638
Views
6
CrossRef citations to date
0
Altmetric
Research Article

Systematic literature review of repair shops: focus on sustainability

, &
Pages 7093-7112 | Received 04 Jan 2021, Accepted 16 Oct 2021, Published online: 22 Nov 2021

References

  • Abbey, J. D., and V. D. R. Guide. 2018. “A Typology of Remanufacturing in Closed-Loop Supply Chains.” International Journal of Production Research 56 (1–2): 374–384. doi:10.1080/00207543.2017.1384078.
  • Adan, I. J. B. F., A. Sleptchenko, and G. J. Van Houtum. 2009. “Reducing Costs of Spare Parts Supply Systems via Static Priorities.” Asia-Pacific Journal of Operational Research 26 (04): 559–585. doi:10.1142/S0217595909002377.
  • Al-Refaie, A., H. Al-Shalaldeh, and N. Lepkova. 2020. “Proposed Procedure for Optimal Maintenance Scheduling Under Emergent Failures.” Journal of Civil Engineering and Management 26 (4): 396–409. doi:10.3846/jcem.2020.12315.
  • Aramon, M., and J. Beck. 2014. “Scheduling a Dynamic Aircraft Repair Shop with Limited Repair Resources.” Journal of Artificial Intelligence Research 47 (February), doi:10.1613/jair.3902.
  • Arts, J. 2017. “A Multi-Item Approach to Repairable Stocking and Expediting in a Fluctuating Demand Environment.” European Journal of Operational Research 256 (1): 102–115. doi:10.1016/j.ejor.2016.06.003.
  • Assadi, M., M. Mobin, H. Cheraghi, and Z. Li. 2019. “An Algorithm for Performance Evaluation of Closed-Loop Spare Supply Systems With Generally Distributed Failure and Repair Times.” IEEE Transactions on Reliability 68 (2): 678–688. doi:10.1109/TR.2018.2881378.
  • Azadeh, A., S. F. Ghaderi, S. Pashapour, A. Keramati, M. Rezaei Malek, and M. Esmizadeh. 2017. “A Unique Fuzzy Multivariate Modeling Approach for Performance Optimization of Maintenance Workshops with Cognitive Factors.” The International Journal of Advanced Manufacturing Technology 90 (1–4): 499–525. doi:10.1007/s00170-016-9208-x.
  • Azadeh, A., S. Motevali Haghighi, S. M. Asadzadeh, and H. Saedi. 2013. “A New Approach for Layout Optimization in Maintenance Workshops with Safety Factors: The Case of a Gas Transmission Unit.” Journal of Loss Prevention in the Process Industries 26 (6): 1457–1465. doi:10.1016/j.jlp.2013.09.014.
  • Basten, R. J. I., and G. J. van Houtum. 2014. “System-Oriented Inventory Models for Spare Parts.” Surveys in Operations Research and Management Science 19 (1): 34–55. doi:10.1016/j.sorms.2014.05.002.
  • Batista, L., Y. Gong, S. Pereira, F. Jia, and A. Bittar. 2019. “Circular Supply Chains in Emerging Economies – a Comparative Study of Packaging Recovery Ecosystems in China and Brazil.” International Journal of Production Research 57 (23): 7248–7268. doi:10.1080/00207543.2018.1558295.
  • Bressanelli, G., M. Perona, and N. Saccani. 2019. “Challenges in Supply Chain Redesign for the Circular Economy: A Literature Review and a Multiple Case Study.” International Journal of Production Research 57 (23): 7395–7422. doi:10.1080/00207543.2018.1542176.
  • Buyukkaramikli, N. C., H. P. G. van Ooijen, and J. W. M. Bertrand. 2015. “Integrating Inventory Control and Capacity Management at a Maintenance Service Provider.” Annals of Operations Research 231 (1): 185–206. doi:10.1007/s10479-013-1506-1.
  • Chan, F., and A. Prakash. 2012. “Inventory Management in a Lateral Collaborative Manufacturing Supply Chain: A Simulation Study.” International Journal of Production Research 50: 4670–4685. doi:10.1080/00207543.2011.628709.
  • Chua, R. C. H., G. D. Scudder, and A. V. Hill. 1993. “Batching Policies for a Repair Shop with Limited Spares and Finite Capacity.” European Journal of Operational Research 66 (1): 135–147. doi:10.1016/0377-2217(93)90212-6.
  • De Smidt-Destombes, K. S., M. C. van der Heijden, and A. van Harten. 2004. “On the Availability of a K-out-of-N System Given Limited Spares and Repair Capacity Under a Condition Based Maintenance Strategy.” Reliability Engineering & System Safety 83 (3): 287–300. doi:10.1016/j.ress.2003.10.004.
  • De Smidt-Destombes, K. S., M. C. van der Heijden, and A. van Harten. 2007. “Availability of -out-of- Systems Under Block Replacement Sharing Limited Spares and Repair Capacity.” International Journal of Production Economics 107 (2): 404–421. doi:10.1016/j.ijpe.2006.08.013.
  • Dibbern, J., T. Goles, R. Hirschheim, and B. Jayatilaka. 2004. “Information Systems Outsourcing: A Survey and Analysis of the Literature.” ACM SIGMIS Database 35 (4): 6–102. doi:10.1145/1035233.1035236.
  • Dreyfuss, M., Y. Giat, and A. Stulman. 2018. “An Analytical Approach to Determine the Window Fill Rate in a Repair Shop with Cannibalization.” Computers & Operations Research 98: 13–23. doi:10.1016/j.cor.2018.05.018.
  • Driessen, M. A., G. J. van Houtum, W. H. M. Zijm, and W. D. Rustenburg. 2020. “Capacity Assignment in Repair Shops with High Material Uncertainty.” International Journal of Production Economics, S0925527319303020. doi:10.1016/j.ijpe.2019.09.005.
  • García-Benito, J. C., and M. Martín-Peña. 2020. “A Redistribution Model with Minimum Backorders of Spare Parts: A Proposal for the Defence Sector.” European Journal of Operational Research, doi:10.1016/j.ejor.2020.09.014.
  • Guide, V. D. R., R. Srivastava, and M. E. Kraus. 2000. “Priority Scheduling Policies for Repair Shops.” International Journal of Production Research 38 (4): 929–950. doi:10.1080/002075400189220.
  • Hani, Y., L. Amodeo, F. Yalaoui, and H. Chen. 2007. “Ant Colony Optimization for Solving an Industrial Layout Problem.” European Journal of Operational Research 183 (2): 633–642. doi:10.1016/j.ejor.2006.10.032.
  • Jaber, M. Y., S. Zanoni, and L. E. Zavanella. 2014. “Economic Order Quantity Models for Imperfect Items with Buy and Repair Options.” International Journal of Production Economics 155: 126–131. doi:10.1016/j.ijpe.2013.10.014.
  • Keizers, J., I. Adan, and J. van der Wal. 2001. “A Queuing Model for Due Date Control in a Multiserver Repair Shop.” Naval Research Logistics 48 (4): 281–292. doi:10.1002/nav.8.
  • Kim, B. K., and D. H. Lee. 2014. “The M/G/1 Queue with Disasters and Working Breakdowns.” Applied Mathematical Modelling 38 (5–6): 1788–1798. doi:10.1016/j.apm.2013.09.016.
  • Kleber, R., S. Zanoni, and L. Zavanella. 2011. “On How Buyback and Remanufacturing Strategies Affect the Profitability of Spare Parts Supply Chains.” International Journal of Production Economics 133 (1): 135–142. doi:10.1016/j.ijpe.2010.04.020.
  • Li, B., X. Li, W. Guo, and S. Wu. 2013. “A Generalized Stochastic Petri-net Model for Performance Analysis and Allocation Optimization of a Particular Repair System.” Asia-Pacific Journal of Operational Research 30 (01): 1250042. doi:10.1142/S021759591250042X.
  • Liang, W. K., B. Balcıoglu, and R. Svaluto. 2013. “Scheduling Policies for a Repair Shop Problem.” Annals of Operations Research 211 (1): 273–288. doi:10.1007/s10479-013-1412-6.
  • Lin, G. C., A. Wu, D. Gong, B. Huang, and W. Ma. 2014. “On a Multi-Product Lot Scheduling Problem Subject to an Imperfect Process with Standby Modules.” International Journal of Production Research 52 (8): 2243–2257. doi:10.1080/00207543.2013.854936.
  • Luh, P. B., D. Yu, S. Soorapanth, A. I. Khibnik, and R. Rajamani. 2005. “A Lagrangian Relaxation Based Approach to Schedule Asset Overhaul and Repair Services.” IEEE Transactions on Automation Science and Engineering 2 (2): 145–157. doi:10.1109/TASE.2005.844221.
  • Mabini, M. C., and A. H. Christer. 2002. “Controlling Multi-Indenture Repairable Inventories of Multiple Aircraft Parts.” Journal of the Operational Research Society 53 (12): 1297–1307. doi:10.1057/palgrave.jors.2601431.
  • Öztürk, Harun. 2020. “Economic Order Quantity Models for the Shipment Containing Defective Items with Inspection Errors and a Sub-Lot Inspection Policy.” European J. of Industrial Engineering 14 (1): 85. https://doi.org/10.1504/EJIE.2020.105085.
  • Parker, D. L., A. Bejan, and L. M. Brosseau. 2012. “A Qualitative Evaluation of Owner and Worker Health and Safety Beliefs in Small Auto Collision Repair Shops.” American Journal of Industrial Medicine 55 (5): 474–482. doi:10.1002/ajim.22027.
  • Psarommatis, F., G. May, P. A. Dreyfus, and D. Kiritsis. 2020. “Zero Defect Manufacturing: State-of-the-art Review, Shortcomings and Future Directions in Research.” International Journal of Production Research 7543: 1–17. doi:10.1080/00207543.2019.1605228.
  • Riisgaard, H., M. Mosgaard, and K. O. Zacho. 2016. “Local Circles in a Circular Economy – the Case of Smartphone Repair in Denmark.” European Journal of Sustainable Development 5 (1): 109–109. doi:10.14207/ejsd.2016.v5n1p109.
  • Safaei, N., D. Banjevic, and A. K. S. Jardine. 2011. “Workforce-Constrained Maintenance Scheduling for Military Aircraft Fleet: A Case Study.” Annals of Operations Research 186 (1): 295–316. doi:10.1007/s10479-011-0885-4.
  • Sahba, P., B. Balcioglu, and D. Banjevic. 2013. “Spare Parts Provisioning for Multiple k -out-of- n: G Systems.” IIE Transactions 45 (9): 953–963. doi:10.1080/0740817X.2012.695102.
  • Sahba, P., and B. Balcıoglu. 2011. “The Impact of Transportation Delays on Repairshop Capacity Pooling and Spare Part Inventories.” European Journal of Operational Research 214 (3): 674–682. doi:10.1016/j.ejor.2011.05.022.
  • Sahba, P., B. Balcıoglu, and D. Banjevic. 2018. “Multilevel Rationing Policy for Spare Parts When Demand Is State Dependent.” OR Spectrum 40 (3): 751–780. doi:10.1007/s00291-018-0518-2.
  • Sanchez, D. T., B. Boyacı, and K. G. Zografos. 2020. “An Optimisation Framework for Airline Fleet Maintenance Scheduling with Tail Assignment Considerations.” Transportation Research Part B: Methodological 133: 142–164. doi:10.1016/j.trb.2019.12.008.
  • Sanjuán-Herráez, D., I. Lliso, A. Pastor, and M. de la Guardia. 2012. “Green Determination of the Presence of Volatile Organic Compounds in Vehicle Repair Shops Through Passive Sampling.” Talanta 98: 40–48. doi:10.1016/j.talanta.2012.06.034.
  • Scudder, G. D. 1984. “Priority Scheduling and Spares Stocking Policies for a Repair Shop: The Multiple Failure Case.” Management Science 30 (6): 739–749. doi:10.1287/mnsc.30.6.739.
  • Scudder, G. D. 1985. “An Evaluation of Overtime Policies for a Repair Shop.” Journal of Operations Management 6 (1): 87–98. doi:10.1016/0272-6963(85)90037-3.
  • Scudder, G. D., and R. Chua. 1987. “Determining Overtime Policies for a Repair Shop.” Omega 15 (3): 197–206. doi:10.1016/0305-0483(87)90070-3.
  • Shi, H., J. Yang, and J. Si. 2020. “Centralized Maintenance Time Prediction Algorithm for Freight Train Wheels Based on Remaining Useful Life Prediction.” Research Article.” Mathematical Problems in Engineering, doi:10.1155/2020/9256312.
  • Shivasankaran, N., P. Senthil Kumar, G. Nallakumarasamy, and K. Venkatesh Raja. 2013. “repair Shop job Scheduling with Parallel Operators and Multiple Constraints Using Simulated Annealing.” International Journal of Computational Intelligence Systems 6 (2): 223–233. doi:10.1080/18756891.2013.768434.
  • Simeu-Abazi, Z., and A. A. Ahmad. 2011. “Optimisation of Distributed Maintenance: Modelling and Application to the Multi-Factory Production.” Reliability Engineering & System Safety 96 (11): 1564–1575. doi:10.1016/j.ress.2011.05.011.
  • Simeu-Abazi, Z., M. Di Mascolo, and E. Gascard. 2012. “Performance Evaluation of Centralized Maintenance Workshop by Using Queuing Networks.” IFAC Proceedings Volumes, 2nd IFAC Workshop on Advanced Maintenance Engineering, Services and Technology 45 (31): 175–180. doi:10.3182/20121122-2-ES-4026.00012.
  • Simeu-Abazi, Z., M. Di Mascolo, and E. Gascard. 2014. “Queuing Network-Based Methodology for Designing and Assessing Performance of Centralized Maintenance Workshops. Edited by Adolfo Crespo Márquez, Benot Iung, Marco.” Journal of Manufacturing Technology Management 25 (4): 510–527. doi:10.1108/JMTM-03-2013-0025.
  • “SJR: Scientific Journal Rankings.”. 2020. Accessed December 11. https://www.scimagojr.com/journalrank.php.
  • Sleptchenko, A., H. H. Turan, S. Pokharel, and T. Y. ElMekkawy. 2019. “Cross-Training Policies for Repair Shops with Spare Part Inventories.” International Journal of Production Economics 209: 334–345. doi:10.1016/j.ijpe.2017.12.018.
  • Sleptchenko, A., M. C. van der Heijden, and A. van Harten. 2002. “Effects of Finite Repair Capacity in Multi-Echelon, Multi-Indenture Service Part Supply Systems.” International Journal of Production Economics 79 (3): 209–230. doi:10.1016/S0925-5273(02)00155-X.
  • Sleptchenko, A., M. van der Heijden, and A. van Harten. 2003. “Trade-off Between Inventory and Repair Capacity in Spare Part Networks.” Journal of the Operational Research Society 54 (March): 263–272. doi:10.1057/palgrave.jors.2601511.
  • Sleptchenko, A., M. C. van der Heijden, and A. van Harten. 2005. “Using Repair Priorities to Reduce Stock Investment in Spare Part Networks.” European Journal of Operational Research 163 (3): 733–750. doi:10.1016/j.ejor.2004.02.002.
  • Smith, M. A. J., and R. Dekker. 1997. “Preventive Maintenance in a 1 out of n System: The Uptime, Downtime and Costs.” European Journal of Operational Research 99 (3): 565–583. doi:10.1016/S0377-2217(96)00321-9.
  • Spanjers, L., J. C. W. van Ommeren, and W. H. M. Zijm. 2005. “Closed Loop Two-Echelon Repairable Item Systems.” OR Spectrum 27 (2–3): 369–398. doi:10.1007/s00291-004-0190-6.
  • Taleizadeh, A. A., M. P. S. Khanbaglo, and L. E. Cárdenas-Barrón. 2016. “An EOQ Inventory Model with Partial Backordering and Reparation of Imperfect Products.” International Journal of Production Economics 182: 418–434. doi:10.1016/j.ijpe.2016.09.013.
  • Tiemessen, H. G. H., and G. J. van Houtum. 2013. “Reducing Costs of Repairable Inventory Supply Systems via Dynamic Scheduling.” International Journal of Production Economics 143 (2): 478–488. doi:10.1016/j.ijpe.2012.08.008.
  • Turan, H. H., A. Sleptchenko, S. Pokharel, and T. Y. ElMekkawy. 2018. “A Clustering-Based Repair Shop Design for Repairable Spare Part Supply Systems.” Computers & Industrial Engineering 125: 232–244. doi:10.1016/j.cie.2018.08.032.
  • Turan, H. H., A. Sleptchenko, S. Pokharel, and T. Y. ElMekkawy. 2020. “A Sorting Based Efficient Heuristic for Pooled Repair Shop Designs.” Computers & Operations Research 117 (May): 104887. doi:10.1016/j.cor.2020.104887.
  • Türkeli, S., B. Huang, A. Stasik, and R. Kemp. 2019. “Circular Economy as a Glocal Business Activity: Mobile Phone Repair in the Netherlands, Poland and China.” Energies 12 (3): 498. doi:10.3390/en12030498.
  • Van Eck, N. J., and L. Waltman. 2010. “Software Survey: VOSviewer, a Computer Program for Bibliometric Mapping.” Scientometrics 84 (2): 523–538.
  • Van Jaarsveld, W., T. Dollevoet, and R. Dekker. 2015. “Improving Spare Parts Inventory Control at a Repair Shop.” Omega 57: 217–229. doi:10.1016/j.omega.2015.05.002.
  • Van Ommeren, J. C. W., A. F. Bumb, and A. V. Sleptchenko. 2006. “Locating Repair Shops in a Stochastic Environment.” Computers & Operations Research 33 (6): 1575–1594. doi:10.1016/j.cor.2004.11.008.
  • Van Ooijen, H., J. W. M. Bertrand, and N. C. Buyukkaramikli. 2019. “Coordinating Failed Goods Collecting and Repair Capacity Policies in the Maintenance of Commoditized Capital Goods.” International Journal of Production Economics 208: 29–42. doi:10.1016/j.ijpe.2018.11.001.
  • Wagner, E., E. Bracquené, and M. Jaeger-Erben. 2021. “Exploring 14 Years of Repair Records – Information Retrieval, Analysis Potential and Data Gaps to Improve Reparability.” Journal of Cleaner Production 281: 125259. doi:10.1016/j.jclepro.2020.125259.
  • Wang, L., J. Chu, and W. Mao. 2008. “An Optimum Condition-Based Replacement and Spare Provisioning Policy Based on Markov Chains.” Journal of Quality in Maintenance Engineering 14 (4): 387–401. doi:10.1108/13552510810909984.
  • Whittaker, S. G. 2003. “Lead Exposure in Radiator Repair Workers: A Survey of Washington State Radiator Repair Shops and Review of Occupational Lead Exposure Registry Data.” Journal of Occupational and Environmental Medicine 45 (7): 724–733. doi:10.1097/01.jom.0000079083.95532.b5.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.