640
Views
10
CrossRef citations to date
0
Altmetric
Research Articles

Optimal maintenance policy for equipment leased with base and extended warranty

&
Pages 898-909 | Received 03 May 2021, Accepted 28 Oct 2021, Published online: 05 Jan 2022

References

  • Aras, N., R. Gullu, and S. Yurulmez. 2011. “Optimal Inventory and Pricing Policies for Remanufacturable Leased Products.” International Journal of Production Economics 133: 262–271.
  • Ben Mabrouk, A., and A. Chelbi. 2020. Optimal maintenance policy for equipment leased with warranty. 13th International Conference on Modeling, Optimization and Simulation - MOSIM’20, November 12-14, Agadir – Morocco, p. 1-6.
  • Ben Mabrouk, A., A. Chelbi, and M. Radhoui. 2016a. “Optimal Imperfect Preventive Maintenance Policy for Equipment Leased During Successive Periods.” International Journal of Production Research 54 (17): 5095–5110.
  • Ben Mabrouk, A., A. Chelbi, and M. Radhoui. 2016b. “Optimal Imperfect Maintenance Strategy for Leased Equipment.” International Journal of Production Economics 178: 57–64.
  • Ben Mabrouk, A., A. Chelbi, and M. Radhoui. 2017. Optimal hybrid imperfect preventive maintenance policy for leased equipment. The 20th World Congress of the International Federation of Automatic Control, July, Toulouse, France,p. 1-6.
  • Ben Mabrouk, A., A. Chelbi, L. Tlili, and M. Radhoui. 2019. “A Quasi-Optimal Inspection Strategy for Leased Equipment.” International Journal of Production Research 58 (3): 878–892.
  • Blischke, W. R., and D. N. P. Murthy, 1994. Warranty Cost Analysis, Marcel Dekker, New York.
  • Bouguerra, S., A. Chelbi, and N. Rezg. 2012. “A Decision Model for Adopting an Extended Warranty Under Different Maintenance Policies.” International Journal of Production Economics 135 (2): 840–849.
  • Chang, W., and H. Lo. 2011. “Joint Determination of Lease Period and Preventive Maintenance Policy for Leased Equipment with Residual Value.” Computers & Industrial Engineering 61 (3): 489–496.
  • Chattopadhyay, G., and A. Rahman. 2008. “Development of Lifetime Warranty Policies and Models for Estimating Costs.” Reliability Engineering and System Safety 93 (4): 522–529.
  • Chien, Y. H. 2008. “A new Warranty Strategy: Combining a Renewing Free-Replacement Warranty with a Rebate Policy.” Quality and Reliability Engineering International 24 (7): 807–815.
  • Chien, Y. H. 2010. “Optimal age for Preventive Replacement Under a Combined Fully Renewable Free Replacement with a pro-Rata Warranty.” International Journal of Production Economics 124 (1): 198–205.
  • Chien, Y. H., Z. G. Zhang, and X. Yin. 2019. “On Optimal Preventive-Maintenance Policy for Generalized Polya Process Repairable Products Under Free-Repair Warranty.” European Journal of Operational Research 279 (1): 68–78.
  • Darghouth, M. N., A. Chelbi, and D. Ait-kadi. 2017. “Investigating Reliability Improvement of Second-Hand Production Equipment Considering Warranty and Preventive Maintenance Strategies.” International Journal of Production Research 55 (16): 4643–4661. DOI: 10.1080/00207543.2016.1277277.
  • Hajej, Z., N. Rezg, and A. Gharbi. 2015. “A Decision Optimization Model for Leased Manufacturing Equipment with Warranty Under Forecasting Production/Maintenance Problem.” Mathematical Problems in Engineering 2015:274530, 1-14.
  • Hajej, Z., N. Rezg, and A. Gharbi. 2016. “An Optimal Production/Maintenance Strategy Under Lease Contract with Warranty Periods.” Journal of Quality in Maintenance Engineering 22 (1): 35–50.
  • Jaturonnatee, J., D. Murthy, and R. Boondiskulchok. 2006. “Optimal Preventive Maintenance of Leased Equipment with Corrective Minimal Repairs.” European Journal of Operational Research 174 (1): 201–215.
  • Khatab, A., D. Ait-Kadi, and N. Rezg. 2014. “Availability Optimisation for Stochastic Degrading Systems Under Imperfect Preventive Maintenance.” International Journal of Production Research 52 (14): 4132–4141.
  • Kim, C. S., I. Djamaludin, and D. N. P. Murthy. 2004. “Warranty and Discrete Preventive Maintenance.” Reliability Engineering and System Safety 84 (3): 301–309.
  • Li, X., Z. Liu, Y. Wang, and M. Li. 2018. “Optimal Burn-in Strategy for two-Dimensional Warranted Products Considering Preventive Maintenance.” International Journal of Production Research 57 (17), 5414–5543.
  • Liao, W., E. Pan, and L. Xi. 2010. “Preventive Maintenance Scheduling for Repairable System with Deterioration.” Journal of Intelligent Manufacturing 21 (6): 875–884.
  • Lin, D., M. Zuo, and R. Yam. 2000. “General Sequential Imperfect Preventive Maintenance Models.” International Journal of Reliability, Quality and Safety Engineering 7 (3): 253–266.
  • Lin, D., M. Zuo, and R. Yam. 2001. “Sequential Imperfect Preventive Maintenance Models with two Categories of Failure Modes.” Naval Research Logistics 48 (2): 172–183.
  • Malik, M. 1979. “Reliable Preventive Maintenance Scheduling.” A I I E Transactions 11 (3): 221–228.
  • Murthy, D. N. P., and I. Djamaludin. 2002. “New Product Warranty: A Literature Review.” International Journal of Production Economics 79 (3): 231–260.
  • Nakagawa, T. 1988. “Sequential Imperfect Preventive Maintenance Policies.” IEEE Transactions on Reliability 37 (3): 295–298.
  • Pongpech, J., and D. Murthy. 2006. “Optimal Periodic Preventive Maintenance Policy for Leased Equipment.” Reliability Engineering & System Safety 91 (7): 772–777.
  • Pongpech, J., D. Murthy, and R. Boondiskulchock. 2006. “Maintenance Strategies for Used Equipment Under Lease.” Journal of Quality in Maintenance Engineering 12 (1): 52–67.
  • Schutz, J., and N. Rezg. 2013. “Maintenance Strategy for Leased Equipment.” Computers & Industrial Engineering 66 (3): 593–600.
  • Shafiee, M., and S. Chukova. 2013. “Maintenance Models in Warranty: A Literature Review.” European Journal of Operational Research 229 (3): 561–572.
  • Wang, X., L. Lishuai, and X. Min. 2018. “Optimal Preventive Maintenance Strategy for Leased Equipment Under Successive Usage-Based Contracts.” International Journal of Production Research 57 (18): 5705–5724.
  • Wang, X., and W. Xie. 2018. “Two-dimensional Warranty: A Literature Review.” Proceedings of the Institution of Mechanical Engineers, Part O Journal of Risk and Reliability 232 (3): 284–307.
  • Wu, S. 2012. “Warranty Data Analysis: A Review.” Quality and Reliability Engineering International 28 (8): 795–805.
  • Yeh, R., and W. Chang. 2007. “Optimal Threshold Value of Failure-Rate for Leased Products with Preventive Maintenance Actions.” Mathematical and Computer Modelling 46 (5-6): 730–737.
  • Yeh, R., K. Kao, and W. Chang. 2009. “Optimal Preventive Maintenance Policy for Leased Equipment Using Failure Rate Reduction.” Computers & Industrial Engineering 57 (1): 304–309.
  • Yeh, R., K. Kao, and W. Chang. 2011. “Preventive-maintenance Policy for Leased Products Under Various Maintenance Costs.” Expert Systems with Applications 38 (4): 3558–3562.
  • Zhou, X., Y. Li, L. Xi, and J. Lee. 2014. “Multi-phase Preventive Maintenance Policy for Leased Equipment.” International Journal of Production Research 53 (15): 4528–4537.
  • Zhou, X., L. Xi, and J. Lee. 2007. “Reliability-centered Predictive Maintenance Scheduling for a Continuously Monitored System Subject to Degradation.” Reliability Engineering & System Safety 92 (4): 530–534.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.