Workforce reconfiguration strategies in manufacturing systems: a state of the art

, ORCID Icon, , &
Pages 6721-6744 | Received 05 Apr 2020, Accepted 30 Aug 2020, Published online: 13 Oct 2020

References

  • Ahn, H. S., I. Duenyas, and M. E. Lewis. 2002. “Optimal Control of a two-Stage Tandem Queuing System with Flexible Servers.” Probability in the Engineering and Informational Sciences 16 (4): 453–469.
  • Ahn, H.-S., and R. Righter. 2006. “Dynamic Load Balancing with Flexible Workers.” Advances in Applied Probability 38 (3): 621–642.
  • Akagi, F., H. Osaki, and S. Kikuchi. 1983. “A Method for Assembly Line Balancing with More Than one Worker in Each Station.” International Journal of Production Research 21 (5): 755–770.
  • Al-Zuheri, A., L. Luong, and K. Xing. 2010. “An Integrated Design Support Methodology for Walking Worker Assembly Lines.” Proceedings of the international multi-conference of computer and engineering scientists (IMECS 2010), Hong Kong, International Association of Engineers vol. III, 1612–1617, March 17–19, 2010.
  • Al-Zuheri, A., L. Luong, and K. Xing. 2013. “Prediction and Analysis Impact of Operational Design of a Manual Assembly System with Walking Workers on Performance.” International Journal of Computer Integrated Manufacturing 26 (6): 540–560.
  • Al-Zuheri, A., L. Luong, and K. Xing. 2014. “Using Simulation in Verification of a Mathematical Model for Predicting the Performance of Manual Assembly Line Occupied with Flexible Workforce.” International Journal of Simulation and Process Modelling 9 (4): 270–284.
  • Al-Zuheri, A., L. Luong, and K. Xing. 2016. “Developing a Multi-Objective Genetic Optimisation Approach for an Operational Design of a Manual Mixed-Model Assembly Line with Walking Workers.” Journal of Intelligent Manufacturing 27 (5): 1049–1065.
  • Aljuneidi, T., and A. A. Bulgak. 2016. “Design of Cellular Manufacturing Systems Considering Dynamic Production Planning and Worker Assignments.” Journal of Mathematics and System Science 6: 1–15.
  • Altemeier, S., M. Helmdach, A. Koberstein, and W. Dangelmaier. 2010. “Reconfiguration of Assembly Lines Under the Influence of High Product Variety in the Automotive Industry–a Decision Support System.” International Journal of Production Research 48 (21): 6235–6256.
  • Ammar, A., H. Pierreval, and S. Elkosentini. 2013. “Workers Assignment Problems in Manufacturing Systems: A Literature Analysis.” 5th International conference on industrial engineering and systems management (IESM), Rabat, Morocco, 2013, 1–7.
  • Andersen, A. L., J. K. Larsen, T. D. Brunoe, K. Nielsen, and C. Ketelsen. 2018. “Critical Enablers of Changeable and Reconfigurable Manufacturing and Their Industrial Implementation.” Journal of Manufacturing Technology Management 29 (6): 983–1002.
  • Anzanello, M. J., and F. S. Fogliatto. 2007. “Learning Curve Modelling of Work Assignment in Mass Customized Assembly Lines.” International Journal of Production Research 45 (13): 2919–2938.
  • Aroui, K., G. Alpan, and Y. Frein. 2017. “Minimising Work Overload in Mixed-Model Assembly Lines with Different Types of Operators: a Case Study From the Truck Industry.” International Journal of Production Research 55 (21): 6305–6326.
  • Aryanezhad, M. B., V. Deljoo, and S. M. J. Mirzapour Al-e-Hashem. 2009. “Dynamic Cell Formation and the Worker Assignment Problem: a new Model.” The International Journal of Advanced Manufacturing Technology 41 (3–4): 329–342.
  • Asensio-Cuesta, S., J. A. Diego-Mas, L. Canós-Darós, and C. Andrés-Romano. 2012. “A Genetic Algorithm for the Design of job Rotation Schedules Considering Ergonomic and Competence Criteria.” The International Journal of Advanced Manufacturing Technology 60 (9-12): 1161–1174.
  • Askin, R. G. 2013. “Contributions to the Design and Analysis of Cellular Manufacturing Systems.” International Journal of Production Research 51 (23-24): 6778–6787.
  • Askin, R., and Y. Huang. 1997. “Employee Training and Assignment for Facility Reconfiguration.” In Industrial Engineering Research - Conference Proceedings. IIE, Norcross, GA, United States, Proceedings of the 1997 6th Annual Industrial Engineering Research Conference, IERC, Miami Beach, FL, USA, edited by G. L. Curry, 426–431.
  • Baker, K. R. 1976. “Workforce Allocation in Cyclical Scheduling Problems: A Survey.” Journal of the Operational Research Society 27 (1): 155–167.
  • Bartholdi, J. J., and D. D. Eisenstein. 1996. “A Production Line That Balances Itself.” Operations Research 44 (1): 21–34.
  • Bartholdi, J. J., D. D. Eisenstein, and R. D. Foley. 2001. “Performance of Bucket Brigades When Work is Stochastic.” Operations Research 49 (5): 710–719.
  • Bartholdi, J. J., D. D. Eisenstein, and Y. F. Lim. 2009. “Deterministic Chaos in a Model of Discrete Manufacturing.” Naval Research Logistics (NRL) 56 (4): 293–299.
  • Bartholdi III, J. J., L. A. Bunimovich, and D. D. Eisenstein. 1999. “Dynamics of Two and Three-Worker “Bucket Brigade” Production Lines.” Operations Research 47 (3): 488–491.
  • Battaïa, O., X. Delorme, A. Dolgui, J. Hagemann, A. Horlemann, S. Kovalev, and S. Malyutin. 2015. “Workforce Minimization for a Mixed-Model Assembly Line in the Automotive Industry.” International Journal of Production Economics 170: 489–500.
  • Battaïa, O., and A. Dolgui. 2013. “A Taxonomy of Line Balancing Problems and Their Solution Approaches.” International Journal of Production Economics 142 (2): 259–277.
  • Battini, D., M. Faccio, E. Ferrari, A. Persona, and F. Sgarbossa. 2007. “Design Configuration for a Mixed-Model Assembly System in Case of low Product Demand.” The International Journal of Advanced Manufacturing Technology 34 (1-2): 188–200.
  • Baykasoğlu, A., Ş Topaloğlu, and F. Şenyüzlüler. 2018. “Manufacturing Cell Formation with Flexible Processing Capabilities and Worker Assignment: Comparison of Constraint Programming and Integer Programming Approaches.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 232 (11): 2054–2068.
  • Bellgran, M., and E. K. Säfsten. 2009. Production Development: Design and Operation of Production Systems. London, UK: Springer Science & Business Media.
  • Benjaafar, S., S. S. Heragu, and S. A. Irani. 2002. “Next Generation Factory Layouts: Research Challenges and Recent Progress.” Interfaces 32 (6): 58–76.
  • Bidanda, B., P. Ariyawongrat, K. L. Needy, B. A. Norman, and W. Tharmmaphornphilas. 2005. “Human Related Issues in Manufacturing Cell Design, Implementation, and Operation: a Review and Survey.” Computers and Industrial Engineering 48 (3): 507–523.
  • Biele, A., and L. Mönch. 2018. “Hybrid Approaches to Optimize Mixed-Model Assembly Lines in low-Volume Manufacturing.” Journal of Heuristics 24 (1): 49–81.
  • Bischak, D. P. 1996. “Performance of a Manufacturing Module with Moving Workers.” IIE Transactions 28 (9): 723–733.
  • Bock, S., O. Rosenberg, and T. van Brackel. 2006. “Controlling Mixed-Model Assembly Lines in Real-Time by Using Distributed Systems.” European Journal of Operational Research 168 (3): 880–904.
  • Bokhorst, J. A., and G. J. Gaalman. 2009. “Cross-training Workers in Dual Resource Constrained Systems with Heterogeneous Processing Times.” International Journal of Production Research 47 (22): 6333–6356.
  • Bokhorst, J. A. C., J. Slomp, and G. J. C. Gaalman. 2004. “On the who-Rule in Dual Resource Constrained (DRC) Manufacturing Systems.” International Journal of Production Research 42 (23): 5049–5074.
  • Bortolini, M., E. Ferrari, F. Gabriele Galizia, C. Mora, and F. Pilati. 2019. “Optimal Redesign of Cellular Flexible and Reconfigurable Manufacturing Systems.” Procedia CIRP 81: 1435–1440.
  • Bortolini, M., F. G. Galizia, and C. Mora. 2018. “Reconfigurable Manufacturing Systems: Literature Review and Research Trend.” Journal of Manufacturing Systems 49: 93–106.
  • Bouajaja, S., and N. Dridi. 2017. “A Survey on Human Resource Allocation Problem and its Applications.” Operational Research 17 (2): 339–369.
  • Boysen, N., M. Fliedner, and A. Scholl. 2008. “Assembly Line Balancing: Which Model to use When?” International Journal of Production Economics 111 (2): 509–528.
  • Boysen, N., M. Kiel, and A. Scholl. 2011. “Sequencing Mixed-Model Assembly Lines to Minimise the Number of Work Overload Situations.” International Journal of Production Research 49 (16): 4735–4760.
  • Bratcu, A. I., and A. Dolgui. 2005. “A Survey of the Self-Balancing Production Lines (“Bucket Brigades”).” Journal of Intelligent Manufacturing 16 (2): 139–158.
  • Bratcu, A. I., and A. Dolgui. 2009. “Some new Results on the Analysis and Simulation of Bucket Brigades (Self-Balancing Production Lines).” International Journal of Production Research 47 (2): 369–387.
  • Buyukkaramikli, N. C., J. W. M. Bertrand, and H. P. van Ooijen. 2013. “Flexible Hiring in a Make to Order System with Parallel Processing Units.” Annals of Operations Research 209 (1): 159–178.
  • Campbell, G. M. 2011. “A two-Stage Stochastic Program for Scheduling and Allocating Cross-Trained Workers.” Journal of the Operational Research Society 62 (6): 1038–1047.
  • Campbell, G. M., and M. Diaby. 2002. “Development and Evaluation of an Assignment Heuristic for Allocating Cross-Trained Workers.” European Journal of Operational Research 138 (1): 9–20.
  • Celano, G., A. Costa, S. Fichera, and G. Perrone. 2004. “Human Factor Policy Testing in the Sequencing of Manual Mixed Model Assembly Lines.” Computers and Operations Research 31 (1): 39–59.
  • Cevikcan, E. 2016. “An Optimization Methodology for Multi Model Walking-Worker Assembly Systems: an Application From Busbar Energy Distribution Systems.” Assembly Automation 36 (4): 439–459.
  • Cevikcan, E., and M. B. Durmusoglu. 2011. “Minimising Utility Work and Utility Worker Transfers for a Mixed-Model Assembly Line.” International Journal of Production Research 49 (24): 7293–7314.
  • Chaves, A. A., C. Miralles, and L. A. N. Lorena. 2007. “Clustering Search Approach for the Assembly Line Worker Assignment and Balancing Problem.” In Proceedings of the 37th international conference on computers and industrial engineering, Alexandria, Egypt, 1469–1478.
  • Chen, Q., S. Liao, Z. Wu, and S. Yi. 2016. “Comparative Analysis of the Performance of a Novel U-Shaped ‘Chasing-Overtaking’ Production Line.” International Journal of Production Research 54 (12): 3677–3690.
  • Chu, X., D. Gao, S. Cheng, L. Wu, J. Chen, Y. Shi, and Q. Qin. 2019. “Worker Assignment with Learning-Forgetting Effect in Cellular Manufacturing System Using Adaptive Memetic Differential Search Algorithm.” Computers and Industrial Engineering 136: 381–396.
  • Corominas, A., R. Pastor, and J. Plans. 2008. “Balancing Assembly Line with Skilled and Unskilled Workers.” Omega 36 (6): 1126–1132.
  • Cortez, P. M., and A. M. Costa. 2015. “Sequencing Mixed-Model Assembly Lines Operating with a Heterogeneous Workforce.” International Journal of Production Research 53 (11): 3419–3432.
  • Cronin, C., A. Conway, and J. Walsh. 2019. “Flexible Manufacturing Systems Using IIoT in the Automotive Sector.” Procedia Manufacturing 38: 1652–1659.
  • Davis, D. J., H. V. Kher, and B. J. Wagner. 2009. “Influence of Workload Imbalances on the Need for Worker Flexibility.” Computers and Industrial Engineering 57 (1): 319–329.
  • De Bruecker, P., J. Van den Bergh, J. Beliën, and E. Demeulemeester. 2015. “Workforce Planning Incorporating Skills: State of the art.” European Journal of Operational Research 243 (1): 1–16.
  • Deepak, A., R. Srivatsan, and V. Samsingh. 2017. “A Case Study on Implementation of Walking Worker Assembly Line to Improve Productivity and Utilisation of Resources in a Heavy Duty Manufacturing Industry.” FME Transactions 45 (4): 496–502.
  • Delorme, X., A. Dolgui, S. Kovalev, and M. Y. Kovalyov. 2019. “Minimizing the Number of Workers in a Paced Mixed-Model Assembly Line.” European Journal of Operational Research 272 (1): 188–194.
  • Dolgui, A., N. Guschinsky, and G. Levin. 2009. “Graph Approach for Optimal Design of Transfer Machine with Rotary Table.” International Journal of Production Research 47 (2): 321–341.
  • Dolgui, A., and I. Ihnatsenka. 2009. “Branch and Bound Algorithm for a Transfer Line Design Problem: Stations with Sequentially Activated Multi-Spindle Heads.” European Journal of Operational Research 197 (3): 1119–1132.
  • Dolgui, A., S. Kovalev, M. Y. Kovalyov, S. Malyutin, and A. Soukhal. 2018. “Optimal Workforce Assignment to Operations of a Paced Assembly Line.” European Journal of Operational Research 264 (1): 200–211.
  • Dolgui, A., S. E. H. Petroodi, S. Kovalev, M. Y. Kovalyov, and S. Thevenin. 2019. “Workforce Planning and Assignment in Mixed-Model Assembly Lines as a Factor of Line Reconfigurability: State of the art.” IFAC-PapersOnLine 52 (13): 2746–2751.
  • Dolgui, A., and J. M. Proth. 2010. Supply Chains Engineering: Useful Methods and Techniques. Berlin: Springer Science & Business Media.
  • Easton, F. F. 2011. “Cross-training Performance in Flexible Labor Scheduling Environments.” IIE Transactions 43 (8): 589–603.
  • Easton, F. F. 2014. “Service Completion Estimates for Cross-Trained Workforce Schedules Under Uncertain Attendance and Demand.” Production and Operations Management 23 (4): 660–675.
  • Ebeling, A. C., and C. Y. Lee. 1994. “Cross-training Effectiveness and Profitability.” International Journal of Production Research 32 (12): 2843–2859.
  • Eğilmez, G., B. Erenay, and G. A. Süer. 2014. “Stochastic Skill-Based Manpower Allocation in a Cellular Manufacturing System.” Journal of Manufacturing Systems 33 (4): 578–588.
  • ElMaraghy, H. A. 2005. “Flexible and Reconfigurable Manufacturing Systems Paradigms.” International Journal of Flexible Manufacturing Systems 17 (4): 261–276.
  • ElMaraghy, H., V. Patel, and I. Ben Abdallah. 2000. “Scheduling of Manufacturing Systems Under Dual-Resource Constraints Using Genetic Algorithms.” Journal of Manufacturing Systems 19 (3): 186–201.
  • El Zaatari, S., M. Marei, W. Li, and Z. Usman. 2019. “Cobot Programming for Collaborative Industrial Tasks: an Overview.” Robotics and Autonomous Systems 116: 162–180.
  • Ertay, T., and D. Ruan. 2005. “Data Envelopment Analysis Based Decision Model for Optimal Operator Allocation in CMS.” European Journal of Operational Research 164 (3): 800–810.
  • Faccio, M., M. Gamberi, and M. Bortolini. 2016. “Hierarchical Approach for Paced Mixed-Model Assembly Line Balancing and Sequencing with Jolly Operators.” International Journal of Production Research 54 (3): 761–777.
  • Feng, H., W. Da, L. Xi, E. Pan, and T. Xia. 2017. “Solving the Integrated Cell Formation and Worker Assignment Problem Using Particle Swarm Optimization and Linear Programming.” Computers and Industrial Engineering 110: 126–137.
  • Fowler, J. W., P. Wirojanagud, and E. S. Gel. 2008. “Heuristics for Workforce Planning with Worker Differences.” European Journal of Operational Research 190 (3): 724–740.
  • Francas, D., N. Löhndorf, and S. Minner. 2011. “Machine and Labor Flexibility in Manufacturing Networks.” International Journal of Production Economics 131 (1): 165–174.
  • Gebennini, E., L. Zeppetella, A. Grassi, and B. Rimini. 2018. “Optimal job Assignment Considering Operators’ Walking Costs and Ergonomic Aspects.” International Journal of Production Research 56 (3): 1249–1268.
  • Gyulai, D., B. Kádár, and L. Monostori. 2017. “Scheduling and Operator Control in Reconfigurable Assembly Systems.” Procedia CIRP 63: 459–464.
  • Harari, N. S., A. Fundin, and A. L. Carlsson. 2018. “Components of the Design Process of Flexible and Reconfigurable Assembly Systems.” Procedia Manufacturing 25: 549–556.
  • Hashemi-Petroodi, S. E., S. Thevenin, S. Kovalev, and A. Dolgui. 2020. “Operations Management Issues in Design and Control of Hybrid Human-Robot Collaborative Manufacturing Systems: a Survey.” Annual Reviews in Control 49: 264–276.
  • Hopp, W. J., E. Tekin, and M. P. Van Oyen. 2004. “Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers.” Management Science 50 (1): 83–98.
  • Hottenstein, M. P., and S. A. Bowman. 1998. “Cross-training and Worker Flexibility: A Review of DRC System Research.” Journal of High Technology Management Research 9 (2): 157–174.
  • Hytonen, J., E. Niemi, and V. Toivonen. 2008. “Optimal Workforce Allocation for Assembly Lines for Highly Customised low-Volume Products.” International Journal of Services Operations and Informatics 3 (1): 28–39.
  • Hyun, C. J., Y. K. Kim, and Y. K. Kim. 1998. “A Genetic Algorithm for Multiple Objective Sequencing Problems in Mixed Model Assembly Lines.” Computers and Operations Research 25 (7–8): 675–690.
  • Inman, R. R., W. C. Jordan, and D. E. Blumenfeld. 2004. “Chained Cross-Training of Assembly Line Workers.” International Journal of Production Research 42 (10): 1899–1910.
  • Jaehn, F., and H. A. Sedding. 2016. “Scheduling with Time-Dependent Discrepancy Times.” Journal of Scheduling 19 (6): 737–757.
  • Kaku, I., Y. Murase, and Y. Yin. 2008. “A Study on Human-Task-Related Performances in Converting Conveyor Assembly Line to Cellular Manufacturing.” European Journal of Industrial Engineering 2 (1): 17–34.
  • Kellegöz, T. 2017. “Assembly Line Balancing Problems with Multi-Manned Stations: a new Mathematical Formulation and Gantt Based Heuristic Method.” Annals of Operations Research 253 (1): 377–404.
  • Kim, D., D. H. Moon, and I. Moon. 2018. “Balancing a Mixed-Model Assembly Line with Unskilled Temporary Workers: Algorithm and Case Study.” Assembly Automation 38 (4): 511–523.
  • Kim, S., and D. A. Nembhard. 2013. “Rule Mining for Scheduling Cross Training with a Heterogeneous Workforce.” International Journal of Production Research 51 (8): 2281–2300.
  • Koo, P.-H. 2009. “The use of Bucket Brigades in Zone Order Picking Systems.” OR Spectrum 31 (4): 759–774.
  • Koren, Y., U. Heisel, F. Jovane, T. Moriwaki, G. Pritschow, G. Ulsoy, and H. Van Brussel. 1999. “Reconfigurable Manufacturing Systems.” CIRP Annals 48 (2): 527–540.
  • Kucukkoc, I., and D. Z. Zhang. 2014. “Simultaneous Balancing and Sequencing of Mixed-Model Parallel two-Sided Assembly Lines.” International Journal of Production Research 52 (12): 3665–3687.
  • Kucukkoc, I., and D. Z. Zhang. 2016. “Mixed-model Parallel two-Sided Assembly Line Balancing Problem: A Flexible Agent-Based ant Colony Optimization Approach.” Computers and Industrial Engineering 97: 58–72.
  • Kuo, Y., and C. C. Liu. 2017. “Operator Assignment in a Labor-Intensive Manufacturing Cell Considering Inter-Cell Manpower Transfer.” Computers and Industrial Engineering 110: 83–91.
  • Lee, D.-K., J.-H. Shin, and D.-H. Lee. 2020. “Operations Scheduling for an Advanced Flexible Manufacturing System with Multi-Fixturing Pallets.” Computers and Industrial Engineering 144: 106496. https://doi.org/10.1016/j.cie.2020.106496.
  • Li, J., and J. Gao. 2014. “Balancing Manual MMALs Using Overtime Work in a Demand Variation Environment.” International Journal of Production Research 52 (12): 3552–3567.
  • Lian, J., C. G. Liu, W. J. Li, and Y. Yin. 2018. “A Multi-Skilled Worker Assignment Problem in Seru Production Systems Considering the Worker Heterogeneity.” Computers and Industrial Engineering 118: 366–382.
  • Lim, Y. F. 2011. “Cellular Bucket Brigades.” Operations Research 59 (6): 1539–1545.
  • Lim, Y. F. 2012. “Order-picking by Cellular Bucket Brigades: a Case Study.” In Warehousing in the Global Supply Chain, edited by R. Mazini, 71–85. London: Springer. doi:10.1007/978-1-4471-2274-6_4.
  • Lim, Y. F. 2017. “Performance of Cellular Bucket Brigades with Hand-off Times.” Production and Operations Management 26 (10): 1915–1923.
  • Lim, Y. F., and Y. Wu. 2014. “Cellular Bucket Brigades on U-Lines with Discrete Work Stations.” Production and Operations Management 23 (7): 1113–1128.
  • Lim, Y. F., and K. K. Yang. 2009. “Maximizing Throughput of Bucket Brigades on Discrete Work Stations.” Production and Operations Management 18 (1): 48–59.
  • Liu, C., J. Wang, J. Y.-T. Leung, and K. Li. 2016. “Solving Cell Formation and Task Scheduling in Cellular Manufacturing System by Discrete Bacteria Foraging Algorithm.” International Journal of Production Research 54 (3): 923–944.
  • Mahdavi, I., A. Aalaei, M. M. Paydar, and M. Solimanpur. 2010. “Designing a Mathematical Model for Dynamic Cellular Manufacturing Systems Considering Production Planning and Worker Assignment.” Computers and Mathematics with Applications 60 (4): 1014–1025.
  • Makssoud, F., O. Battaïa, and A. Dolgui. 2014. “An Exact Optimization Approach for a Transfer Line Reconfiguration Problem.” International Journal of Advanced Manufacturing Technology 72: 717–727.
  • Makssoud, F., O. Battaïa, and A. Dolgui. 2020. “Multi-objective Approach and Model for Transfer Line Reconfigurations.” In Reconfigurable Manufacturing Systems: From Design to Implementation. Springer Series in Advanced Manufacturing, edited by L. Benyoucef, 193–208. Cham: Springer International Publishing. doi:10.1007/978-3-030-28782-5_10.
  • Manavizadeh, N., N. S. Hosseini, M. Rabbani, and F. Jolai. 2013. “A Simulated Annealing Algorithm for a Mixed Model Assembly U-Line Balancing Type-I Problem Considering Human Efficiency and Just-in-Time Approach.” Computers and Industrial Engineering 64 (2): 669–685.
  • McCreery, J. K., and L. J. Krajewski. 1999. “Improving Performance Using Workforce Flexibility in an Assembly Environment with Learning and Forgetting Effects.” International Journal of Production Research 37 (9): 2031–2058.
  • Mehrabi, M. G., A. G. Ulsoy, and Y. Koren. 2000. “Reconfigurable Manufacturing Systems: Key to Future Manufacturing.” Journal of Intelligent Manufacturing 11 (4): 403–419.
  • Mehrabi, M. G., A. G. Ulsoy, Y. Koren, and P. Heytler. 2002. “Trends and Perspectives in Flexible and Reconfigurable Manufacturing Systems.” Journal of Intelligent Manufacturing 13 (2): 135–146.
  • Méndez-Vázquez, Y. M., and D. A. Nembhard. 2019. “Worker-cell Assignment: The Impact of Organizational Factors on Performance in Cellular Manufacturing Systems.” Computers and Industrial Engineering 127: 1101–1114.
  • Miralles, C., J. P. García-Sabater, C. Andrés, and M. Cardós. 2008. “Branch and Bound Procedures for Solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work Centres for Disabled.” Discrete Applied Mathematics 156 (3): 352–367.
  • Moreira, M. C. D. O., and A. M. Costa. 2009. “A Minimalist yet Efficient Tabu Search Algorithm for Balancing Assembly Lines with Disabled Workers.” Anais do XLI Simpósio Brasileiro de Pesquisa Operacional. Porto Seguro, Brazil 660–671. http://ws2.din.uem.br/∼ademir/sbpo/sbpo2009/artigos/55866.pdf.
  • Mura, M. D., and G. Dini. 2016. “Worker Skills and Equipment Optimization in Assembly Line Balancing by a Genetic Approach.” Procedia CIRP 44: 102–107.
  • Naderi, B., A. Azab, and K. Borooshan. 2019. “A Realistic Multi-Manned Five-Sided Mixed-Model Assembly Line Balancing and Scheduling Problem with Moving Workers and Limited Workspace.” International Journal of Production Research 57 (3): 643–661.
  • Nakade, K., and R. Nishiwaki. 2008. “Optimal Allocation of Heterogeneous Workers in a U-Shaped Production Line.” Computers and Industrial Engineering 54 (3): 432–440.
  • Nakade, K., and K. Ohno. 1995. “Reversibility and Dependence in a U-Shaped Production Line.” Queueing Systems 21 (1-2): 183–197.
  • Nakade, K., and K. Ohno. 1999. “An Optimal Worker Allocation Problem for a U-Shaped Production Line.” International Journal of Production Economics 60-61: 353–358.
  • Nikoofarid, E., and A. Aalaei. 2012. “Production Planning and Worker Assignment in a Dynamic Virtual Cellular Manufacturing System.” International Journal of Management Science and Engineering Management 7 (2): 89–95.
  • Norman, B. A., W. Tharmmaphornphilas, K. L. Needy, B. Bidanda, and R. C. Warner. 2002. “Worker Assignment in Cellular Manufacturing Considering Technical and Human Skills.” International Journal of Production Research 40 (6): 1479–1492.
  • Otto, A., and O. Battaïa. 2017. “Reducing Physical Ergonomic Risks at Assembly Lines by Line Balancing and job Rotation: A Survey.” Computers and Industrial Engineering 111: 467–480.
  • Özcan, U. 2018. “Balancing Stochastic Parallel Assembly Lines.” Computers and Operations Research 99: 109–122.
  • Papaioannou, G., and J. M. Wilson. 2010. “The Evolution of Cell Formation Problem Methodologies Based on Recent Studies (1997-2008): Review and Directions for Future Research.” European Journal of Operational Research 206 (3): 509–521.
  • Peruzzini, M., and M. Pellicciari. 2017. “A Framework to Design a Human-Centred Adaptive Manufacturing System for Aging Workers.” Advanced Engineering Informatics 33: 330–349.
  • Pröpster, M., L. März, G. Reinhart, and C. Intra. 2015. “Validation of Line Balancing by Simulation of Workforce Flexibility.” Procedia CIRP 33: 93–98.
  • Qin, R., D. A. Nembhard, and W. L. Barnes II. 2015. “Workforce Flexibility in Operations Management.” Surveys in Operations Research and Management Science 20 (1): 19–33.
  • Quader, S. 2013. “A State-of-the-art Matrix Analysis of Bucket Brigade.” In IIE annual conference, Proceedings, 1255–1264. San Juan, Puerto Rico: Institute of Industrial and Systems Engineers.
  • Quintana, R., M. T. Leung, J. Rene Villalobos, and M. Graul. 2009. “Corrective Maintenance Through Dynamic Work Allocation and pre-Emption: Case Study and Application.” International Journal of Production Research 47 (13): 3539–3557.
  • Rajamani, D., N. Singh, and Y. P. Aneja. 1990. “Integrated Design of Cellular Manufacturing Systems in the Presence of Alternate Process Plans.” International Journal of Production Research 28 (8): 1541–1554.
  • Rekiek, B., A. Dolgui, A. Delchambre, and A. Bratcu. 2002. “State of art of Optimization Methods for Assembly Design.” Annual Reviews in Control 26 (2): 163–174.
  • Safaei, N., M. Saidi-Mehrabad, and M. S. Jabal-Ameli. 2008. “A Hybrid Simulated Annealing for Solving an Extended Model of Dynamic Cellular Manufacturing System.” European Journal of Operational Research 185: 563–592.
  • Satoglu, S. I., and N. C. Suresh. 2009. “A Goal-Programming Approach for Design of Hybrid Cellular Manufacturing Systems in Dual Resource Constrained Environments.” Computers and Industrial Engineering 56 (2): 560–575.
  • Savino, M. M., A. Brun, and A. Mazza. 2014. “Dynamic Workforce Allocation in a Constrained Flow Shop with Multi-Agent System.” Computers in Industry 65 (6): 967–975.
  • Sayin, S., and S. Karabati. 2007. “Assigning Cross-Trained Workers to Departments: A two-Stage Optimization Model to Maximize Utility and Skill Improvement.” European Journal of Operational Research 176 (3): 1643–1658.
  • Schrader, G. F., and A. K. Elshennawy. 2000. Manufacturing Processes and Materials. Dearborn, MI: Society of manufacturing Engineers.
  • Sennott, L. I., M. P. Van Oyen, and S. M. Iravani. 2006. “Optimal Dynamic Assignment of a Flexible Worker on an Open Production Line with Specialists.” European Journal of Operational Research 170 (2): 541–566.
  • Shewchuk, J. P. 2008. “Worker Allocation in Lean U-Shaped Production Lines.” International Journal of Production Research 46 (13): 3485–3502.
  • Shttjb, A. 1984. “The Effect of Incompletion Cost on Line Balancing with Multiple Manning of Work Stations.” International Journal of Production Research 22 (2): 235–245.
  • Sikora, C. G. S., T. C. Lopes, and L. Magatão. 2017. “Traveling Worker Assembly Line (re) Balancing Problem: Model, Reduction Techniques, and Real Case Studies.” European Journal of Operational Research 259 (3): 949–971.
  • Simaria, A. S., Zanella De Sá, M. & Vilarinho, and P. M. 2009. “Meeting Demand Variation Using Flexible U-Shaped Assembly Lines.” International Journal of Production Research 47 (14): 3937–3955.
  • Singh, N. 1993. “Design of Cellular Manufacturing Systems: an Invited Review.” European Journal of Operational Research 69 (3): 284–291.
  • Sirovetnukul, R., and P. Chutima. 2010. “The Impact of Walking Time on U-Shaped Assembly Line Worker Allocation Problems.” Engineering Journal 14 (2): 53–78.
  • Slomp, J., J. A. Bokhorst, and E. Molleman. 2005. “Cross-training in a Cellular Manufacturing Environment.” Computers and Industrial Engineering 48 (3): 609–624.
  • Song, J., B. X. Zhang, and Y. Y. Guan. 2011. “Study on Balance Points of Bucket Brigade Lines with Return Velocities.” Advanced Materials Research 314-316: 2273–2277. https://doi.org/10.4028/www.scientific.net/amr.314-316.2273.
  • Soolaki, M. 2012. “A Multi-Objective Integrated Cellular Manufacturing Systems Design with Production Planning, Worker Assignment and Dynamic System Reconfiguration.” International Journal of Industrial and Systems Engineering 12 (3): 280–300.
  • Sparling, D., and J. Miltenburg. 1998. “The Mixed-Model U-Line Balancing Problem.” International Journal of Production Research 36 (2): 485–501.
  • Sriram, S., M. E. Kuhl, B. K. Thorn, and A. L. Carrano. 2014. “A Novel Work-Sharing Protocol for U-shaped Assembly Lines.” Proceedings of the winter simulation conference 2014, Savanah, GA, 2014, 2113–2123. https://doi.org/10.1109/WSC.2014.7020056.
  • Stadnicka, D., D. Antonelli, and G. Bruno. 2017. “Work Sequence Analysis and Computer Simulations of Value Flow and Workers’ Relocations: a Case Study.” Procedia CIRP 62: 159–164.
  • Stecke, K. E., and J. E. Aronson. 1985. “Review of Operator/Machine Interference Models.” International Journal of Production Research 23 (1): 129–151.
  • Stratman, J. K., A. V. Roth, and W. G. Gilland. 2004. “The Deployment of Temporary Production Workers in Assembly Operations: a Case Study of the Hidden Costs of Learning and Forgetting.” Journal of Operations Management 21 (6): 689–707.
  • Süer, G. A., and C. Dagli. 2005. “Intra-cell Manpower Transfers and Cell Loading in Labor-Intensive Manufacturing Cells.” Computers and Industrial Engineering 48 (3): 643–655.
  • Sungur, B., and Y. Yavuz. 2015. “Assembly Line Balancing with Hierarchical Worker Assignment.” Journal of Manufacturing Systems 37: 290–298.
  • Tapkan, P., L. Özbakır, and A. Baykasoğlu. 2016. “Bee Algorithms for Parallel two-Sided Assembly Line Balancing Problem with Walking Times.” Applied Soft Computing 39: 275–291.
  • Techawiboonwong, A., P. Yenradee, and S. K. Das. 2006. “A Master Scheduling Model with Skilled and Unskilled Temporary Workers.” International Journal of Production Economics 103 (2): 798–809.
  • Tekin, E., W. J. Hopp, and M. P. Van Oyen. 2002. “Benefits of Skill Chaining in Production Lines with Cross-Trained Workers.” Manufacturing and Service Operations Management 4 (1): 17–20.
  • Thongsanit, K., R. Boondisakulchok, and W. Tharmmaphornphilas. 2010. “Heuristic for Task-Worker Assignment with Varying Learning Slopes.” Engineering Journal 14 (2): 1–14.
  • Treleven, M. 1989. “A Review of the Dual Resource Constrained System Research.” IIE Transactions 21 (3): 279–287.
  • Vairaktarakis, G., J. G. Szmerekovsky, and J. Xu. 2016. “Level Workforce Planning for Multistage Transfer Lines.” Naval Research Logistics 63 (7): 577–590.
  • Vairaktarakis, G., and J. K. Winch. 1999. “Worker Cross-Training in Paced Assembly Lines.” Manufacturing and Service Operations Management 1 (2): 112–131.
  • Van Den Bergh, J., J. Beliën, P. De Bruecker, E. Demeulemeester, and L. De Boeck. 2013. “Personnel Scheduling: A Literature Review.” European Journal of Operational Research 226 (3): 367–385.
  • Villalobos, J. R., M. A. Gutiérrez, L. R. Mar, O. Sánchez, and O. Ahumada. 2011. “The use of Dynamic Work Sharing Production Methods to Reduce the Impact of Labour Turnover in Serial Assembly Lines.” International Journal of Manufacturing Technology and Management 23 (1–2): 34–53.
  • Wang, Q., S. Lassalle, A. R. Mileham, and G. W. Owen. 2009. “Analysis of a Linear Walking Worker Line Using a Combination of Computer Simulation and Mathematical Modeling Approaches.” Journal of Manufacturing Systems 28 (2–3): 64–70.
  • Wang, Q., S. Lassalle, A. R. Mileham, and G. W. Owen. 2010. “Analysis of Production Loss on a Linear Walking Worker Line.” International Journal of Industrial and Manufacturing Engineering 4 (5): 454–458.
  • Wang, Q., G. W. Owen, and A. R. Mileham. 2007. “Determining Numbers of Workstations and Operators for a Linear Walking-Worker Assembly Line.” International Journal of Computer Integrated Manufacturing 20 (1): 1–10.
  • Wang, Q., M. Sowden, and A. R. Mileham. 2013. “Modelling Human Performance Within an Automotive Engine Assembly Line.” The International Journal of Advanced Manufacturing Technology 68 (1–4): 141–148.
  • Webster, S., R. A. Ruben, and K. Yang. 2012. “Impact of Storage Assignment Decisions on a Bucket Brigade Order Picking Line.” Production and Operations Management 21 (2): 276–290.
  • Widyadana, G. A. 2009. “Multi Objective Model for Balancing U-Type Assembly Line with Permanent and Temporary Workers.” Jurnal Teknik Industri 11 (1): 33–42.
  • Winch, J. K., X. Cai, and G. L. Vairaktarakis. 2007. “Cyclic job Scheduling in Paced Assembly Lines with Cross-Trained Workers.” International Journal of Production Research 45 (4): 803–828.
  • Wu, L., F. Cai, L. Li, and X. Chu. 2018. “Cross-trained Worker Assignment Problem in Cellular Manufacturing System Using Swarm Intelligence Metaheuristics.” Mathematical Problems in Engineering 2018: 1–15.
  • Xu, Z., X. G. Ming, M. Zheng, M. Li, L. He, and W. Song. 2015. “Cross-trained Workers Scheduling for Field Service Using Improved NSGA-II.” International Journal of Production Research 53 (4): 1255–1272.
  • Xu, J., X. Xu, and S. Q. Xie. 2011. “Recent Developments in Dual Resource Constrained (DRC) System Research.” European Journal of Operational Research 215 (2): 309–318.
  • Yaakob, S. B., and J. Watada. 2009. “Particle Swarm Optimization for Multi-Function Worker Assignment Problem.” In: Knowledge-Based and Intelligent Information and Engineering Systems. KES 2009. Lecture Notes in Computer Science, vol. 5712, 203–211, edited by J. D. Velásquez, S. A. Ríos, R. J. Howlett, L. C. Jain. Berlin: Springer.
  • Yang, C., and J. Gao. 2016. “Balancing Mixed-Model Assembly Lines Using Adjacent Cross-Training in a Demand Variation Environment.” Computers and Operations Research 65: 139–148.
  • Yang, C., J. Gao, and L. Sun. 2013. “A Multi-Objective Genetic Algorithm for Mixed-Model Assembly Line Rebalancing.” Computers and Industrial Engineering 65 (1): 109–116.
  • Yoo, J. K., Y. Shimizu, and R. Hino. 2005. “A Sequencing Problem for Mixed-Model Assembly Line with the aid of Relief-man.” International Journal Series C-Mechanical Systems Machine Elements and Manufacturing 48 (1): 15–20.
  • Yue, H., J. Slomp, E. Molleman, and D. J. Van Der Zee. 2008. “Worker Flexibility in a Parallel Dual Resource Constrained job Shop.” International Journal of Production Research 46 (2): 451–467.
  • Zavadlav, E., J. O. McClain, and L. J. Thomas. 1996. “Self-buffering, Self-Balancing, Self-Flushing Production Lines.” Management Science 42 (8): 1151–1164.
  • Zhao, X., K. Ohno, and H. S. Lau. 2004. “A Balancing Problem for Mixed Model Assembly Lines with a Paced Moving Conveyor.” Naval Research Logistics 51 (3): 446–464.
  • Zhou, J., X. Wang, and Q. Zhang. 2017. “Characteristics Analysis of Cellular Bucket Brigades with Different Constraints.” The International Journal of Advanced Manufacturing Technology 93 (1–4): 153–159.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.