690
Views
7
CrossRef citations to date
0
Altmetric
Articles

A reactive scheduling method for disturbances in aircraft moving assembly line

, , &
Pages 4756-4772 | Received 27 Oct 2019, Accepted 12 May 2020, Published online: 03 Jun 2020

References

  • Banerjee, A. G., W. Yund, D. Yang, et al. 2015. “A Hybrid Statistical Method for Accurate Prediction of Supplier Delivery Times of Aircraft Engine Parts.” ASME International Design Engineering Technical Conferences and Computers and Information in Engineering Conference, Boston, USA, 286-295.
  • Borreguero, T., A. García, and M. Ortega. 2015. “Scheduling in the Aeronautical Industry Using a Mixed Integer Linear Problem Formulation.” Procedia Engineering 132: 982–989. doi: 10.1016/j.proeng.2015.12.586
  • Bruni, M., L. Pugliese, P. Beraldi, et al. 2018. “A Computational Study of Exact Approaches for the Adjustable Robust Resource-Constrained Project Scheduling Problem.” Computers & Operations Research 99: 178–190. doi: 10.1016/j.cor.2018.06.016
  • Cai, H., M. Dai, and T. Yu. 2014. “Material Coding for Aircraft Manufacturing Industry.” Journal of Aerospace Technology & Management 6 (2): 183–191. doi: 10.5028/jatm.v6i2.315
  • Chakrabortty, R. K., R. A. Sarker, and D. L. Essam. 2016. “Multi-mode Resource Constrained Project Scheduling Under Resource Disruptions.” Computers & Chemical Engineering 88: 13–29. doi: 10.1016/j.compchemeng.2016.01.004
  • Chakrabortty, R. K., R. A. Sarker, and D. L. Essam. 2017. “Resource Constrained Project Scheduling with Uncertain Activity Durations.” Computers & Industrial Engineering 112: 537–550. doi: 10.1016/j.cie.2016.12.040
  • Chen, M. C., C. C. Hsu, B. Malhotra, et al. 2016. “An Efficient ICA-DW-SVDD Fault Detection and Diagnosis Method for non-Gaussian Processes.” International Journal of Production Research 54 (17): 5208–5218. doi: 10.1080/00207543.2016.1161250
  • Dolgui, A., and J.-M. Proth. 2010. Supply Chain Engineering: Useful Methods and Techniques. New York: Springer.
  • Duan, L., M. Xie, T. Bai, et al. 2016. “A new Support Vector Data Description Method for Machinery Fault Diagnosis with Unbalanced Datasets.” Expert Systems with Applications 64: 239–246. doi: 10.1016/j.eswa.2016.07.039
  • Elloumi, S., P. Fortemps, and T. Loukil. 2017. “Multi-objective Algorithms to Multi-Mode Resource-Constrained Projects Under Mode Change Disruption.” Computers & Industrial Engineering 106: 161–173. doi: 10.1016/j.cie.2017.01.029
  • Hurink, J. L., A. L. Kok, J. J. Paulus, et al. 2011. “Time-constrained Project Scheduling with Adjacent Resources.” Computers & Operations Research 38 (1): 310–319. doi: 10.1016/j.cor.2010.05.006
  • Jimenez, J. F., A. Bekrar, G. Zambranorey, et al. 2017. “Pollux: a Dynamic Hybrid Control Architecture for Flexible job Shop Systems.” International Journal of Production Research 55 (15): 4229–4247. doi: 10.1080/00207543.2016.1218087
  • Jun, S., S. Lee, and H. Chun. 2019. “Learning Dispatching Rules Using Random Forest in Flexible job Shop Scheduling Problems.” International Journal of Production Research 57 (10): 3290–3310. doi: 10.1080/00207543.2019.1581954
  • Kamoun, H., and C. Sriskandarajah. 1993. “The Complexity of Scheduling Jobs in Repetitive Manufacturing Systems.” European Journal of Operational Research 70 (3): 350–364. doi: 10.1016/0377-2217(93)90247-K
  • Lamas, P., and E. Demeulemeester. 2016. “A Purely Proactive Scheduling Procedure for the Resource-Constrained Project Scheduling Problem with Stochastic Activity Durations.” Journal of Scheduling 19 (4): 409–428. doi: 10.1007/s10951-015-0423-3
  • Li, Y. 2017. “The Type-II Assembly Line Rebalancing Problem Considering Stochastic Task Learning.” International Journal of Production Research 55 (24): 7334–7355. doi: 10.1080/00207543.2017.1346316
  • Li, Y., and T. O. Boucher. 2017. “Assembly Line Balancing Problem with Task Learning and Dynamic Task Reassignment.” International Journal of Advanced Manufacturing Technology 88 (9-12): 3089–3097. doi: 10.1007/s00170-016-9014-5
  • Lu, Z., H. Zhu, X. Han, et al. 2019. “Integrated Modelling and Algorithm of Material Delivery and Line-Side Storage for Aircraft Moving Assembly Lines.” International Journal of Production Research 57 (18): 5842–5856. doi: 10.1080/00207543.2018.1554917
  • Mei, Z., Y. Liu, and M. Younus. 2011. “Material Delivery System for Aircraft Composite Component Manufacturing Workshop.” Lecture Notes in Engineering & Computer Science 2: 1097–1102.
  • Nasiri, M. M., R. Yazdanparast, and F. Jolai. 2017. “A Simulation Optimisation Approach for Real-Time Scheduling in an Open Shop Environment Using a Composite Dispatching Rule.” International Journal of Computer Integrated Manufacturing 30 (46): 1239–1252. doi: 10.1080/0951192X.2017.1307452
  • Parente, M., G. Figueira, P. Amorim, et al. 2020. “Production Scheduling in the Context of Industry 4.0: Review and Trends.” International Journal of Production Research, doi:10.1080/00207543.2020.1718794.
  • Ren, Y., and Z. Lu. 2019. “A Flexible Resource Investment Problem Based on Project Splitting for Aircraft Moving Assembly Line.” Assembly Automation 39 (4): 532–547. doi: 10.1108/AA-09-2018-0126
  • Shan, S., Z. Hu, Z. Liu, et al. 2017. “An Adaptive Genetic Algorithm for Demand-Driven and Resource-Constrained Project Scheduling in Aircraft Assembly.” Information Technology & Management 18 (1): 41–53. doi: 10.1007/s10799-015-0223-7
  • Sobeyko, O., and L. Mönch. 2016. “Heuristic Approaches for Scheduling Jobs in Large-Scale Flexible job Shops.” Computers & Operations Research 68: 97–109. doi: 10.1016/j.cor.2015.11.004
  • Verbeeck, C., V. V. Peteghem, M. Vanhoucke, et al. 2017. “A Metaheuristic Solution Approach for the Time-Constrained Project Scheduling Problem.” Or Spectrum 39 (2): 1–19. doi: 10.1007/s00291-016-0458-7
  • Vonder, S. V. D., E. Demeulemeester, and W. Herroelen. 2008. “Proactive Heuristic Procedures for Robust Project Scheduling: an Experimental Analysis.” European Journal of Operational Research 189 (3): 723–733. doi: 10.1016/j.ejor.2006.10.061
  • Weigl, E., W. Heidl, E. Lughofer, et al. 2016. “On Improving Performance of Surface Inspection Systems by Online Active Learning and Flexible Classifier Updates.” Machine Vision and Applications 27: 103–127. doi: 10.1007/s00138-015-0731-9
  • Zadeh, M. S., Y. Katebi, and A. Doniavi. 2019. “A Heuristic Model for Dynamic Flexible job Shop Scheduling Problem Considering Variable Processing Times.” International Journal of Production Research 57 (10): 3020–3035. doi: 10.1080/00207543.2018.1524165
  • Zhang, Y., X. Hu, and C. Wu. 2019. “Improved Imperialist Competitive Algorithms for Rebalancing Multi-Objective two-Sided Assembly Lines with Space and Resource Constraints.” International Journal of Production Research, doi:10.1080/00207543.2019.1633023.
  • Zheng, Y., D. Han, Y. Ni, et al. 2014. “Research and Application of Bottom-up Route-Based Product Data Conformity Inspection Approach for Civil Aircraft.” International Journal of Computer Integrated Manufacturing 27 (6): 591–607. doi: 10.1080/0951192X.2013.834464
  • Zhou, B., and J. Xu. 2017. “An Adaptive SVM-Based Real-Time Scheduling Mechanism and Simulation for Multiple-Load Carriers in Automobile Assembly Lines.” International Journal of Modeling Simulation & Scientific Computing 8 (4): 1–24.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.