1,052
Views
4
CrossRef citations to date
0
Altmetric
Articles

Dynamic scheduling in make-to-stock production systems with setup times and random breakdowns: performance analysis and improved policies

&
Pages 3263-3281 | Received 04 Nov 2020, Accepted 30 Mar 2021, Published online: 06 May 2021

References

  • Adelman, D., and C. Barz. 2014. “A Unifying Approximate Dynamic Programming Model for the Economic Lot Scheduling Problem.” Mathematics of Operations Research 39 (2): 374–402.
  • Akella, R., and P. R. Kumar. 1986. “Optimal Control of Production Rate in a Failure Prone Manufacturing System.” IEEE Transactions on Automatic Control 31 (2): 116–126.
  • Allahverdi, A. 2015. “The Third Comprehensive Survey on Scheduling Problems with Setup Times/costs.” European Journal of Operational Research 246 (2): 345–378.
  • Allahverdi, A., and H. Soroush. 2008. “The Significance of Reducing Setup Times/setup Costs.” European Journal of Operational Research 187 (3): 978–984.
  • Assid, M., A. Gharbi, and A. Hajji. 2014. “Joint Production and Setup Control Policies of Unreliable Manufacturing Systems Minimizing the Incurred Total Cost and Taking Into Account Other Criteria.” The International Journal of Advanced Manufacturing Technology 72: 809–826.
  • Assid, M., A. Gharbi, and A. Hajji. 2015. “Joint Production, Setup and Preventive Maintenance Policies of Unreliable Two-product Manufacturing Systems.” International Journal of Production Research 53 (15): 4668–4683.
  • Assid, M., A. Gharbi, and A. Hajji. 2020. “Production and Subcontracting Control for An Unreliable Manufacturing System with Setups.” International Journal of Production Research 58 (12): 3570–3588.
  • Benner, P., V. Mehrmann, V. Sima, S. Van Huffel, and A. Varga. 1999. SLICOT–A Subroutine Library in Systems and Control Theory. Boston, MA: Springer.
  • Bielecki, T., and P. R. Kumar. 1988. “Optimality of Zero-inventory Policies for Unreliable Manufacturing Systems.” Operations Research 36 (4): 532–541.
  • Chase, C., and P. J. Ramadge. 1992. “On Real-time Scheduling Policies for Flexible Manufacturing Systems.” IEEE Transactions on Automatic Control 37 (4): 491–496.
  • Connolly, S., Y. Dallery, and S. B. Gershwin. 1992. “A Real-Time Policy for Performing Setup Changes in a Manufacturing System.” 764–770.
  • Dai, J., and O. Jennings. 2004. “Stabilizing Queueing Networks with Setups.” Mathematics of Operations Research 29 (4): 891–922.
  • Dobson, G. 1987. “The Economic Lot-scheduling Problem: Achieving Feasibility Using Time-varying Lot Sizes.” Operations Research 35 (5): 764–771.
  • Duenyas, I., and M. van Oyen. 1996. “Heuristic Scheduling of Parallel Heterogeneous Queues with Set-ups.” Management Science 42 (6): 814–829.
  • Elhafsi, M. 1997. “The Common Cycle Economic Lot Scheduling Problem with Backorders: Benefits of Controllable Production Rates.” Journal of Global Optimization 10: 283–303.
  • Elhafsi, M., and S. Bai. 1996. “Optimal Production Control of a Dynamic Two-product Manufacturing System with Setup Costs and Setup Times.” Journal of Global Optimization 9: 183–216.
  • Elmaghraby, S. 1978. “The Economic Lot Scheduling Problem (ELSP): Review and Extensions.” Management Science 24 (6): 587–598.
  • Federgruen, A., and Z. Katalan. 1996. “The Stochastic Economic Lot Scheduling Problem: Cyclical Base-stock Policies with Idle Times.” Management Science 42 (6): 783–796.
  • Gallego, G. 1990. “Scheduling the Production of Several Items with Random Demands in a Single Facility.” Management Science 36 (12): 1579–1592.
  • Gallego, G. 1994. “When is a Base Stock Policy Optimal in Recovering Disrupted Cyclic Schedules?” Naval Research Logistics 41: 317–333.
  • Gallego, G., and R. Roundy. 1992. “The Economic Lot Scheduling Problem with Finite Backorder Costs.” Naval Research Logistics 39: 729–739.
  • Gel, E. S., J. W. Fowler, and K. Khowala. 2020. “Queuing Approximations for Capacity Planning Under Common Setup Rules.” IISE Transactions 1–19.
  • Gershwin, S. 1989. “Hierarchical Flow Control: a Framework for Scheduling and Planning Discrete Events in Manufacturing Systems.” Proceedings of the IEEE 77 (1): 195–209.
  • Gershwin, S. B. 1997. “Design and Operation of Manufacturing Systems: A Controls-based Synthesis.” European Journal of Control 3: 166–181.
  • Gershwin, S. 2000. “Design and Operation of Manufacturing Systems: The Control-point Policy.” IIE Transactions 32 (10): 891–906.
  • Graves, S. 1980. “The Multi-product Production Cycling Problem.” AIIE Transactions 12 (3): 233–240.
  • Graves, S. 1981. “A Review of Production Scheduling.” Operations Research 29 (4): 646–675.
  • Hajji, A., A. Gharbi, and J. P. Kenne. 2004. “Production and Set-up Control of a Failure-prone Manufacturing System.” International Journal of Production Research 42: 1107–1130.
  • Hsu, W. 1983. “On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine.” Management Science 29 (1): 93–105.
  • Kibouka, G. R., D. Nganga-Kouya, J. P. Kenné, V. Polotski, and V. Songmene. 2018. “Maintenance and Setup Planning in Manufacturing Systems Under Uncertainties.” Journal of Quality in Maintenance Engineering 24 (2): 170–184.
  • Kibouka, G. R., D. Nganga-Kouya, J. P. Kenne, V. Songmene, and V. Polotski. 2016. “Production Planning of a Failure-prone Manufacturing System Under Different Setup Scenarios.” Journal of Applied Mathematics 2016.
  • Kimemia, J., and S. B. Gershwin. 1983. “An Algorithm for the Computer Control of a Flexible Manufacturing System.” IIE Transactions 15 (4): 353–362.
  • Lan, W. M. 2000. “Dynamic Scheduling of Multi-Product Systems With Setups: Bounds and Heuristics.” Ph.D. thesis.
  • Lan, W. M., and T. L. Olsen. 2006. “Multiproduct Systems with Both Setup Times and Costs: Fluid Bounds and Schedules.” Operations Research 54 (3): 505–522.
  • Levy, H., and M. Sidi. 1990. “Polling Systems: Applications, Modeling, and Optimization.” Communications, IEEE Transactions on 38 (10): 1750–1760.
  • Löhndorf, N., and S. Minner. 2013. “Simulation Optimization for the Stochastic Economic Lot Scheduling Problem.” IIE Transactions (Institute of Industrial Engineers) 45 (7): 796–810.
  • Maes, J., and L. Wassenhove. 1988. “Multi-item Single-level Capacitated Dynamic Lot-sizing Heuristics: A General Review.” The Journal of the Operational Research Society 39 (11): 991–1004.
  • Markowitz, D., M. Reiman, and L. Wein. 2000. “The Stochastic Economic Lot Scheduling Problem: Heavy Traffic Analysis of Dynamic Cyclic Policies.” Operations Research 48 (1): 136–154.
  • Moon, I., and E. A. Silver. 2002. “Hybrid Genetic Algorithm for the Economic Lot-scheduling Problem.” International Journal of Production Research 40 (4): 809–824.
  • Perkins, J. R., and P. R. Kumar. 1989. “Stable, Distributed, Real-time Scheduling of Flexible Manufacturing/assembly/disassembly Systems.” IEEE Transactions on Automatic Control 34 (2): 139–148.
  • Perkins, J. R., and R. Srikant. 1997. “Scheduling Multiple Part-types in An Unreliable Single-machine Manufacturing System.” IEEE Transactions on Automatic Control 42 (3): 364–377.
  • Polotski, V., J. P. Kenné, and A. Gharbi. 2015. “Failure-prone Manufacturing Systems with Setups: Feasibility and Optimality Under Various Hypotheses About Perturbations and Setup Interplay.” International Journal of Mathematics in Operational Research 7 (6): 681–705.
  • Santander-Mercado, A., and M. Jubiz-Diaz. 2016. “The Economic Lot Scheduling Problem: a Survey.” International Journal of Production Research 54 (16): 4973–4992.
  • Sharifnia, A., M. Caramanis, and S. B. Gershwin. 1991. “Dynamic Setup Scheduling and Flow Control in Manufacturing Systems.” Discrete Event Dynamic Systems 1: 149–175.
  • Shingo, S, and Andrew P. Dillon. 1989. A Study of the Toyota Production System from an Industrial Engineering Viewpoint. Boca Raton, FL: CRC Press.
  • Sox, C., P. Jackson, A. Bowman, and J. Muckstadt. 1999. “A Review of the Stochastic Lot Scheduling Problem.” International Journal of Production Economics 62: 181–200.
  • Srivatsan, N., and Y. Dallery. 1998. “Partial Characterization of Optimal Hedging Point Policies in Unreliable Two-part-type Manufacturing Systems.” Operations Research 46 (1): 36–45.
  • Takagi, H. 1988. “Queuing Analysis of Polling Models.” ACM Computing Surveys (CSUR) 20 (1): 5–28.
  • Tivellato, A. 2017. “JOptimizer-Java Convex Optimizer”. https://mvnrepository.com/artifact/com.joptimizer/joptimizer.
  • Trigeiro, W., L. Thomas, and J. McClain. 1989. “Capacitated Lot Sizing with Setup Times.” Management Science 35 (3): 353–366.
  • Tubilla, F. 2011. “Dynamic Scheduling of Manufacturing Systems With Setups and Random Disruptions.” Ph.D. thesis.
  • Tubilla, F. 2021a. Datasets for “Dynamic Scheduling in Make-to-Stock Production Systems with Setup Times and Random Breakdowns.” doi: https://doi.org/10.24433/CO.2840170.v1.
  • Tubilla, F. 2021b. “Simulation Code Used in “Dynamic Scheduling in Make-to-Stock Production Systems with Setup Times and Random Breakdowns: Performance Analysis and Improved Policies.” doi: https://doi.org/10.24433/CO.1142374.v1.
  • Tubilla, F., and S. B. Gershwin. 2014. “Stability of Prioritized Scheduling Policies in Manufacturing Systems with Setup Times.” IEEE Transactions on Automatic Control 59 (6): 1606–1611.
  • Winands, E. M. M., I. J. B. F. Adan, and G. J. van Houtum. 2011. “The Stochastic Economic Lot Scheduling Problem: A Survey.” European Journal of Operational Research 210 (1): 1–9.
  • Yan, H., and Q. Zhang. 1997. “A Numerical Method in Optimal Production and Setup Scheduling of Stochastic Manufacturing Systems.” IEEE Transactions on Automatic Control 42 (10): 1452–1455.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.