287
Views
4
CrossRef citations to date
0
Altmetric
Research Articles

Optimal repetitive reliability inspection of manufactured lots for lifetime models using prior information

ORCID Icon, , ORCID Icon &
Pages 2214-2230 | Received 05 Jul 2021, Accepted 03 Apr 2022, Published online: 05 May 2022

References

  • Ahmadi Nadi, A., and B. Sadeghpour Gildeh. 2019. “A Group Multiple Dependent State Sampling Plan Using Truncated Life Test for the Weibull Distribution.” Quality Engineering 31: 553–563.
  • Arizono, I., Y. Kawamura, and Y. Takemoto. 2008. “Reliability Tests for Weibull Distribution with Variational Shape Parameter Based on Sudden Death Lifetime Data.” European Journal of Operational Research 189: 570–574.
  • Arizono, I., Y. Okada, R. Tomohiro, and Y. Takemoto. 2016. “Rectifying Inspection for Acceptable Quality Loss Limit Based on Variable Repetitive Group Sampling Plan.” The International Journal of Advanced Manufacturing Technology 85: 2413–2423.
  • Aslam, M., M. Azam, and C.-H. Jun. 2013. “A Mixed Repetitive Sampling Plan Based on Process Capability Index.” Applied Mathematical Modelling 37: 10027–10035.
  • Aslam, M., S. Balamurali, C.-H. Jun, and M. Rasool. 2013. “Optimal Designing of Skip-Lot Sampling Plan of Type SkSP-2 with Group Acceptance Sampling Plan As Reference Plan Under Burr-type XII Distribution.” Journal of Statistical Computation and Simulation 83: 37–51.
  • Aslam, M., C.-H. Jun, A. J. Fernández, M. Ahmad, and M. Rasool. 2014. “Repetitive Group Sampling Plan Based on Truncated Tests for Weibull Models.” Research Journal of Applied Sciences, Engineering and Technology 7: 1917–1924.
  • Aslam, M., S. T. A. Niaki, M. Rasool, and M. S. Fallahnezhad. 2012. “Decision Rule of Repetitive Acceptance Sampling Plans Assuring Percentile Life.” Scientia Iranica 19: 879–884.
  • Aslam, M., C.-H. Yen, C.-H. Chang, A. H. Al-Marshadi, and C.-H. Jun. 2019. “A Multiple Dependent State Repetitive Sampling Plan Based on Performance Index for Lifetime Data with Type II Censoring.” IEEE Access 7: 49377–49391.
  • Aslam, M., C.-H. Yen, C.-H. Chang, and C.-H. Jun. 2013. “Multiple States Repetitive Group Sampling Plans with Process Loss Consideration.” Applied Mathematical Modelling 37: 9063–9075.
  • Balamurali, S., P. Jeyadurga, and M. Usha. 2018. “Optimal Design of Repetitive Group Sampling Plans for Weibull and Gamma Distributions with Applications and Comparison to the Birnbaum–Saunders Distribution.” Journal of Applied Statistics 45: 2499–2520.
  • Balamurali, S., and C.-H. Jun. 2006. “Repetitive Group Sampling Procedure for Variables Inspection.” Journal of Applied Statistics 33: 327–338.
  • Balamurali, S., H. Park, C.-H. Jun, K.-J. Kim, and J. Lee. 2005. “Designing of Variables Repetitive Group Sampling Plan Involving Minimum Average Sample Number.” Communications in Statistics - Simulation and Computation 34: 799–809.
  • Balamurali, S., and J. Subramani. 2012. “Optimal Designing of Skip-Lot Sampling Plan of Type SkSP-2 with Double Sampling Plan As the Reference Plan.” Journal of Statistical Theory and Practice 6: 354–362.
  • Bhattacharyya, G. K. 1985. “On Asymptotics of Maximum Likelihood and Related Estimators Based on Type II Censored Data.” Journal of the American Statistical Association 80: 398–404.
  • Chakrabarty, J. B., S. Chowdhury, and S. Roy. 2020. “Optimum Life Test Plan for Type-I Hybrid Censored Weibull Distributed Products Sold Under General Rebate Warranty.” International Journal of Production Research 58: 5693–5706.
  • Chen, J. W., K. H. Li, and Y. Lam. 2007. “Bayesian Single and Double Variable Sampling Plans for the Weibull Distribution with Censoring.” European Journal of Operational Research 177: 1062–1073.
  • Dodge, H. F. 1955. “Skip-Lot Sampling Plan.” Industrial Quality Control 11: 3–5.
  • Fernández, A. J. 2011. “Optimal Reliability Demonstration Test Plans for k-Out-of-n Systems of Gamma Distributed Components.” IEEE Transactions on Reliability 60: 833–844.
  • Fernández, A. J. 2014. “Computing Tolerance Limits for the Lifetime of a k-Out-of-n:F System Based on Prior Information and Censored Data.” Applied Mathematical Modelling 38: 548–561.
  • Fernández, A. J. 2015a. “Optimal Schemes for Resubmitted Lot Acceptance Using Previous Defect Count Data.” Computers & Industrial Engineering 87: 66–73.
  • Fernández, A. J. 2015b. “Optimum Attributes Component Test Plans for k-Out-of-n:F Weibull Systems Using Prior Information.” European Journal of Operational Research 240: 688–696.
  • Fernández, A. J. 2020. “Explicit Lot Inspection by Attributes Using Minimal Prior Information.” Computers & Industrial Engineering 148: Article ID 106743.
  • Fernández, A. J. 2022. “Optimum Lot Inspection Based on Lognormal Reliability Tests.” International Journal of Production Research. doi:10.1080/00207543.2022.2036852.
  • Fernández, A. J., and C. J. Pérez-González. 2012a. “Generalized Beta Prior Models on Fraction Defective in Reliability Test Planning.” Journal of Computational and Applied Mathematics 236: 3147–3159.
  • Fernández, A. J., and C. J. Pérez-González. 2012b. “Optimal Acceptance Sampling Plans for Log-Location–Scale Lifetime Models Using Average Risks.” Computational Statistics & Data Analysis56 (3): 719–731.
  • Fernández, A. J., C. J. Pérez-González, M. Aslam, and C.-H. Jun. 2011. “Design of Progressively Censored Group Sampling Plans for Weibull Distributions: An Optimization Problem.” European Journal of Operational Research 211: 525–532.
  • Fernández, A. J., C. J. Pérez-González, and A. Kohansal. 2019. “Improved Time-censored Reliability Test Plans for k-Out-of-n Gamma Systems.” Journal of Computational and Applied Mathematics 361: 42–54.
  • Fernández, A. J., C. J. Pérez-González, and M. Suárez-Rancel. 2021. “Optimal Lot Sentencing Based on Defective Counts and Prior Acceptability.” Journal of Computational and Applied Mathematics 388: Article ID 113317.
  • He, Y., L. Wang, Z. He, and X. Xiao. 2016. “Modelling Infant Failure Rate of Electromechanical Products with Multilayered Quality Variations From Manufacturing Process.” International Journal of Production Research 54: 6594–6612.
  • He, Y., Y. Zhao, Y. Wei, A. Zhang, and D. Zhou. 2019. “Modeling and Detecting Approach for the Change Point of Electronic Product Infant Failure Rate.” Microelectronics Reliability 99: 222–231.
  • Hsieh, C.-C., and Y.-T. Lu. 2013. “Risk-embedded Bayesian Acceptance Sampling Plans Via Conditional Value-at-Risk with Type II Censoring.” Computers & Industrial Engineering 65: 551–560.
  • Hsu, B.-M., M.-H. Shu, and T.-C. Wang. 2020. “Variables Adjustable Multiple Dependent State Sampling Plans with a Loss-based Capability Index.” The International Journal of Advanced Manufacturing Technology 107: 2163–2175.
  • Jaheen, Z. F., and H. M. Okasha. 2011. “E-Bayesian Estimation for the Burr Type XII Model Based on Type-2 Censoring.” Applied Mathematical Modelling 35: 4730–4737.
  • Jun, C.-H., H. Lee, S.-H. Lee, and S. Balamurali. 2010. “A Variables Repetitive Group Sampling Plan Under Failure-Censored Reliability Tests for Weibull Distribution.” Journal of Applied Statistics 37: 453–460.
  • Kannan, G., P. Jeyadurga, and S. Balamurali. 2022. “Determination of Multiple Deferred State Repetitive Group Sampling Plan for Life Time Assurance Under Birnbaum–Saunders Distribution.” Journal of Statistical Computation and Simulation 92: 145–158.
  • Khan, N., M. Aslam, L. Ahmad, and C.-H. Jun. 2019. “Multiple Dependent State Repetitive Sampling Plans with Or Without Auxiliary Variable.” Communications in Statistics - Simulation and Computation 48: 1055–1069.
  • Kharchenko, V. A. 2015. “Problems of Reliability of Electronic Components.” Modern Electronic Materials 1: 88–92.
  • Kurniati, N., R. H. Yeh, and C.-W. Wu. 2015. “Designing a Variables Two-plan Sampling System of Type TNTVSS- (nT,nN;k) for Controlling Process Fraction Nonconforming with Unilateral Specification Limit.” International Journal of Production Research 53: 2011–2025.
  • Lee, D., and R. Pan. 2017. “Predictive Maintenance of Complex System with Multi-level Reliability Structure.” International Journal of Production Research 55: 4785–4801.
  • Lee, A. H. I., C. W. Wu, and Y. W. Chen. 2016. “A Modified Variables Repetitive Group Sampling Plan with the Consideration of Preceding Lots Information.” Annals of Operations Research 238: 355–373.
  • Lee, W.-C., J.-W. Wu, and C.-W. Hong. 2009. “Assessing the Lifetime Performance Index of Products with the Exponential Distribution Under Progressively Type II Right Censored Samples.” Journal of Computational and Applied Mathematics 231: 648–656.
  • Lee, W.-C., J.-W. Wu, M.-L. Hong, L.-S. Lin, and R.-L. Chan. 2011. “Assessing the Lifetime Performance Index of Rayleigh Products Based on the Bayesian Estimation Under Progressive Type II Right Censored Samples.” Journal of Computational and Applied Mathematics 235: 1676–1688.
  • Liu, S.-W., S.-W. Lin, and C.-W. Wu. 2014. “A Resubmitted Sampling Scheme by Variables Inspection for Controlling Lot Fraction Nonconforming.” International Journal of Production Research 52: 3744–3754.
  • Liu, S.-W., and C.-W. Wu. 2016. “A Quick Switching Sampling System by Variables for Controlling Lot Fraction Nonconforming.” International Journal of Production Research 54: 1839–1849.
  • Lu, W., and T.-R. Tsai. 2009. “Interval Censored Sampling Plans for the Gamma Lifetime Model.” European Journal of Operational Research 192: 116–124.
  • Murugeswari, N., P. Jeyadurga, and S. Balamurali. 2021. “Optimal Design of a Skip-Lot Sampling Reinspection Plan with a Double Sampling Plan As a Reference Plan.” Sequential Analysis 40: 370–380.
  • Nezhad, M. S. F., and S. Seifi. 2017. “Repetitive Group Sampling Plan Based on the Process Capability Index for the Lot Acceptance Problem.” Journal of Statistical Computation and Simulation 87: 29–41.
  • Obaidat, S., and H. Liao. 2020. “Integrated Decision Making for Attributes Sampling and Proactive Maintenance in a Discrete Manufacturing System.” International Journal of Production Research 59: 5454–5476.
  • Pérez-González, C. 2021. “RepetPlan: Design of Failured-Censored Repetitive Group Sampling Plans." R package version 1.0.3. doi:10.5281/zenodo.5035779.
  • Pérez-González, C. J., and A. J. Fernández. 2013. “Classical Versus Bayesian Risks in Acceptance Sampling: A Sensitivity Analysis.” Computational Statistics 28: 1333–1350.
  • Pérez-González, C. J., A. J. Fernández, and A. Kohansal. 2020. “Efficient Truncated Repetitive Lot Inspection Using Poisson Defect Counts and Prior Information.” European Journal of Operational Research 287: 964–974.
  • Pérez-González, C. J., A. J. Fernández, A. Kohansal, and A. Asgharzadeh. 2019. “Optimal Truncated Repetitive Lot Inspection with Defect Rates.” Applied Mathematical Modelling 75: 223–235.
  • Perry, R. L. 1973. “Skip-Lot Sampling Plans.” Journal of Quality Technology 5 (3): 123–130.
  • Sherman, R. E. 1965. “Design and Evaluation of Repetitive Group Sampling Plan.” Technometrics 7: 11–21.
  • Suresh, K. K., and S. Umamaheswari. 2016. “A Study on Skip-Lot Sampling Plan with Repetitive Deferred Sampling Plan Under Bayesian Perspective.” Journal of Statistics and Management Systems19: 451–472.
  • Tsai, T.-R., Y. T. Lu, and S.-J. Wu. 2008. “Reliability Sampling Plans for Weibull Distribution with Limited Capacity of Test Facility.” Computers & Industrial Engineering 55: 721–728.
  • Wang, T.-C., B.-M. Hsu, and M.-H. Shu. 2021. “An Integrated Quick-Switch Sampling System Based on a Process Capability Index for Constructing a Solid Supplier–Buyer Relationship.” International Journal of Production Research. doi:10.1080/00207543.2021.1991598.
  • Wang, K., and F. Tsung. 2022. “Bayesian Cross-product Quality Control Via Transfer Learning.” International Journal of Production Research 60: 847–865.
  • Wu, C.-W., A. H. I. Lee, and Y.-S. Huang. 2021a. “A Variable-type Skip-Lot Sampling Plan for Products with a Unilateral Specification Limit.” International Journal of Production Research 59: 4140–4156.
  • Wu, C.-W., A. H. I. Lee, and Y.-S. Huang. 2021b. “Developing a Skip-Lot Sampling Scheme by Variables Inspection Using Repetitive Sampling As a Reference Plan.” International Journal of Production Research. doi:10.1080/00207543.2021.1909768.
  • Wu, C.-W., and S.-W. Liu. 2018. “A New Lot Sentencing Approach by Variables Inspection Based on Process Yield.” International Journal of Production Research 56: 4087–4099.
  • Wu, X., R. Miao, X. Zhang, Z. Jiang, and X. Chu. 2015. “A Conjugate Bayesian Approach to Control Chart for Multi-batch and Low Volume Production.” International Journal of Production Research 53: 2179–2185.
  • Wu, C.-W., and Z.-H. Wang. 2017. “Developing a Variables Multiple Dependent State Sampling Plan with Simultaneous Consideration of Process Yield and Quality Loss.” International Journal of Production Research 55: 2351–2364.
  • Wu, C.-W., T.-H. Wu, and T. Chen. 2015. “Developing a Variables Repetitive Group Sampling Scheme by Considering Process Yield and Quality Loss.” International Journal of Production Research 53: 2239–2251.
  • Yan, A., S. Liu, and M. Azam. 2017. “Designing a Multiple State Repetitive Group Sampling Plan Based on the Coefficient of Variation.” Communications in Statistics - Simulation and Computation 46: 7154–7165.
  • Zhang, H., U. Roy, and Y.-T. T. Lee. 2020. “Enriching Analytics Models with Domain Knowledge for Smart Manufacturing Data Analysis.” International Journal of Production Research 58: 6399–6415.
  • Ziani, R., M.-S. Ouali, and A. Artiba. 2014. “Sensibility of Bayesian Inference Methods for Reliability Prediction of Ageing Systems, Case of Diesel Locomotives.” International Journal of Production Research 52: 4142–4155.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.