5,398
Views
28
CrossRef citations to date
0
Altmetric
Articles

Order release planning with predictive lead times: a machine learning approach

ORCID Icon, ORCID Icon &
Pages 3285-3303 | Received 11 Mar 2019, Accepted 15 Oct 2020, Published online: 26 Dec 2020

References

  • Akyol, D. E., and G. M. Bayhan. 2007. “A Review on Evolution of Production Scheduling with Neural Networks.” Computers & Industrial Engineering 53 (1): 95–122. http://www.sciencedirect.com/science/article/pii/S0360835207000666.
  • Atan, Zümbül, Ton de Kok, Nico P Dellaert, Richard van Boxel, and Fred Janssen. 2016. “Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems.” Manufacturing & Service Operations Management 18 (1): 122–140.
  • Bambos, Nicholas, and Jean Walrand. 1990. “An Invariant Distribution for The G/G/1 Queueing Operator.” Advances in Applied Probability 22 (1): 254–256.
  • Ben-Ammar, Oussama, and Alexandre Dolgui. 2018. “Optimal Order Release Dates for Two-Level Assembly Systems with Stochastic Lead Times At Each Level.” International Journal of Production Research 56 (12): 4226–4242.
  • Bergamaschi, D., R. Cigolini, M. Perona, and A. Portioli. 1997. “Order Review and Release Strategies in a Job Shop Environment: A Review and a Classification.” International Journal of Production Research35 (2): 399–420.
  • Bertrand, J. W. M. 1983. “The Effect of Workload Dependent Due-Dates on Job Shop Performance.” Management Science 29 (7): 799–816.
  • Bertrand, J. W. M., J. C. Wortmann, and J. Wijngaard. 1990. Production Control: A Structural and Design Oriented Approach. Amsterdam: Elsevier.
  • Billington, P., J. McClain, and L. J. Thomas. 1983. “Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation, and Problem Reduction.” Management Science 29: 1126–1141.
  • Bobrowski, P. M. 1989. “Implementing a Loading Heuristic in a Discrete Release Job Shop.” International Journal of Production Research 27 (11): 1935–1948.
  • Chang, F.-C. R. 1997. “Heuristics for Dynamic Job Shop Scheduling with Real-Time Updated Queueing Time Estimates.” International Journal of Production Research 35 (3): 651–665. doi:10.1080/002075497195641.
  • Chang, P. C., Y. W. Wang, and C. J. Ting. 2008. “A Fuzzy Neural Network for The Flow Time Estimation in a Semiconductor Manufacturing Factory.” International Journal of Production Research 46 (4): 1017–1029. doi:10.1080/00207540600905620.
  • Chung, S.-H., and H.-W. Huang. 2002. “Cycle Time Estimation for Wafer Fab with Engineering Lots.” IIE Transactions 34 (2): 105–118. doi:10.1080/07408170208928854.
  • Conway, R., and W. Maxwell. 1967. Theory of Scheduling. New York: Addison-Wesley Publ.
  • de Kok, Ton G., and Jan C. Fransoo. 2003. “Planning Supply Chain Operations: Definition and Comparison of Planning Concepts.” Handbooks in Operations Research and Management Science 11: 597–675.
  • Dolgui, A., and M. A. Ould-Louly. 2002. “A Model for Supply Planning Under Lead Time Uncertainty.” International Journal of Production Economics 78: 145–152.
  • Dolgui, Alexandre, and Caroline Prodhon. 2007. “Supply Planning Under Uncertainties in MRP Environments: A State of the Art.” Annual Reviews in Control 31 (2): 269–279.
  • Duchi, J., H. Elad, and S. Yoram. 2011 Jul. “Adaptive Subgradient Methods for Online Learning and Stochastic Optimization.” Journal of Machine Learning Research 12: 2121–2159.
  • Eilon, S., and I. G. Chowdhury. 1976. “Due Dates in Job Shop Scheduling.” The International Journal of Production Research 14 (2): 223–237.
  • Enns, S. T. 1995. “An Integrated System for Controlling Shop Loading and Work Flow.” International Journal of Production Research 33 (10): 2801–2820.
  • Enns, S. T. 2001. “MRP Performance Effects Due to Lot Size and Planned Lead Time Settings.” International Journal of Production Research 39 (3): 461–480.
  • Enns, S. T., and P. Suwanruji. 2004. “Work Load Responsive Adjustment of Planned Lead Times.” Journal of Manufacturing Technology Management 15 (1): 90–100.
  • Fowler, J. W., G. L. Hogg, and S. J. Mason. 2002. “Workload Control in The Semiconductor Industry.” Production Planning and Control 3 (7): 568–1578.
  • Galelli, S., G. B. Humphrey, H. R. Maier, A. Castelletti, G. C. Dandy, and M. S. Gibbs. 2014. “An Evaluation Framework for Input Variable Selection Algorithms for Environmental Data-Driven Models.” Environmental Modelling & Software 62: 33–51.
  • Gelders, L. F., and L. N. Van Wassenhove. 1982. “Hierarchical Integration in Production Planning: Theory and Practice.” Journal of Operations Management 3 (1): 27–35.
  • Glorot, Xavier, Antoine Bordes, and Yoshua Bengio. 2011. “Deep Sparse Rectifier Neural Networks.” In Proceedings of The Fourteenth International Conference on Artificial Intelligence and Statistics
  • Gong, Linguo, Ton de Kok, and Jie Ding. 1994. “Optimal Leadtimes Planning in a Serial Production System.” Management Science 40 (5): 629–632.
  • Graves, Stephen C. 2011. “Uncertainty and Production Planning.” In Planning Production and Inventories in The Extended Enterprise, 83–101. Boston, MA:Springer.
  • Haeussler, Stefan, and Pia Netzer. 2020. “Comparison Between Rule-and Optimization-Based Workload Control Concepts: A Simulation Optimization Approach.” International Journal of Production Research 58 (12): 3724–3743
  • Haeussler, S., M. Schneckenreither, and C. Gerhold. 2019. “Adaptive Order Release Planning with Dynamic Lead Times.” In IFAC-PapersOnLine..
  • Hoyt, J. 1978. “Dynamic Lead Times that Fit Today's Dynamic Planning (QUOAT Lead Times).” Production and Inventory Management 19 (1): 63–71.
  • Hsu, S. Y., and D. Y. Sha. 2004. “Due Date Assignment Using Artificial Neural Networks Under Different Shop Floor Control Strategies.” International Journal of Production Research 42 (9): 1727–1745. doi:10.1080/00207540310001624375.
  • Hutter, Thomas, Stefan Haeussler, and Hubert Missbauer. 2018. “Successful Implementation of An Order Release Mechanism Based on Workload Control: A Case Study of a Make-To-Stock Manufacturer.” International Journal of Production Research 56 (4): 1565–1580.
  • Ioannou, G., and S. Dimitriou. 2012. “Lead Time Estimation in MRP ERP for Make-To-Order Manufacturing Systems.” International Journal of Production Economics 139: 551–563.
  • Jansen, Sjors, Zümbül Atan, Ivo Adan, and Ton de Kok. 2019. “Setting Optimal Planned Leadtimes in Configure-To-Order Assembly Systems.” European Journal of Operational Research 273 (2): 585–595.
  • Jansen, S. W. F, Zümbül Atan, Ivo JBF Adan, and A. G. de Kok. 2018. “Newsvendor Equations for Production Networks.” Operations Research Letters 46 (6): 599–604.
  • Kanet, J. J. 1986. “Toward a Better Understanding of Lead Times in MRP Systems.” Journal of Operations Management 6 (3): 305–315.
  • Kaplan, A. C., and A. T. Unal. 1993. “A Probabilistic Cost-Based Due Date Assignment Model for Job Shops.” International Journal of Production Research 31 (12): 2817–2834. doi:10.1080/00207549308956902.
  • Kim, S.-C., and P. M. Bobrowski. 1995. “Evaluating Order Release Mechanisms in a Job Shop With Sequence-Dependent Setup Times.” Production and Operations Management 4 (2): 163–180. https://onlinelibrary.wiley.com/doi/abs/10.1111/j.1937-5956.1995.tb00048.x.
  • Knollmann, M., and K. Windt. 2013. “Control-Theoretic Analysis of The Lead Time Syndrome and Its Impact on The Logistic Target Achievement.” Procedia CIRP 7: 97–102.
  • Land, M., and G. Gaalman. 1996. “Workload Control Concepts in Job Shops a Critical Assessment.” International Journal of Production Economics 46: 535–548.
  • Law, A. M., and W. D. Kelton. 2000. Simulation Modeling & Analysis. 3rd ed. New York: McGraw-Hill, Inc.
  • Lee, C.-Y., S. Piramuthu, and Y.-K. Tsai. 1997. “Job Shop Scheduling with a Genetic Algorithm and Machine Learning.” International Journal of Production Research 35 (4): 1171–1191. doi:10.1080/002075497195605.
  • Li, S., Y. Li, Y. Liu, and Y. Xu. 2007. “A GA-based NN Approach for Makespan Estimation.” Applied Mathematics and Computation 185 (2): 1003–1014. Special Issue on Intelligent Computing Theory and Methodology, http://www.sciencedirect.com/science/article/pii/S0096300306008253.
  • Lindley, David V. 1952. “The Theory of Queues with a Single Server.” In Mathematical Proceedings of the Cambridge Philosophical Society, Vol. 48. 277–289. Cambridge University Press.
  • Lu, Steve C. H., Deepa Ramaswamy, and P. R. Kumar. 1994. “Efficient Scheduling Policies to Reduce Mean and Variance of Cycle-Time in Semiconductor Manufacturing Plants.” IEEE Transactions on Semiconductor Manufacturing 7 (3): 374–388.
  • Mather, H., and G. W. Plossl. 1978. “Priority Fixation Versus Throughput Planning.” Production and Inventory Management 19: 27–51.
  • Metan, G., I. Sabuncuoglu, and H. Pierreval. 2010. “Real Time Selection of Scheduling Rules and Knowledge Extraction Via Dynamically Controlled Data Mining.” International Journal of Production Research 48 (23): 6909–6938. doi:10.1080/00207540903307581.
  • Milne, R. J., S. Mahapatra, and C.-T. Wang. 2015. “Optimizing Planned Lead Times for Enhancing Performance of MRP Systems.” International Journal of Production Economics 167: 220–231.
  • Missbauer, Hubert, and Reha Uzsoy. 2020. “Planning Models with Stationary Fixed Lead Times.” In Production Planning with Capacitated Resources and Congestion, 77–112. New York, NY:Springer.
  • Mohan, R. P., and L. P. Ritzman. 1998. “Planned Lead Times in Multistage Systems.” Decision Sciences29 (1): 163–191.
  • Molinder, A. 1997. “Joint Optimization of Lot-Sizes, Safety Stocks and Safety Lead Times in a MRP System.” International Journal of Production Research 35 (4): 983–994.
  • Oosterman, Bas, Martin Land, and Gerard Gaalman. 2000. “The Influence of Shop Characteristics on Workload Control.” International Journal of Production Economics 68 (1): 107–119. http://www.sciencedirect.com/science/article/pii/S0925527399001413.
  • Ould-Louly, M.-A., and A. Dolgui. 2004. “The MPS Parameterization Under Lead Time Uncertainty: Production Control and Scheduling.” International Journal of Production Economics 90 (3): 369–376. http://www.sciencedirect.com/science/article/pii/S0925527303002688.
  • Öztürk, A., S. Kayalıgil, and N. E. Özdemirel. 2006. “Manufacturing Lead Time Estimation Using Data Mining.” European Journal of Operational Research 173 (2): 683–700. http://www.sciencedirect.com/science/article/pii/S0377221705003358.
  • Paternina-Arboleda, Carlos D., and Tapas K. Das. 2001. “Intelligent Dynamic Control Policies for Serial Production Lines.” Iie Transactions 33 (1): 65–77.
  • Patil, R. J. 2008. “Using Ensemble and Metaheuristics Learning Principles with Artificial Neural Networks to Improve Due Date Prediction Performance.” International Journal of Production Research 46 (21): 6009–6027.
  • Philipoom, P. R., L. P. Rees, and L. Wiegmann. 1994. “Using Neural Networks to Determine Internally-Set Due-Date Assignments for Shop Scheduling*.” Decision Sciences 25 (5-6): 825–851. doi:10.1111/j.1540-5915.1994.tb01871.x.
  • Philipoom, P. R., L. Wiegmann, and L. P. Rees. 1997. “Cost-Based Due-Date Assignment with The Use of Classical and Neural-Network Approaches.” Naval Research Logistics (NRL) 44 (1): 21–46.
  • Raaymakers, W. H. M, and A. J. M. M. Weijters. 2003. “Makespan Estimation in Batch Process Industries: A Comparison Between Regression Analysis and Neural Networks.” European Journal of Operational Research 145 (1): 14–30. http://www.sciencedirect.com/science/article/pii/S037722170200173X.
  • Ragatz, G. J., and V. A. Mabert. 1988. “An Evaluation of Order Release Mechanisms in a Job-Shop Environment.” Decision Sciences 19: 167–189.
  • Rao, Uday S., Jayashankar M. Swaminathan, and Jun Zhang. 2005. “Demand and Production Management with Uniform Guaranteed Lead Time.” Production and Operations Management 14 (4): 400–412.
  • Savell, D. V., R. A. Perez, and S. W. Koh. 1989. “Scheduling Semiconductor Wafer Production: An Expert System Implementation.” IEEE Expert 4 (3): 9–15.
  • Schneckenreither, M., and S. Haeussler. 2019. “Reinforcement Learning Methods for Operations Research Applications: The Order Release Problem.” In Machine Learning, Optimization, and Data Science, edited by G. Nicosia, P. M. Pardalos, G. Giuffrida, R. Umeton, and V. Sciacca, 545–559. Cham: Springer International Publishing.
  • Schneeweiss, C. 1995. “Hierarchical Structures in Organisations: A Conceptual Framework.” European Journal of Operational Research 86 (1): 4–31.
  • Schneeweiss, C. 2003. “Distributed Decision Making – A Unified Approach.” European Journal of Operational Research 150 (2): 237–252.
  • Selcuk, B., J. C. Fransoo, and A. G. De Kok. 2006. “The Effect of Updating Lead Times on The Performance of Hierarchical Planning Systems.” International Journal of Production Economics 104 (2): 427–440.
  • Sharma, A. 2000. “Seasonal to Interannual Rainfall Probabilistic Forecasts for Improved Water Supply Management: Part 1–A Strategy for System Predictor Identification.” Journal of Hydrology 239 (1-4): 232–239.
  • Silver, E., D. G. Pyke, and R. Peterson. 1998. Inventory Management and Production Planning and Scheduling. New York: Wiley.
  • Stevenson, M., and L. C. Hendry. 2006. “Aggregate Load-Oriented Workload Control: A Review and A Re-Classification of a Key Approach.” International Journal of Production Economics 104 (2): 676–693.
  • Tai, Y. T., W. L. Pearn, and J. H. Lee. 2012. “Cycle Time Estimation for Semiconductor Final Testing Processes with Weibull-Distributed Waiting Time.” International Journal of Production Research 50 (2): 581–592.
  • Tatsiopoulos, I. P., and B. G. Kingsman. 1983. “Lead Time Management.” European Journal of Operational Research 14 (4): 351–358.
  • Teo, C.-C., R. Bhatnagar, and S. C. Graves. 2012. “An Application of Master Schedule Smoothing and Planned Lead Time Control.” Production and Operations Management 21 (2): 211–223.
  • Thuerer, M., M. Stevenson, and T. Qu. 2016. “Job Sequencing and Selection Within Workload Control Order Release: An Assessment by Simulation.” International Journal of Production Research 50: 5048–5062.
  • Thuerer, M., M. Stevenson, and C. Silva. 2011. “Three Decades of Workload Control Research: A Systematic Review of The Literature.” International Journal of Production Research 49 (23): 6905–6935.
  • Tieleman, T., and G. Hinton. 2012. “Lecture 6.5 – RmsProp: Divide the Gradient by a Running Average of Its Recent Magnitude.” COURSERA: Neural Networks for Machine Learning.
  • Tirkel, I. 2013. “Forecasting Flow Time in Semiconductor Manufacturing Using Knowledge Discovery in Databases.” International Journal of Production Research 51 (18): 5536–5548. doi:10.1080/00207543.2013.787168.
  • Vig, M. M, and K. J. Dooley. 1991. “Dynamic Rules for Due-Date Assignment.” The International Journal of Production Research 29 (7): 1361–1377.
  • Vollmann, Thomas E., William L. Berry, and D. Clay Whybark. 2005. Manufacturing Planning and Control Systems for Supply Chain Management. New York: McGraw-Hill.
  • Weeks, J. K. 1979. “Optimizing Planned Lead Times and Delivery Dates.” In APICS 21st Annual Conference Proceedings, 177–188. APICS.
  • Wein, Lawrence M. 1988. “Scheduling Semiconductor Wafer Fabrication.” IEEE Transactions on Semiconductor Manufacturing 1 (3): 115–130.
  • Yan, Haoyun, Mark Stevenson, Linda C. Hendry, and Martin J. Land. 2016. “Load-Oriented Order Release (LOOR) Revisited: Bringing It Back to The State of The Art.” Production Planning & Control27 (13): 1078–1091.
  • Yano, C. A. 1987. “Setting Planning Lead Times in Serial Production Systems with Earliness Costs.” Management Science 33 (1): 95–106.
  • Yegnanarayana, Bayya. 2009. Artificial Neural Networks. New Delhi: PHI Learning Pvt. Ltd.
  • Zhang, G. Peter. 2006. “Avoiding Pitfalls in Neural Network Research.” IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews) 37 (1): 3–16.