932
Views
6
CrossRef citations to date
0
Altmetric
Research Articles

Measuring sequence stability in automotive production lines

, &
Pages 7336-7356 | Received 29 Oct 2019, Accepted 23 Jun 2020, Published online: 23 Jul 2020

References

  • Alden, J. M., L. D. Burns, T. Costy, R. D. Hutton, C. A. Jackson, D. S. Kim, K. A. Kohls, J. H. Owen, M. A. Turnquist, and D. J. V. Veen. 2006. “General Motors Increases Its Production Throughput.” Interfaces 36: 6–25. doi: 10.1287/inte.1050.0181
  • Amrina, E., and S. M. Yusof. 2011. “Key Performance Indicators for Sustainable Manufacturing Evaluation in Automotive Companies.” In 2011 IEEE International Conference on Industrial Engineering and Engineering Management, edited by G. Zaiyi, 1093–1097. IEEE.
  • Beuthner, A. 2018. “Profitieren von der Perlenkette.” Automobil-Produktion 4: 54–55.
  • Bourne, M., M. Franco-Santos, P. Micheli, and A. Pavlov. 2018. “Performance Measurement and Management: A System of Systems Perspective.” International Journal of Production Research 56: 2788–2799. doi: 10.1080/00207543.2017.1404159
  • Bourne, M., J. Mills, M. Wilcox, A. Neely, and K. Platts. 2000. “Designing, Implementing and Updating Performance Measurement Systems.” International Journal of Operations & Production Management 20: 754–771. doi: 10.1108/01443570010330739
  • Boysen, N., S. Emde, M. Hoeck, and M. Kauderer. 2015. “Part Logistics in the Automotive Industry: Decision Problems, Literature Review and Research Agenda.” European Journal of Operational Research 242: 107–120. doi: 10.1016/j.ejor.2014.09.065
  • Boysen, N., M. Fliedner, and A. Scholl. 2008. “Assembly Line Balancing: Which Model to Use When?” International Journal of Production Economics 111: 509–528. doi: 10.1016/j.ijpe.2007.02.026
  • Boysen, N., M. Fliedner, and A. Scholl. 2009. “Sequencing Mixed-model Assembly Lines: Survey, Classification and Model Critique.” European Journal of Operational Research 192: 349–373. doi: 10.1016/j.ejor.2007.09.013
  • Boysen, N., A. Scholl, and N. Wopperer. 2012. “Resequencing of Mixed-model Assembly Lines: Survey and Research Agenda.” European Journal of Operational Research 216: 594–604. doi: 10.1016/j.ejor.2011.08.009
  • Cedillo-Campos, M. G., D. Morones Ruelas, G. Lizarraga-Lizarraga, J. Gonzalez-Feliu, and J. A. Garza-Reyes. 2017. “Decision Policy Scenarios for Just-in-Sequence (JIS) Deliveries.” Journal of Industrial Engineering and Management 10: 581. doi: 10.3926/jiem.2090
  • Colledani, M., and T. Tolio. 2011. “Integrated Analysis of Quality and Production Logistics Performance in Manufacturing Lines.” International Journal of Production Research 49: 485–518. doi: 10.1080/00207540903443246
  • Das, S. K., and M. K. Pasan. 2016. “Design and Methodology of Automated Guided Vehicle – a Review.” IOSR Journal of Mechanical and Civil Engineering Special Issue -- AETM' 16: 29–35.
  • de Toni, A., and S. Tonchia. 1996. “Lean Organization, Management by Process and Performance Measurement.” International Journal of Operations & Production Management 16: 221–236. doi: 10.1108/01443579610109947
  • Dössel, K. F. 2008. “In-Plant Repairs.” In Automotive Paints and Coatings. 2nd ed., edited by H.J. Streitberger, K.F. Dössel, 377–380. John Wiley & Sons.
  • Fecht, N. 2011. “Das Prinzip Perlenkette Porsche.” Automobil Produktion 11: 24–25.
  • Feng, W., L. Zheng, and J. Li. 2012. “Scheduling Policies in Multi-product Manufacturing Systems with Sequence-dependent Setup Times and Finite Buffers.” International Journal of Production Research 50: 7479–7492. doi: 10.1080/00207543.2011.653455
  • Fournier, X., and B. Agard. 2007. “Improvement of Earliness and Lateness by Postponement on an Automotive Production Line.” International Journal of Flexible Manufacturing Systems 19: 107–121. doi: 10.1007/s10696-007-9022-8
  • Gehr, F., and B. Hellingrath. 2007. “Vorwort.” In Logistik in der Automobilindustrie: Innovatives Supply Chain Management für wettbewerbsfähige Zulieferstrukturen, edited by F. Gehr, B. Hellingrath, VII–VIII. Berlin: Springer-Verlag. VDI-Buch.
  • Gershwin, S. B., and I. C. Schick. 1983. “Modeling and Analysis of Three-stage Transfer Lines with Unreliable Machines and Finite Buffers.” Operations Research 31: 354–380. doi: 10.1287/opre.31.2.354
  • Göpfert, I., M. Schulz, and W. Wellbrock. 2017. “Trends in der Automobillogistik.” In Automobillogistik: Stand und Zukunftstrends. 3 ed. edited by I. Göpfert, D. Braun, M. Schulz, 1–21. Wiesbaden: Springer Gabler.
  • Grinninger, J. 2012. Schlanke Produktionssteuerung zur Stabilisierung von Auftragsfolgen in der Automobilproduktion. München: FML, Lehrstuhl für Fördertechnk Materialfluss Logistik.
  • Grinninger, J., and S. Meißner. 2006. “Früh in Reih und Glied.” Automobil Produktion 11: 54–57.
  • Günther, M. T. 2017. Produktionssteuerung nach dem Perlenketten-Prinzip am Beispiel der Automobilfertigung. Jena: Friedrich-Schiller-Universität Jena.
  • Gusikhin, O., R. Caprihan, and K. E. Stecke. 2007. “Least in-Sequence Probability Heuristic for Mixed-volume Production Lines.” International Journal of Production Research 46: 647–673. doi: 10.1080/00207540600824300
  • Han, M. S., and D. J. Park. 2002. “Optimal Buffer Allocation of Serial Production Lines with Quality Inspection Machines.” Computers & Industrial Engineering 42: 75–89. doi: 10.1016/S0360-8352(02)00004-9
  • Hottenrott, A., and M. Grunow. 2019. “Flexible Layouts for the Mixed-model Assembly of Heterogeneous Vehicles.” OR Spectrum 41: 943–979. doi: 10.1007/s00291-019-00556-x
  • Ilić, O. R. 1994. “Analysis of the Number of Automated Guided Vehicles Required in Flexible Manufacturing Systems.” The International Journal of Advanced Manufacturing Technology 9: 382–389. doi: 10.1007/BF01748483
  • Inman, R. R. 2003. “ASRS Sizing for Recreating Automotive Assembly Sequences.” International Journal of Production Research 41: 847–863. doi: 10.1080/0020754031000069599
  • Inman, R. R., and D. Gonsalvez. 1997. “The Causes of Schedule Instability in an Automotive Supply Chain.” Production and Inventory Management Journal 38: 26–31.
  • Juran, M. J. 1999. “How to Think About Quality.” In Juran's Quality Handbook. 5th ed. edited by M.J. Juran, A.B. Godfrey. number 8, 2.1–2.18. New York, NY: McGraw-Hill.
  • Kern, W., H. Lämmermann, and T. Bauernhansl. 2017. “An Integrated Logistics Concept for a Modular Assembly System.” Procedia Manufacturing 11: 957–964. doi: 10.1016/j.promfg.2017.07.200
  • Kotha, S., and B. J. Pine. 1994. “Mass Customization: The New Frontier in Business Competition.” The Academy of Management Review 19: 588.
  • Kuhnert, F., C. Stürmer, and A. Koster. 2018. “Five Trends Transforming the Automotive Industry.” https://eu-smartcities.eu/sites/default/files/2018-03.pdf.
  • Lahmar, M., H. Ergan, and S. Benjaafar. 2003. “Resequencing and Feature Assignment on an Automated Assembly Line.” IEEE Transactions on Robotics and Automation 19: 89–102. doi: 10.1109/TRA.2002.807556
  • Lehmann, M., and H. Kuhn. 2019. “Modeling and Analyzing Sequence Stability in Flexible Automotive Production Systems.” Flexible Services and Manufacturing Journal 192: 349–368.
  • Li, J. 2013. “Continuous Improvement at Toyota Manufacturing Plant: Applications of Production Systems Engineering Methods.” International Journal of Production Research 51: 7235–7249. doi: 10.1080/00207543.2012.753166
  • Li, J., D. E. Blumenfeld, N. Huang, and J. M. Alden. 2009. “Throughput Analysis of Production Systems: Recent Advances and Future Topics.” International Journal of Production Research 47: 3823–3851. doi: 10.1080/00207540701829752
  • Li, J., D. E. Blumenfeld, and S. P. Marin. 2008. “Production System Design for Quality Robustness.” IIE Transactions 40: 162–176. doi: 10.1080/07408170601013661
  • Lovgren, R. H., and M. J. Racer. 2000. “Algorithms for Mixed-model Sequencing with Due Date Restrictions.” European Journal of Operational Research 120: 408–422. doi: 10.1016/S0377-2217(99)00091-0
  • Meissner, S. 2009. Logistische Stabilität in der automobilen Variantenfließfertigung. München: Technische Universität München.
  • Meissner, S. 2010. “Controlling Just-in-Sequence Flow-production.” Logistics Research 2: 45–53. doi: 10.1007/s12159-010-0026-5
  • Meyr, H. 2004. “Supply Chain Planning in the German Automotive Industry.” OR Spectrum 26: 343–365. doi: 10.1007/s00291-004-0168-4
  • Michalos, G., S. Makris, N. Papakostas, D. Mourtzis, and G. Chryssolouris. 2010. “Automotive Assembly Technologies Review: Challenges and Outlook for a Flexible and Adaptive Approach.” CIRP Journal of Manufacturing Science and Technology 2: 81–91. doi: 10.1016/j.cirpj.2009.12.001
  • Müller, M., and U. Burges. 2020. “Herausforderungen bei der Dimensionierung eines zentralen Entkopplungsmoduls in der Variantenfließfertigung und Darstellung eines selbstregulierenden Kreislaufsystems für Transportmittel.” In Ablaufsimulation in der Automobilindustrie, edited by G. Mayer, C. Pöge, S. Spieckermann, S. Wenzel, 217–229. Springer Vieweg. in Springer Fachmedien Wiesbaden GmbH.
  • Müller, M., and H. Kuhn. 2020. “Analyzing a Centralized Buffer in Automotive Production Plants – a Simulation Study.” In 49th International Conference on Computers and Industrial Engineering 2019 (CIE49), edited by X. Xu, M.I. Dessouky, R.Y. Zhong, 455–463. Computers and Industrial Engineering.
  • Neely, A., and K. Plats. 2005. “Performance Measurement System Design: A Literature Review and Research Agenda.” International Journal of Operations & Production Management 25: 1228–1263. doi: 10.1108/01443570510633648
  • Papadopoulos, H. T., and M. I. Vidalis. 2001. “Minimizing Wip Inventory in Reliable Production Lines.” International Journal of Production Economics 70: 185–197. doi: 10.1016/S0925-5273(00)00056-6
  • Robinson, L. W., J. O. McClain, and L. J. Thomas. 1990. “The Good, the Bad and the Ugly: Quality on an Assembly Line.” International Journal of Production Research 28: 963–980. doi: 10.1080/00207549008942767
  • Rumpelt, T. 2009. “Paradox: Stabil und Flexibel.” Automobil Produktion 23: 34.
  • Rumpelt, T. 2010. “Prinzip Perlenkette.” Automobil Produktion 5: 28–29.
  • Savsar, M., and A. Al-Jawini. 1995. “Simulation Analysis of Just-in-Time Production Systems.” International Journal of Production Economics 42: 67–78. doi: 10.1016/0925-5273(95)00166-2
  • Shin, H. 2000. “Supply Management Orientation and Supplier/Buyer Performance.” Journal of Operations Management 18: 317–333. doi: 10.1016/S0272-6963(99)00031-5
  • Standl, M. J. 2016. Daimler knüpft Perlenkette. Deutsche Verkehrs-Zeitung 30.
  • Wagner, S. M., and V. Silveira-Camargos. 2012. “Managing Risks in Just-in-Sequence Supply Networks: Exploratory Evidence From Automakers.” IEEE Transactions on Engineering Management 59: 52–64. doi: 10.1109/TEM.2010.2087762
  • Weyer, M. 2002. Das Produktionssteuerungskonzept Perlenkette und dessen Kennzahlensystem. Karlsruhe: Helmesverl.
  • Weyer, M., and D. Spath. 2001. “Das Kennzahlensystem des Produktionssteuerungskonzepts Perlenkette: Chance zur verursachergerechten Ermittlung von Logistikkosten.” Zeitschrift für wirtschaftlichen Fabrikbetrieb 96: 116–119. doi: 10.3139/104.100390
  • Weyer, M., and D. Spath. 2009. “The Production Control Concept “Pearl-chain” – Challenges and recommendations for implementing it.” ZWF Zeitschrift für wirtschaftlichen Fabrikbetrieb 104: 1126–1130. doi: 10.3139/104.110224
  • Zeltzer, L., E. H. Aghezzaf, and V. Limère. 2016. “Workload Balancing and Manufacturing Complexity Levelling in Mixed-model Assembly Lines.” International Journal of Production Research 55: 2829–2844. doi: 10.1080/00207543.2016.1213452

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.