659
Views
7
CrossRef citations to date
0
Altmetric
Research Articles

A multi-vendor multi-buyer integrated production-inventory model with synchronised unequal-sized batch delivery

ORCID Icon, ORCID Icon, & ORCID Icon
Pages 462-484 | Received 05 Feb 2021, Accepted 08 Nov 2021, Published online: 17 Dec 2021

References

  • Abdul-Jalbar, B., J. M. Gutiérrez, and J. Sicilia. 2006. “Single Cycle Policies for the One-Warehouse N-Retailer Inventory/Distribution System.” Omega 34 (2): 196–208.
  • Abdul-Jalbar, B., J. M. Gutiérrez, and J. Sicilia. 2007. “An Integrated Inventory Model for the Single-Vendor Two-Buyer Problem.” International Journal of Production Economics 108 (1-2): 246–258.
  • Aderohunmu, R., A. Mobolurin, and R. Bryson. 1995. “Joint Vendor-Buyer Policy in JIT Manufacturing.” Journal of the Operational Research Society 46: 375–385.
  • Affrisco, J. F., M. J. Paknejad, and F. Nasri. 1993. “A Comparison of Alternative Joint Vendor-Purchaser Lot-Sizing Models.” International Journal of Production Research 31: 2661–2676.
  • Alfares, H. K., and A. M. Attia. 2017. “A Supply Chain Model with Vendor-Managed Inventory, Consignment, and Quality Inspection Errors.” International Journal of Production Research 55 (19): 5706–5727.
  • Banerjee, A. 1986. “A Joint Economic Lot Size Model for Purchaser and Vendor.” Decision Science 17: 292–311.
  • Banerjee, A. 1992. “Production Lot Sizing with Work-in-Process Considerations in Response to Periodic Demand.” International Journal of Production Research 26 (1–3): 145–151.
  • Banerjee, A., and J. S. Burton. 1994. “Coordinated vs. Independent Inventory Replenishment Policies for a Vendor and Multiple Buyers.” International Journal of Production Economics 35 (1-3): 215–222.
  • Banerjee, A., S. L. Kim, and J. Burton. 2007. “Supply Chain Coordination Through Effective Multi-Stage Inventory Linkages in a JIT Environment.” International Journal of Production Economics 108 (1): 271–280.
  • Beck, F. G., C. H. Glock, and T. Kim. 2017. “Coordination of a Production Network with a Single Buyer and Multiple Vendors with Geometrically Increasing Batch Shipments.” International Journal of Production Economics 193 (C): 633–646.
  • Ben-Daya, M., R. As’ad, and M. Seliaman. 2013b. “An Integrated Production Inventory Model with Raw Material Replenishment Considerations in a Three-Layer Supply Chain.” International Journal of Production Economics 143 (1): 53–61.
  • Ben-Daya, M., E. Hassini, M. Hariga, and M. M. Aldurgam. 2013a. “Consignment and Vendor Managed Inventory in Single-Vendor Multiple Buyers Supply Chains.” International Journal Production Research 51 (5): 1347–1365.
  • Brahmbhatt, A. C., and M. C. Jaiswal. 1980. “An Order-Level-Lot-Size Model with Uniform Replenishing Rate and Variable Mark-Up of Prices.” International Journal of Production Research 18 (5): 655–664.
  • Bylka, S. 1999. “Dynamic Model for the Single-Vendor, Multi-Buyer Problem.” International Journal of Production Economics 59 (1-3): 297–304.
  • Bylka, S. 2009. “Non-Cooperative Strategies for Production and Shipments Lot Sizing in the Vendor-Buyer System.” International Journal Production Economics 118 (1): 243–252.
  • Bylka, S. 2020. “The Consignment Stock of Inventories Under Buyer’s Warehouse Space Limitation.” International Journal of Production Research 58 (3): 912–930.
  • Bylka, S., and P. Górny. 2015. “The Consignment Stock of Inventories in Coordinated Model with Generalized Policy.” Computers and Industrial Engineering 82 (C): 54–64.
  • Chakraborty, A., A. K. Chatterjee, and A. Mateen. 2015. “A Vendor-Managed Inventory Scheme as a Supply Chain Coordination Mechanism.” International Journal of Production Research 53 (1): 13–24.
  • Chan, C. K., and B. G. Kingsman. 2007. “Coordination in a Single-Vendor Multi-Buyer Supply Chain by Synchronizing Delivery and Production Cycles.” Transportation Research Part E: Logistics and Transportation Review 43 (2): 90–111.
  • Chang, C. T., C. C. Chiou, Y. S. Liao, and S. C. Chang. 2008. “An Exact Policy for Enhancing Buyer-Supplier Linkage in Supply Chain System.” International Journal of Production Economics 113: 470–479.
  • Chen, Z. X., and B. R. Sarker. 2010. “Multi-Vendor Integrated Procurement-Production System Under Shared Transportation and Just-in-Time Delivery System.” Journal of Operational Research Society 61 (11): 1654–1666.
  • Chen, Z., and B. R. Sarker. 2014. “An Integrated Optimal Inventory Lot-Sizing and Vehicle-Routing Model for a Multi-Supplier Single-Assembler System with JIT Delivery.” International Journal of Production Research 52 (17): 5086–5114.
  • Chiu, H. N., and H. L. Huang. 2003. “A Multi-Echelon Integrated JIT Inventory Model Using the Time Buffer and Emergency Borrowing Policies to Deal with Random Delivery Lead Times.” International Journal of Production Research 41 (13): 2911–2931.
  • Chu, C. L., and V. J. Leon. 2008. “Single-Vendor Multi-Buyer Inventory Coordination Under Private Information.” European Journal of Operational Research 191: 484–502.
  • Dehghanbaghi, N., and M. S. Sajadieh. 2017. “Joint Optimization of Production, Transportation and Pricing Policies of Complementary Products in a Supply Chain.” Computers and Industrial Engineering 107 (C): 150–157.
  • Duong, L. N. K., and J. Chong. 2020. “Supply Chain Collaboration in the Presence of Disruptions: a Literature Review.” International Journal of Production Research 58 (11): 3488–3507.
  • Dutt, R., and S. K. Goyal. 1975. “An Integrated Cutting Tool Life, Batch Quantity Model.” International Journal of Production Research 13 (6): 615–622.
  • Elhafsi, M., and E. Hamouda. 2018. “Managing an Integrated Production and Inventory System Selling to a Dual Market: Long-Term and Walk-In.” European Journal of Operational Research 268 (1): 215–230.
  • Ertogral, K., M. Darwish, and M. Ben-Daya. 2007. “Production and Shipment lot Sizing in a Vendor-Buyer Supply Chain with Transportation Cost.” European Journal of Operational Research 176 (3): 1592–1606.
  • Ganesh Kumar, M., and R. Uthayakumar. 2019. “Multi-item Inventory Model with Variable Backorder and Price Discount Under Trade Credit Policy in Stochastic Demand.” International Journal of Production Research 57 (1): 298–320.
  • Ghasemkhani, A., R. Tavakkoli-Moghaddam, Y. Rahimi, S. Shahnejat-Bushehri, and H. Tavakkoli-Moghaddam. 2021. “Integrated Production-Inventory-Routing Problem for Multi-Perishable Products Under Uncertainty by Meta-Heuristic Algorithms.” International Journal of Production Research. doi:10.1080/00207543.2021.1902013.
  • Ghasemy Yaghin, R., S. M. T. Fatemi Ghomi, and S. A. Torabi. 2014. “Enhanced Joint Pricing and Lotsizing Problem in a Two-Echelon Supply Chain with Logit Demand Function.” International Journal of Production Research 52 (17): 4967–4983.
  • Giri, B. C., A. Chakraborty, and T. Maiti. 2017. “Consignment Stock Policy with Unequal Shipments and Process Unreliability for a Two-Level Supply Chain.” International Journal of Production Research 55 (9): 2489–2505.
  • Giri, B. C., and S. Sharma. 2014. “Lot Sizing and Unequal-Sized Shipment Policy for an Integrated Production-Inventory System.” International Journal of Systems Science 45 (5): 888–901.
  • Glock, C. H. 2012a. “Lead Time Reduction Strategies in a Single-Vendor-Single-Buyer Integrated Inventory Model with Lot Size-Dependent Lead Times and Stochastic Demand.” International Journal of Production Economics 136 (1): 37–44.
  • Glock, C. H. 2012b. “Coordination of a Production Network with a Single Buyer and Multiple Vendors.” International Journal of Production Economics 135 (2): 771–780.
  • Glock, C. H., and T. Kim. 2014. “Shipment Consolidation in a Multiple-Vendor-Single-Buyer Integrated Inventory Model.” Computers and Industrial Engineering 70: 31–42.
  • Goyal, S. K. 1973. “A Method for Improving Joint Replenishment Systems with a Known Frequency of Replenishment Orders.” International Journal of Production Research 11 (2): 195–200.
  • Goyal, S. K. 1974. “Two Methods for the Analysis of a Joint Replenishment System with Known Order Frequencies.” International Journal of Production Research 12 (6): 721–724.
  • Goyal, S. K. 1975a. “Scheduling a Multi-Product Single Machine System A New Approach.” International Journal of Production Research 13 (5): 487–493.
  • Goyal, S. K. 1975b. “Economic Packaging Frequency for Finite Horizon Inventory Problems.” International Journal of Production Research 13 (4): 383–389.
  • Goyal, S. K. 1976. “Note On: Manufacturing Cycle Time Determination for a Multi- Stage Production Quantity Model.” Management Science 23: 332–333.
  • Goyal, S. K. 1977. “Improving the Solution of a Finite Horizon Inventory Problem Under Certainty.” International Journal of Production Research 15 (2): 173–178.
  • Goyal, S. K. 1978. “Economic Batch Quantity in a Multi-Stage Production System.” International Journal of Production Research 16 (4): 267–273.
  • Goyal, S. K. 1988a. “Economic Ordering Policy for Jointly Replenished Items.” International Journal of Production Research 26 (7): 1237–1240.
  • Goyal, S. K. 1988b. “A Joint Economic Lot Size Model for Purchaser and Vendor: A Comment.” Decision Science 19: 236–241.
  • Goyal, S. K. 1995. “A One-Vendor Multi-Buyer Integrated Inventory Model: A Comment.” European Journal of Operational Research 82: 209–210.
  • Goyal, S. K., and F. Nebebe. 2000. “Determination of Economic Production-Shipment Policy for a Single-Vendor-Single-Buyer System.” European Journal of Operational Research 121 (1): 175–178.
  • Goyal, S. K., and A. Z. Szendrovits. 1986. “A Constant Lot Size Model with Equal and Unequal Sized Batch Shipments Between Production Stages.” Engineering Costs and Production Economics 10: 203–210.
  • Gross, D., C. M. Harris, and D. Robers. 1972. “Bridging the Gap Between Mathematical Inventory Theory and the Construction of a Workable Model – A Case Study.” International Journal of Production Research 10 (3): 201–214.
  • Gupta, O. K. 1992. “A Lot-Size Model with Discrete Transportation Costs.” Computers and Industrial Engineering 22 (4): 397–402.
  • Ha, D., and S. Kim. 1997. “Implementation of JIT Purchasing: An Integrated Approach.” Production Planning and Control 8 (2): 152–157.
  • Hahm, J., and C. A. Yano. 1992. “The Economic lot and Delivery Scheduling Problem: The Single Item Case.” International Journal of Production Economics 28 (2): 235–252.
  • Hariga, M., C. H. Glock, and T. Kim. 2016. “Integrated Product and Container Inventory Model for a Single-Vendor Single-Buyer Supply Chain with Owned and Rented Returnable Transport Items.” International Journal of Production Research 54 (7): 1964–1979.
  • Hariga, M., M. Gumus, M. Ben-Daya, and E. Hassini. 2013. “Scheduling and Lot Sizing Models for the Single-Vendor Multi-Buyer Problem Under Consignment Stock Partnership.” Journal of Operational Research Society 64 (7): 995–1009.
  • Hemmati, M., S. M. T. Fatemi Ghomi, and M. S. Sajadieh. 2017. “Vendor Managed Inventory with Consignment Stock for Supply Chain with Stock- and Price-Dependent Demand.” International Journal of Production Research 55 (18): 5225–5242.
  • Hill, R. M. 1997. “The Single-Vendor Single-Buyer Integrated Production-Inventory Model with a Generalized Policy.” European Journal of Operational Research 97 (3): 493–499.
  • Hill, R. M. 1999. “The Optimal Production and Shipment Policy for the Single-Vendor Single-Buyer Integrated Production-Inventory Problem.” International Journal of Production Research 37 (11): 2463–2475.
  • Hill, R. M., and M. Omar. 2006. “Another Look at the Single-Vendor Single-Buyer Integrated Production-Inventory Problem.” International Journal of Production Research 44 (4): 791–800.
  • Hoque, M. A. 2008. “Synchronization in the Single-Manufacturer Multi-Buyer Integrated Inventory Supply Chain.” European Journal of Operational Research 188 (3): 811–825.
  • Hoque, M. A. 2009. “An Alternative Optimal Solution Technique for a Single-Vendor Single-Buyer Integrated Production Inventory Model.” International Journal of Production Research 47 (15): 4063–4076.
  • Hoque, M. A. 2011a. “An Optimal Solution Technique to the Single-Vendor Multi-Buyer Integrated Inventory Supply Chain by Incorporating Some Realistic Factors.” European Journal of Operational Research 215 (1): 80–88.
  • Hoque, M. A. 2011b. “Generalized Single-Vendor Multi-Buyer Integrated Inventory Supply Chain Models with a Better Synchronization.” International Journal of Production Economics 131 (2): 463–472.
  • Hoque, M. A., and S. K. Goyal. 2000. “An Optimal Policy for a Single-Vendor Single-Buyer Integrated Production-Inventory System with Capacity Constraint of the Transport Equipment.” International Journal of Production Economics 65 (3): 305–315.
  • Huang, C. K., T. L. Cheng, T. C. Kao, and S. K. Goyal. 2011. “An Integrated Inventory Model Involving Manufacturing Setup Cost Reduction in Compound Poisson Process.” International Journal of Production Research 49 (4): 1219–1228.
  • Huang, H. F., Y. He, and D. Li. 2018. “Coordination of Pricing, Inventory, and Production Reliability Decisions in Deteriorating Product Supply Chains.” International Journal of Production Research 56 (18): 6201–6224.
  • Jaber, M. Y., S. Zanoni, and L. E. Zavanella. 2014. “A Consignment Stock Coordination Scheme for the Production, Remanufacturing and Waste Disposal Problem.” International Journal of Production Research 52 (1): 50–65.
  • Jha, J. K., and K. Shanker. 2009. “A Single-Vendor Single-Buyer Production-Inventory Model with Controllable Lead Time and Service Level Constraint for Decaying Items.” International Journal of Production Research 47 (24): 6875–6898.
  • Jha, J. K., and K. Shanker. 2013a. “A Coordinated Two-Phase Approach for Operational Decisions with Vehicle Routing in a Single-Vendor Multi-Buyer System.” International Journal of Production Research 51 (5): 1426–1450.
  • Jha, J. K., and K. Shanker. 2013b. “Single-Vendor Multi-Buyer Integrated Production-Inventory Model with Controllable Lead Time and Service Level Constraints.” Applied Mathematical Modelling 37 (4): 1753–1767.
  • Joglekar, P. N., and S. Tharthare. 1990. “Individually Responsible and Rational Decision Approach to Economic Lot Sizes for One Vendor and Many Purchasers.” Decision Sciences 21: 450–492.
  • Kaspi, M., and M. J. Rosenblatt. 1991. “On the Economic Ordering Quantity for Jointly Replenished Items.” International Journal of Production Research 29 (1): 107–114.
  • Kaya, O., D. Kubali, and L. Omeci. 2013. “Stochastic Models for the Coordinated Production and Shipment Problem in a Supply Chain.” Computers and Industrial Engineering 64 (3): 838–849.
  • Kim, T. 2018. “An Integrated Model for Production and Batch Shipments for Ramp-Up Production.” Computers and Industrial Engineering 118: 138–152.
  • Kim, S. L., A. Banerjee, and J. Burton. 2008. “Production and Delivery Policies for Enhanced Supply Chain Partnerships.” International Journal of Production Research 46 (22): 6207–6229.
  • Kim, S. L., and D. Ha. 2003. “A JIT Lot-Splitting Model for Supply Chain Management: Enhancing Buyer-Supplier Linkage.” International Journal of Production Economics 86: 1–10.
  • Kim, T., Y. Hong, and S. Y. Chang. 2006. “Joint Economic Procurement-Production-Delivery Policy for Multiple Items in a Single-Manufacturer, Multiple-Retailer System.” International Journal of Production Economics 103: 199–208.
  • Kim, T., Y. Hong, and J. Lee. 2005. “Joint Economic Production Allocation and Ordering Policies in a Supply Chain Consisting of Multiple Plants and a Single Retailer.” International Journal of Production Research 43 (17): 3619–3632.
  • Kirschstein, T., and F. Meisel. 2019. “A Multi-Period Multi-Commodity Lot-Sizing Problem with Supplier Selection, Storage Selection and Discounts for the Process Industry.” European Journal of Operational Research 279: 393–406.
  • Klosterhalfen, S. T., F. Holzhauer, and M. Fleischmann. 2018. “Control of a Continuous Production Inventory System with Production Quantity Restrictions.” European Journal of Operational Research 268 (2): 569–581.
  • Kreng, V. B., and F. T. Chen. 2007. “Three Echelon Buyer-Supplier Delivery Policy – A Supply Chain Collaboration Approach.” Production Planning and Control 18 (4): 338–349.
  • Kumar, R., L. Ganapathy, R. Gokhale, and M. K. Tiwari. 2020. “Quantitative Approaches for the Integration of Production and Distribution Planning in the Supply Chain: A Systematic Literature Review.” International Journal of Production Research 58 (11): 3527–3553.
  • Lee, W. 2005. “A Joint Economic Lot Size Model for raw Material Ordering, Manufacturing Setup, and Finished Goods Delivering.” Omega 33 (2): 163–174.
  • Lee, S. D., and Y. C. Fu. 2013. “Joint Production and Shipment Lot Sizing for a Delivery Price-Based Production Facility.” International Journal of Production Research 51 (20): 6152–6162.
  • Lee, S. D., and Y. C. Fu. 2014. “Joint Production and Delivery Lot Sizing for a Make-to-Order Producer-Buyer Supply Chain with Transportation Cost.” Transportation Research Part E: Logistics and Transportation Review 66: 23–35.
  • Lee, W., and S. Wang. 2008. “Managing Level of Consigned Inventory with Buyer’s Warehouse Capacity Constraint.” Production Planning and Control 19 (7): 677–685.
  • Li, Y., F. Chu, C. Chu, and Z. Zhu. 2019. “An Efficient Three-Level Heuristic for the Large-Scaled Multi-Product Production Routing Problem with Outsourcing.” European Journal of Operational Research 272 (3): 914–927.
  • Liu, X. C., and S. Cetinkaya. 2011. “The Supplier-Buyer Integrated Production-Inventory Model with Random Yield.” International Journal of Production Research 49 (13): 4043–4061.
  • Long, J., M. Panos, M. Pardalos, and C. Li. 2021. “Level-Based Multi-Objective Particle Swarm Optimizer for Integrated Production Scheduling and Vehicle Routing Decision with Inventory Holding, Delivery, and Tardiness Costs.” International Journal of Production Research. doi:10.1080/00207543.2021.1919780.
  • Lu, L. 1995. “A One-Vendor Multi-Buyer Integrated Inventory Model.” European Journal of Operational Research 81 (2): 312–323.
  • Ma, K., R. Pal, and E. Gustafsson. 2019. “What Modelling Research on Supply Chain Collaboration Informs Us? Identifying Key Themes and Future Directions Through a Literature Review.” International Journal of Production Research 57 (7): 2203–2225.
  • Miranda, P. L., J. F. Cordeau, D. Ferreira, R. Jans, and R. Morabito. 2018. “A Decomposition Heuristic for a Rich Production Routing Problem.” Computers and Operations Research 98: 211–230.
  • Mustafa, A., and S. T. Yildiz. 2019. “A Matheuristic Solution Approach for the Production Routing Problem with Visit Spacing Policy.” European Journal of Operational Research 279 (2): 572–588.
  • Omar, M. 2009. “An Integrated Equal-Lots Policy for Shipping a Vendor’s Final Production Batch to a Single Buyer Under Linearly Decreasing Demand.” International Journal of Production Economics 118 (1): 185–188.
  • Ouyang, L. Y., L. Y. Chen, and C. T. Yang. 2013. “Impacts of Collaborative Investment and Inspection Policies on the Integrated Inventory Model with Defective Items.” International Journal of Production Research 51 (19): 5789–5802.
  • Pan, J. C. H., and J. S. Yang. 2002. “A Study of an Integrated Inventory with Controllable Lead Time.” International Journal of Production Research 40 (5): 1263–1273.
  • Pan, J. C. H., and M. F. Yang. 2008. “Integrated Inventory Models with Fuzzy Annual Demand and Fuzzy Production Rate in a Supply Chain.” International Journal of Production Research 46 (3): 753–770.
  • Park, S. S., T. Kim, and Y. Hong. 2006. “Production Allocation and Shipment Policies in a Multiple-Manufacturer-Single-Retailer Supply Chain.” International Journal of Systems Science 37 (3): 163–171.
  • Peng, X. S., S. F. Ji, and T. T. Ji. 2020. “Promoting Sustainability of the Integrated Production-Inventory-Distribution System Through the Physical Internet.” International Journal of Production Research 58 (22): 6985–7004.
  • Rau, H., and B. C. Ouyang. 2008. “An Optimal Batch Size for Integrated Production-Inventory Policy in a Supply Chain.” European Journal of Operational Research 3 (2): 215–230.
  • Roy, M. D., S. S. Sana, and K. Chaudhuri. 2012. “An Integrated Producer-Buyer Relationship in the Environment of EMQ and JIT Production Systems.” International Journal of Production Research 50 (19): 5597–5614.
  • Sarker, R. A., and L. R. Khan. 2001. “An Optimal Batch Size Under Periodic Delivery Policy.” International Journal of Systems Science 32 (9): 1089–1099.
  • Sen, N., S. Bardhan, and B. C. Giri. 2021. “Effectiveness of Consignment Stock Policy Under Space Limitations and Deterioration.” International Journal of Production Research 59 (6): 1834–1851.
  • Sharafali, M., and H. C. Co. 2000. “Some Models for Understanding the Cooperation Between the Supplier and the Buyer.” International Journal of Production Research 38 (15): 3425–3449.
  • Siajadi, H., R. N. Ibrahim, and B. Lochert. 2006. “Joint Economic Lot Size in Distribution System with Multiple Shipment Policy.” International Journal of Production Economics 102 (2): 302–316.
  • Tang, J., K. L. Yung, I. Kaku, and J. Yang. 2008. “The Scheduling of Deliveries in a Production-Distribution System with Multiple Buyers.” Annals of Operations Research 161 (1): 5–23.
  • Tsai, D. M. 2011. “An Optimal Production and Shipment Policy for a Single-Vendor Single-Buyer Integrated System with Both Learning Effect and Deteriorating Items.” International Journal of Production Research 49 (3): 903–922.
  • Uthayakumar, R., and M. Rameswari. 2012. “An Integrated Inventory Model for a Single Vendor and Single Buyer with Order-Processing Cost Reduction and Process Mean.” International Journal of Production Research 50 (11): 2910–2924.
  • Viswanathan, S., and R. Piplani. 2001. “Coordinating Supply Chain Inventories Through Common Replenishment Epochs.” European Journal of Operational Research 129: 277–286.
  • Wu, B. Q., and B. R. Sarker. 2013. “Optimal Manufacturing and Delivery Schedules in a Supply Chain System of Deteriorating Items.” International Journal of Production Research 51 (3): 798–812.
  • Yang, J. S., and J. C. H. Pan. 2004. “Just-in-Time Purchasing: An Integrated Inventory Model Involving Deterministic Variable Lead Time and Quality Improvement Investment.” International Journal of Production Research 42 (5): 853–863.
  • Yao, M. J., and C. C. Chiou. 2004. “On a Replenishment Coordination Model in an Integrated Supply Chain with One Vendor and Multiple Buyers.” European Journal of Operational Research 159 (2): 406–419.
  • Yi, H., and B. R. Sarker. 2013. “An Optimal Consignment Stock Production and Replenishment Policy with Controllable Lead Time.” International Journal of Production Research 51 (21): 6316–6335.
  • Zahran, S. K., M. Y. Jaber, and S. Zanoni. 2017. “Comparing Different Coordination Scenarios in a Three-Level Supply Chain System.” International Journal of Production Research 55 (14): 4068–4088.
  • Zanoni, S., and M. Y. Jaber. 2015. “A Two-Level Supply Chain with Consignment Stock Agreement and Stock-Dependent Demand.” International Journal of Production Research 53 (12): 3561–3572.
  • Zavanella, L., and S. Zanoni. 2009. “A One-Vendor Multi-Buyer Integrated Production-Inventory Model: The ‘Consignment Stock’ Case.” International Journal of Production Economics 118: 225–232.
  • Zhang, T., L. Liang, Y. Yu, and Y. Yu. 2007. “An Integrated Vendor-Managed Inventory Model for a Two-Echelon System with Order Cost Reduction.” International Journal of Production Economics 109 (1-2): 241–253.
  • Zoller, K. 1979. “Efficient Order Quantities: The Dynamic Case.” International Journal of Production Research 17 (4): 377–394.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.