783
Views
4
CrossRef citations to date
0
Altmetric
Research Articles

Predicting production-output performance within a complex business environment: from singular to multi-dimensional observations in evaluation

ORCID Icon, ORCID Icon, & ORCID Icon
Pages 7390-7399 | Received 06 Oct 2019, Accepted 08 Oct 2020, Published online: 11 Nov 2020

References

  • Ainsworth, L., and D. Viegut. 2006. “Common Formative Assessments: How to Connect Standards-Based Instruction and Assessment.” Corwin, Thousand Oaks, USA.
  • Bassioni, H. A., A. D. F. Price, and T. M. Hassan. 2004. “Performance Measurement in Construction.” Journal of Management in Engineering 20 (2): 42–50. doi: 10.1061/(ASCE)0742-597X(2004)20:2(42)
  • Bilal, M., L. O. Oyedele, J. Qadir, K. Munir, S. O. Ajayi, O. O. Akinade, H. A. Owolabi, H. A. Alaka, and M. Pasha. 2016. “Big Data in the Construction Industry: A Review of Present Status, Opportunities, and Future Trends.” Advanced Engineering Informatics 30 (3): 500–521. doi: 10.1016/j.aei.2016.07.001
  • Bititci, U., P. Garengo, V. Dörfler, and S. S. Nudurupati. 2012. “Performance Measurement: Challenges for Tomorrow.” International Journal of Management Reviews 14: 305–327. doi: 10.1111/j.1468-2370.2011.00318.x
  • Bourne, M., M. Franco-Santos, P. Micheli, and A. Pavlov. 2018. “Performance Measurement and Management: a System of Systems Perspective.” International Journal of Production Research 56 (8): 2788–2799. doi: 10.1080/00207543.2017.1404159
  • Cheng, J. C. P., W. Chen, and Q. Wang. 2020. “Data-driven Predictive Maintenance Planning Framework for MEP Components Based on BIM and IoT Using Machine Learning Algorithms.” Automation in Construction 112: 103087. doi: 10.1016/j.autcon.2020.103087
  • CIPD (Chartered Institute of Personnel and Development). 2017. “Strategic Human Resource Management.” Accessed November 25, 20018. <https://www.cipd.co.uk/knowledge/strategy/hr/strategic-hrm-factsheet.
  • Elyamany, A., I. Basha, and T. Zayed. 2007. “Performance Evaluation Model for Construction Companies.” Journal of Construction Engineering and Management 133 (8): 574–581. doi: 10.1061/(ASCE)0733-9364(2007)133:8(574)
  • European Commission. 2001. “Ex ante evaluation: A practical guide for preparing proposals for expenditure programmes.” Brussels, Belgium.
  • Fang, W., L. Y. Ding, P. E. D. Love, H. Luo, H. Li, F. Pena-Mora, B. Zhong, and C. Zhou. 2020. “Computer Vision Applications in Construction Safety Assurance.” Automation in Construction 110: 103013. doi: 10.1016/j.autcon.2019.103013
  • Fang, W., L. Ding, B. Zhong, P. E. D. Love, and H. Luo. 2018. “Automated Detection of Workers and Heavy Equipment on Construction Sites: A Convolutional Neural Network Approach.” Advanced Engineering Informatics 37: 139–149. doi: 10.1016/j.aei.2018.05.003
  • Farmer, M. 2016. The Farmer Review of the UK Construction Labour Model: Modernise or die. UK: Construction Leadership Council.
  • Flyvbjerg, B. 2006. “Five Misunderstanding About Case-Study Research.” Qualitative Inquiry 12 (2): 219–245. doi: 10.1177/1077800405284363
  • Franco-Santos, M., L. Lucianetti, and M. Bourne. 2012. “Contemporary Performance Measurement Systems: A Review of Their Consequences and a Framework for Research.” Management Accounting Research 23 (2): 79–119. doi: 10.1016/j.mar.2012.04.001
  • Granger, C. W. J., and P. Newbold. 1974. “Spurious Regression in Econometrics.” Journal of Econometrics 2 (2): 111–120. doi: 10.1016/0304-4076(74)90034-7
  • Haponava, T., and S. Al-Jibouri. 2012. “Proposed System for Measuring Project Performance Using Process-Based key Performance Indicators.” Journal of Management in Engineering 28 (2): 140–149. doi: 10.1061/(ASCE)ME.1943-5479.0000078
  • Harkness, M., and M. Bourne. 2015. “Is complexity a barrier to effective performance measurement?” Proceedings of the PMAA conference, Auckland, New Zealand.
  • Hazen, B. T., C. A. Boone, J. D. Ezell, and L. A. Jones-Farmer. 2014. “Data Quality for Data Science, Predictive Analytics, and big Data in Supply Chain Management: An Introduction to the Problem and Suggestions for Research and Applications.” International Journal of Production Research 154: 72–80. doi: 10.1016/j.ijpe.2014.04.018
  • Hsiao, C. 2003. Analysis of Panel Data. Cambridge, UK: Cambridge University Press.
  • Irani, Z., A. Ghoneim, and P. E. D. Love. 2006. “Evaluating Cost Taxonomies for Information Systems Management.” European Journal of Operational Research 173 (3): 1103–1122. doi: 10.1016/j.ejor.2005.07.007
  • Irani, Z., P. E. D. Love, T. Elliman, S. Jones, and M. Themistocleous. 2005. “Evaluating e-Government: Learning from the Experiences of two UK Local Authorities.” Information Systems Journal 15 (1): 61–82. doi: 10.1111/j.1365-2575.2005.00186.x
  • Irani, Z., A. M. Sharif, and P. E. D. Love. 2005. “Linking Knowledge Transformation and Information Systems Evaluation.” European Journal of Information Systems 14 (3): 213–228. doi: 10.1057/palgrave.ejis.3000538
  • Ji, W., and S. M. AboutRizk. 2018. “Data-driven Simulation Model for Quality-Induced Rework Cost Estimation and Control Using Absorbing Markov Chains.” Journal of Construction Engineering and Management, doi:10.1061/(ASCE)CO.1943-7862.0001534.
  • Jiang, H., and C. Liu. 2011. “Forecasting Construction Demand: a Vector Error Correction Model with Dummy Variables.” Construction Management and Economics 29 (9): 969–979. doi: 10.1080/01446193.2011.611522
  • Kaplan, R. S., and D. P. Norton. 1992. “The Balanced Scorecard – Measures That Drive Performance.” Harvard Business Review 71–79.
  • Liu, J., P. E. D. Love, B. Carey, J. Smith, and J. Matthews. 2015. “Ex-ante Evaluation of Public-Private Partnerships: Macroeconomic Analysis.” Journal of Infrastructure Systems, doi:10.1061/(ASCE)IS.1943-555X.0000228, 04014038.
  • Liu, J., P. E. D. Love, M. C. P. Sing, B. Carey, and J. Matthews. 2015. “Modeling Australia’s Construction Workforce Demand: Empirical Study with a Global Economic Perspective.” Journal of Construction Engineering and Management, doi:10.1061/(ASCE)CO.1943-7862.0000953.
  • Liu, H. J., P. E. D. Love, M. C. P. Sing, and J. Smith. 2019. “Ex-post Evaluation of Economic Infrastructure Assets: The Significance of Regional Heterogeneities in Australia.” Journal of Infrastructure Systems, doi:10.1061/(ASCE)IS.1943-555X.0000485.
  • Liu, H. J., P. E. D. Love, J. Smith, M. C. P. Sing, and J. Matthews. 2018. “Evaluation of Public-Private Partnerships: A Life-Cycle Performance Prism for Ensuring Value for Money.” Environment and Planning C: Politics and Space 36 (6): 1133–1153.
  • Love, P. E. D., and G. Holt. 2000. “Construction Business Performance Measurement: the SPM Alternative.” Business Process Management Journal 6 (5): 408–416. doi: 10.1108/14637150010352417
  • Love, P. E. D., J. Liu, J. Matthews, C. P. Sing, and J. Smith. 2015. “Future-proofing PPPs: Life-Cycle Performance Measurement and Building Information Modelling.” Automation in Construction 56: 26–35. doi: 10.1016/j.autcon.2015.04.008
  • Love, P. E. D., and J. Matthews. 2019. “The ‘How’ of Benefits Management for Digital Technology: From Engineering to Asset Management.’.” Automation in Construction 107: 10293. doi: 10.1016/j.autcon.2019.102930
  • Love, P. E. D., J. Matthews, and J. Zhou. 2020. “Is it Just Too Good to be True? Unearthing the Benefits of Disruptive Technology.” International Journal of Information Management 52: 102096. doi: 10.1016/j.ijinfomgt.2020.102096
  • Ma, L., and C. Liu. 2014. “A Spatial Decomposition Approach for Investigating House Price Convergences.” Australian Journal of Regional Studies 20 (3): 487–511.
  • Matthews, J., P. E. D. Love, J. Mewburn, and C. Stobaus. 2018. “Building Information Modelling in ‘Practice’: Views from a Collaboration and Change Management Perspective During Construction.” Production Planning & Control 29 (3): 202–216. doi: 10.1080/09537287.2017.1407005
  • Neely, A., C. Adams, and P. Crowe. 2001. “The Performance Prism in Practice.” Measuring Business Excellence 5 (2): 6–13. doi: 10.1108/13683040110385142
  • Neely, A., M. Gregory, and K. Platts. 2005. “Performance Measurement System Design: a Literature Review and Research Agenda.” International Journal of Operations and Production Management 25 (12): 1264–1277. doi: 10.1108/01443570510633648
  • Nudurupati, S. S., A. Bhattacharya, D. Lascelles, and N. Caton. 2015. “Strategic Sourcing with Multi-Stakeholders Through Value co-Creation: an Evidence from Global Health Care Company.” International Journal of Production Economics 166: 248–257. doi: 10.1016/j.ijpe.2015.01.008
  • Shewhart, W. 1931. The Economic Control of Manufactured Product. New York, USA: D. Van Nostrand Company.
  • Sing, C. P., D. Edwards, H. J. Liu, and P. E. D. Love. 2015. “Forecasting Private-Sector Construction Works: VAR Model Using Economic Indicators.” Journal of Construction Engineering and Management, doi:10.1061/(ASCE)CO.1943-7862.0001016.
  • Sing, M. C. P., P. E. D. Love, D. J. Edwards, and J. Liu. 2016. “” Dynamics Modeling of Workforce Planning for Infrastructure Projects.”.” Journal of Management in Engineering, doi:10.1061/(ASCE)ME.1943-5479.0000463.
  • Smith, M., and U. S. Bititci. 2017. “Interplay Between Performance Measurement and Management, Employee Engagement and Performance.” International Journal of Operations & Production Management 37 (9): 1207–1228. doi: 10.1108/IJOPM-06-2015-0313
  • Tan, L. P., and K. Y. Wong. 2017. “A Neural Network Approach for Predicting Manufacturing Performance Using Knowledge Management Metrics.” Cybernetic and Systems 48 (4): 348–364. doi: 10.1080/01969722.2017.1285161
  • Van der Aalst, W. 2016. Process Mining: Data Science in Action. 2nd ed. London, UK: Springer.
  • Wheeler, D. J. 2000. Understanding Variation: The key to Managing Chaos. Knoxville, USA: SPC Press.
  • Wilcox, M., and M. Bourne. 2003. “Predicting Performance.” Management Decision 41 (8): 806–816. doi: 10.1108/00251740310496314
  • Yang, J. 2018. “Enhancing Action Recognition of Construction Workers Using Data-Driven Scene Parsing.” Journal of Civil Engineering and Management 24 (7): 568–580. doi: 10.3846/jcem.2018.6133

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.