750
Views
14
CrossRef citations to date
0
Altmetric
Articles

Maintenance scheduling for flexible multistage manufacturing systems with uncertain demands

, &
Pages 5831-5843 | Received 26 Nov 2019, Accepted 28 Jun 2020, Published online: 28 Jul 2020

References

  • Ao, Y., H. Zhang, and C. Wang. 2019. “Research of Integrated Decision Model for Production Scheduling and Maintenance Planning with Economic Objective.” Computers and Industrial Engineering 137: 1–9.
  • Avalos-Rosales, O., F. Angel-Bello, A. Alvarez, and Y. Cardona-Valdes. 2018. “Including Preventive Maintenance Activities in an Unrelated Parallel Machine Environment with Dependent Setup Times.” Computers and Industrial Engineering 123: 364–377.
  • Bahria, N., A. Chelbi, H. Bouchriha, and I. H. Dridi. 2019. “Integrated Production, Statistical Process Control, and Maintenance Policy for Unreliable Manufacturing Systems.” International Journal of Production Research 57 (8): 2548–2570.
  • Chen, R., and S. Velusamy. 2010. “The Storage Location Assignment and Interleaving Problem in an Automated Storage/Retrieval System with Shared Storage.” International Journal of Production Research 48 (4): 991–1011.
  • Colledani, M., and T. Tolio. 2012. “Integrated Quality, Production Logistics and Maintenance Analysis of Multi-Stage Asynchronous Manufacturing Systems with Degrading Machines.” CIRP Annals – Manufacturing Technology 61: 455–458.
  • Cui, W., Z. Lu, C. Li, and X. Han. 2018. “A Proactive Approach to Solve Integrated Production Scheduling and Maintenance Planning Problem in Flow Shops.” Computers and Industrial Engineering 115: 342–353.
  • Dao, C., and M. Zuo. 2017. “Optimal Selective Maintenance for Multi-State Systems in Variable Loading Conditions.” Reliability Engineering and System Safety 166: 171–180.
  • He, Y., C. Gu, Z. Chen, and X. Han. 2017. “Integrated Predictive Maintenance Strategy for Manufacturing Systems by Combining Quality Control and Mission Reliability Analysis.” International Journal of Production Research 55 (19): 5841–5862.
  • Hu, J., Z. Jiang, and H. Liao. 2017. “Preventive Maintenance of a Single Machine System Working Under Piecewise Constant Operating Condition.” Reliability Engineering and System Safety 168: 105–115.
  • Kang, K., and V. Subramaniam. 2018. “Integrated Control Policy of Production and Preventive Maintenance for a Deteriorating Manufacturing System.” Computers and Industrial Engineering 118: 266–277.
  • Lanza, G., S. Niggeschmidt, and P. Werner. 2009. “Optimization of Preventive Maintenance and Spare Part Provision for Machine Tools Based on Variable Operational Conditions.” Reliability Engineering and Systems Safety 58 (1): 429–432.
  • Li, G., H. Zhu, J. He, K. Wu, and Y. Jia. 2019. “Application of Power law Model in Reliability Evaluation of Machine Tools by Considering Working Condition Difference.” Quality and Reliability Engineering International 35 (1): 136–145.
  • Liu, Y., Y. Chen, and T. Jiang. 2018. “On Sequence Planning for Selective Maintenance of Multi-State Systems Under Stochastic Maintenance Durations.” European Journal of Operational Research 268 (1): 113–127.
  • Liu, H., and V. Makis. 1996. “Cutting-tool Reliability Assessment in Variable Machining Conditions.” IEEE Transactions on Reliability 45 (4): 573–581.
  • Lu, X., M. Chen, and M. Liu. 2012. “Optimal Imperfect Periodic Preventive Maintenance for Systems in Time-Varying Environments.” IEEE Transactions on Reliability 61 (2): 426–439.
  • Mohammad, M., and O. Salih. 2012. “Optimal Joint Maintenance and Operation Policies to Maximize Overall Systems Effectiveness.” International Journal of Production Research 51 (5): 1319–1330.
  • Nourelfath, M., M. Fitouhi, and M. Machiani. 2010. “An Integrated Model for Production and Preventive Maintenance Planning in Multi-State Systems.” IEEE Transactions on Reliability 59 (3): 496–506.
  • Nourelfath, M., and F. Yalaoui. 2012. “Integrated Load Distribution and Production Planning Inseries-Parallel Multi-State Systems with Failure Rate Depending on Load.” Reliability Engineering and System Safety 106: 138–145.
  • Rezaei-Malek, M., A. Siadat, J. Y. Dantan, and R. Tavakkoli-Moghaddam. 2019. “A Trade-off Between Productivity and Cost for the Integrated Part Quality Inspection and Preventive Maintenance Planning Under Uncertainty.” International Journal of Production Research 57 (19): 5951–5973.
  • Syamsundar, A., and V. N. Achutha. 2011. “Imperfect Repair Proportional Intensity Models for Maintained Systems.” IEEE Transactions on Reliability 60 (4): 782–787.
  • Tail, M., S. Yacout, and M. Balazinski. 2010. “Replacement Time of a Cutting Tool Subject to Variable Speed. Proceedings of the Institution of Mechanical Engineers.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 224 (3): 373–383.
  • Thomas, A. M., and S. Refik. 1989. “Assessment of Machine Tool Reliability Using a Proportional Hazards Model.” Naval Research Logistics 36 (6): 765–777.
  • Wang, X., L. Li, and M. Xie. 2019. “Optimal Preventive Maintenance Strategy for Leased Equipment Under Successive Usage-Based Contracts.” International Journal of Production Research 57 (18): 5705–5724.
  • Wu, S., and I. T. Castro. 2020. “Maintenance Policy for a System with a Weighted Linear Combination of Degradation Processes.” European Journal of Operational Research 280 (1): 124–133.
  • Wu, C., Y. Yao, S. Dauzère-Pérès, and C. Yu. 2020. “Dynamic Dispatching and Preventive Maintenance for Parallel Machines with Dispatching-Dependent Deterioration.” Computers and Industrial Engineering, doi:10.1016/j.cor.2019.104779.
  • Xia, T., L. Xi, X. Zhou, and J. Lee. 2012. “Dynamic Maintenance Decision-Making for Series-Parallel Manufacturing System Based on MAM-MTW Methodology.” European Journal of Operational Research 221 (1): 231–240.
  • Xiao, L., S. Song, X. Chen, and D. Coit. 2016. “Joint Optimization of Production Scheduling and Machine Group Preventive Maintenance.” Reliability Engineering and System Safety 146: 68–78.
  • You, M., H. Li, and G. Meng. 2011. “Control-limit Preventive Maintenance Policies Forcomponents Subject to Imperfect Preventive Maintenance and Variable Operationalconditions.” Reliability Engineering and System Safety 96 (5): 590–598.
  • Yuan, F., and U. Kumar. 2013. “Proportional Intensity Model Considering Imperfect Repair for Repairable Systems.” International Journal of Performability Engineering 9 (2): 163–174.
  • Zhou, X., and B. Lu. 2018. “Preventive Maintenance Scheduling for Serial Multi-Station Manufacturing Systems with Interaction Between Station Reliability and Product Quality.” Computers and Industrial Engineering 122: 283–291.
  • Zhou, X., and K. Shi. 2019. “Capacity Failure Rate Based Opportunistic Maintenance Modeling for Series-Parallel Multi-Station Manufacturing Systems.” Reliability Engineering and System Safety 181: 46–53.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.