection from a Product Model for Disassembly Sequence Generation.” The International Journal of Advanced Manufacturing Technology 15 (6): 425–431. doi:10.1007/s001700050086.
  • Özceylan, E., C. B. Kalayci, A. Güngör, and S. M. Gupta. 2019. “Disassembly Line Balancing Problem: A Review of the State of the art and Future Directions.” International Journal of Production Research 57 (15-16): 4805–4827. doi: 10.1080/00207543.2018.1428775
  • Pham, D. T., and M. Castellani. 2009. “The Bees Algorithm: Modelling Foraging Behaviour to Solve Continuous Optimization Problems.” Proceedings of the Institution of Mechanical Engineers, Part C: Journal of Mechanical Engineering Science 223 (12): 2919–2938.
  • Pham, D. T., A. Ghanbarzadeh, E. Koç, S. Otri, S. Rahim, and M. Zaidi. 2006. “The Bees Algorithm—a Novel Tool for Complex Optimisation Problems.” In Intelligent Production Machines and Systems, edited by D. T. Pham, E. E. Eldukhri, and A. J. Soroka, 454–459. Elsevier.
  • Pnueli, Y., and E. Zussman. 1997. “Evaluating the end-of-Life Value of a Product Andimproving it by Redesign.” International Journal of Production Research 35 (4): 921–942. doi:10.1080/002075497195452.
  • Romero-Silva, R., and E. Marsillac. 2019. “Trends and Topics in IJPR from 1961 to 2017: A Statistical History.” International Journal of Production Research 57 (15-16): 4692–4718. doi: 10.1080/00207543.2018.1551638
  • Rosa, P., C. Sassanelli, A. Urbinati, D. Chiaroni, and S. Terzi. 2020. “Assessing Relations between Circular Economy and Industry 4.0: A Systematic Literature Review.” International Journal of Production Research 58 (6): 1662–1687. doi: 10.1080/00207543.2019.1680896
  • Smith, S., and W.-H. Chen. 2009. Rule-Based Recursive Selective Disassembly Sequence Planning for Green Design. London: Springer. pp. 291–302.
  • Smith, S., and P.-Y. Hung. 2015. “A Novel Selective Parallel Disassembly Planning Method for Green Design.” Journal of Engineering Design 26 (10-12): 283–301. doi:10.1080/09544828.2015.1045841.
  • Smith, S., G. Smith, and W.-H. Chen. 2012. “Disassembly Sequence Structure Graphs: An Optimal Approach for Multiple-Target Selective Disassembly Sequence Planning.” Advanced Engineering Informatics 26 (2): 306–316. doi:10.1016/j.aei.2011.11.003.
  • Tao, F., L. Bi, Y. Zuo, and A. Y. C. Nee. 2018. “Partial/Parallel Disassembly Sequence Planning for Complex Products.” Journal of Manufacturing Science and Engineering 140 (1): 011016. doi: 10.1115/1.4037608
  • Torres, F., S. T. Puente, and R. Aracil. 2003. “Disassembly Planning Based on Precedence Relations among Assemblies.” The International Journal of Advanced Manufacturing Technology 21 (5): 317–327. doi: 10.1007/s001700300037
  • Vongbunyong, S., and W. H. Chen. 2015. Disassembly Automation.
  • Wang, Y., and J. Liu. 2013. “Subassembly Identification for Assembly Sequence Planning.” The International Journal of Advanced Manufacturing Technology 68 (1-4): 781–793. doi:10.1007/s00170-013-4799-y.
  • Wang, L., X. Xu, R. Gao, and A. Y. C. Nee. 2019. “Sustainable Cybernetic Manufacturing.” International Journal of Production Research 57 (12): 3799–3801. doi:10.1080/00207543.2019.1598153.
  • Yuan, Z., J. Bi, and Y. Moriguichi. 2006. “The Circular Economy: A New Development Strategy in China.” Journal of Industrial Ecology 10 (1-2): 4–8. doi:10.1162/108819806775545321.
  • Zhao, S., and Y. Li. 2010. “Disassembly Sequence Decision Making for Products Recycling and Remanufacturing Systems.” 2010 International Symposium on Computational Intelligence and Design, 44–48. doi:10.1109/ISCID.2010.19.
  • Zheng, F., J. He, F. Chu, and M. Liu. 2018. “A new Distribution-Free Model for Disassembly Line Balancing Problem with Stochastic Task Processing Times.” International Journal of Production Research 56 (24): 7341–7353. doi: 10.1080/00207543.2018.1430909
  • Zhu, L., Z. Zhang, and Y. Wang. 2018. “A Pareto Firefly Algorithm for Multi-Objective Disassembly Line Balancing Problems with Hazard Evaluation.” International Journal of Production Research 56 (24): 7354–7374. doi: 10.1080/00207543.2018.1471238

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.