662
Views
14
CrossRef citations to date
0
Altmetric
Research Articles

Optimizing a stochastic disassembly line balancing problem with task failure via a hybrid variable neighborhood descent-artificial bee colony algorithm

, , , , &
Pages 2307-2321 | Received 18 Sep 2021, Accepted 29 Mar 2022, Published online: 30 Apr 2022

References

  • Ahmed, J., and Z. Salam. 2017. “An Accurate Method for MPPT to Detect the Partial Shading Occurrence in a PV System.” IEEE Transactions on Industrial Informatics 13: 2151–2161.
  • Altekin, F. T. 2017. “A Comparison of Piecewise Linear Programming Formulations for Stochastic Disassembly Line Balancing.” International Journal of Production Research 55: 7412–7434.
  • Altekin, F. T., and C. Akkan. 2012. “Task-failure-driven Rebalancing of Disassembly Lines.” International Journal of Production Research 50: 4955–4976.
  • Aydemir-Karadag, A., and O. Turkbey. 2013. “Multi-objective Optimization of Stochastic Disassembly Line Balancing with Station Paralleling.” Computers & Industrial Engineering 65: 413–425.
  • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2012. “A Stochastic Formulation of the Disassembly Line Balancing Problem.” IFIP International Conference on Advances in Production Management systems. Springer, 397–404
  • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2013a. “Chance Constrained Programming Model for Stochastic Profit–Oriented Disassembly Line Balancing in the Presence of Hazardous Parts.” IFIP International Conference on Advances in Production Management systems. Springer, 103–110.
  • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2013b. “L-shaped Algorithm for Stochastic Disassembly Line Balancing Problem.” IFAC Proceedings Volumes 46: 407–411.
  • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2014a. “Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem.” Procedia Cirp 17: 56–60.
  • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2014b. “A Sample Average Approximation Method for Disassembly Line Balancing Problem Under Uncertainty.” Computers & Operations Research 51: 111–122.
  • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2015a. “An Exact Solution Approach for Disassembly Line Balancing Problem Under Uncertainty of the Task Processing Times.” International Journal of Production Research 53: 1807–1818.
  • Bentaha, M. L., O. Battaïa, A. Dolgui, and S. J. Hu. 2014c. “Dealing with Uncertainty in Disassembly Line Design.” CIRP Annals 63: 21–24.
  • Bentaha, M. L., O. Battaïa, A. Dolgui, and S. J. Hu. 2015b. “Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints.” European Journal of Operational Research 247: 957–967.
  • Cui, L., G. Li, X. Wang, Q. Lin, J. Chen, N. Lu, and J. Lu. 2017. “A Ranking-Based Adaptive Artificial bee Colony Algorithm for Global Numerical Optimization.” Information Sciences 417: 169–185.
  • Goksoy Kalaycilar, E., S. Batun, and M. Azizoğlu. 2021. “A Stochastic Programming Approach for the Disassembly Line Balancing with Hazardous Task Failures.” International Journal of Production Research 59: 1–26.
  • Gungor, A., and S. M. Gupta. 2001. “A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures.” International Journal of Production Research 39: 1427–1467.
  • Guo, H., X. Lian, Y. Zhang, Y. Ren, Z. He, R. Zhang, and N. Ding. 2020a. “Analysis of Environmental Policy’s Impact on Remanufacturing Decision Under the Effect of Green Network Using Differential Game Model.” IEEE Access 8: 115251–115262.
  • Guo, H., R. Zhang, Y. Zhu, T. Qu, M. Zou, X. Chen, Y. Ren, and Z. He. 2020b. “Sustainable Quality Control Mechanism of Heavy Truck Production Process for Plant-Wide Production Process.” International Journal of Production Research 58: 1–17.
  • Güngör, A., and S. M. Gupta. 2002. “Disassembly Line in Product Recovery.” International Journal of Production Research 40: 2569–2589.
  • Kalayci, C. B., and S. M. Gupta. 2013. “Artificial bee Colony Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem.” Expert Systems with Applications 40: 7231–7241.
  • Kalayci, C. B., A. Hancilar, A. Gungor, and S. M. Gupta. 2015a. “Multi-objective Fuzzy Disassembly Line Balancing Using a Hybrid Discrete Artificial bee Colony Algorithm.” Journal of Manufacturing Systems 37: 672–682.
  • Kalayci, C. B., O. Polat, and S. M. Gupta. 2015b. “A Variable Neighbourhood Search Algorithm for Disassembly Lines.” Journal of Manufacturing Technology Management 26: 182–194.
  • Karaboga, D., and B. Basturk. 2008. “On the Performance of Artificial bee Colony (ABC) Algorithm.” Applied Soft Computing 8: 687–697.
  • Kongar, E., and S. M. Gupta. 2006. “Disassembly Sequencing Using Genetic Algorithm.” The International Journal of Advanced Manufacturing Technology 30: 497–506.
  • Kumar, D., and K. Mishra. 2018. “Multi-Objective Optimization Using Co-Variance Guided Artificial Bee Colony.” Journal of Information Science & Engineering 34: 353–369.
  • Liu, B.-Y., and S. Huang. 2013. “Research on Disassembly Line Balancing Problem in the Presence of Uncertain Cycle Time.” International Asia Conference on Industrial Engineering and Management Innovation (IEMI2012) proceedings. Springer, 497–507.
  • Liu, J., and S. Wang. 2017. “Balancing Disassembly Line in Product Recovery to Promote the Coordinated Development of Economy and Environment.” Sustainability 9: 309.
  • Lu, Q., Y. Ren, H. Jin, L. Meng, L. Li, C. Zhang, and J. W. Sutherland. 2020. “A Hybrid Metaheuristic Algorithm for a Profit-Oriented and Energy-Efficient Disassembly Sequencing Problem.” Robotics and Computer-Integrated Manufacturing 61: 101828.
  • Lu, Q., G.-H. Zhou, Z.-D. Xiao, F.-T. Chang, and C.-L. Tian. 2018. “A Selection Methodology of key Parts Based on the Characteristic of Carbon Emissions for low-Carbon Design.” The International Journal of Advanced Manufacturing Technology 94: 3359–3373.
  • Luan, X., S. Zhang, and G. Li. 2018. “Modified Power Prediction Model Based on Infinitesimal Cutting Force During Face Milling Process.” International Journal of Precision Engineering and Manufacturing-Green Technology 5: 71–80.
  • Mcgovern, S., and S. Gupta. 2007. “Combinatorial Optimization Analysis of the Unary NP-Complete Disassembly Line Balancing Problem.” International Journal of Production Research 45: 4485–4511.
  • Mcgovern, S. M., and S. M. Gupta. 2006. “Ant Colony Optimization for Disassembly Sequencing with Multiple Objectives.” The International Journal of Advanced Manufacturing Technology 30: 481–496.
  • Özceylan, E., C. B. Kalayci, A. Güngör, and S. M. Gupta. 2019. “Disassembly Line Balancing Problem: A Review of the State of the art and Future Directions.” International Journal of Production Research 57: 4805–4827.
  • Özceylan, E., and T. Paksoy. 2013. “Reverse Supply Chain Optimisation with Disassembly Line Balancing.” International Journal of Production Research 51: 5985–6001.
  • Özceylan, E., and T. Paksoy. 2014a. “Fuzzy Mathematical Programming Approaches for Reverse Supply Chain Optimization with Disassembly Line Balancing Problem.” Journal of Intelligent & Fuzzy Systems 26: 1969–1985.
  • Özceylan, E., and T. Paksoy. 2014b. “Interactive Fuzzy Programming Approaches to the Strategic and Tactical Planning of a Closed-Loop Supply Chain Under Uncertainty.” International Journal of Production Research 52: 2363–2387.
  • Paksoy, T., A. Güngör, E. Özceylan, and A. Hancilar. 2013. “Mixed Model Disassembly Line Balancing Problem with Fuzzy Goals.” International Journal of Production Research 51: 6082–6096.
  • Ren, Y., D. Yu, C. Zhang, G. Tian, L. Meng, and X. Zhou. 2017. “An Improved Gravitational Search Algorithm for Profit-Oriented Partial Disassembly Line Balancing Problem.” International Journal of Production Research 55: 7302–7316.
  • Ren, Y., C. Zhang, F. Zhao, G. Tian, W. Lin, L. Meng, and H. Li. 2018a. “Disassembly Line Balancing Problem Using Interdependent Weights-Based Multi-Criteria Decision Making and 2-Optimal Algorithm.” Journal of Cleaner Production 174: 1475–1486.
  • Ren, Y., C. Zhang, F. Zhao, M. J. Triebe, and L. Meng. 2018b. “An MCDM-Based Multiobjective General Variable Neighborhood Search Approach for Disassembly Line Balancing Problem.” IEEE Transactions on Systems, Man, and Cybernetics: Systems 50: 3770–3783.
  • Ren, Y., C. Zhang, F. Zhao, H. Xiao, and G. Tian. 2018c. “An Asynchronous Parallel Disassembly Planning Based on Genetic Algorithm.” European Journal of Operational Research 269: 647–660.
  • Singh, R. K., A. R. Singh, and R. K. Yadav. 2021. “Disassembly Line Balancing Using Recursive Optimization in Presence of Task-Failure.” IFIP International Conference on Advances in Production Management systems. Springer, 430–440.
  • Tang, Y., M. Zhou, and R. J. Caudill. 2001. “An Integrated Approach to Disassembly Planning and Demanufacturing Operation.” IEEE Transactions on Robotics and Automation 17: 773–784.
  • Tuncel, E., A. Zeid, and S. Kamarthi. 2014. “Solving Large Scale Disassembly Line Balancing Problem with Uncertainty Using Reinforcement Learning.” Journal of Intelligent Manufacturing 25: 647–659.
  • Wang, K., X. Li, and L. Gao. 2019. “Modeling and Optimization of Multi-Objective Partial Disassembly Line Balancing Problem Considering Hazard and Profit.” Journal of Cleaner Production 211: 115–133.
  • Xu, C., H. Wei, X. Guo, S. Liu, L. Qi, and Z. Zhao. 2020. “Human-Robot Collaboration Multi-Objective Disassembly Line Balancing Subject to Task Failure via Multi-Objective Artificial Bee Colony Algorithm.” IFAC-PapersOnLine 53: 1–6.
  • Yolmeh, A., and U. Saif. 2021. “Closed-loop Supply Chain Network Design Integrated with Assembly and Disassembly Line Balancing Under Uncertainty: An Enhanced Decomposition Approach.” International Journal of Production Research 59: 2690–2707.
  • Zhang, X. F., G. Yu, Z. Y. Hu, C. H. Pei, and G. Q. Ma. 2014. “Parallel Disassembly Sequence Planning for Complex Products Based on Fuzzy-Rough Sets.” The International Journal of Advanced Manufacturing Technology 72: 231–239.
  • Zhang, Z., K. Wang, L. Zhu, and Y. Wang. 2017. “A Pareto Improved Artificial Fish Swarm Algorithm for Solving a Multi-Objective Fuzzy Disassembly Line Balancing Problem.” Expert Systems with Applications 86: 165–176.
  • Zhao, L., Q. Tang, and Z. Zhang. 2022. “An Improved Preference-Based Variable Neighborhood Search Algorithm with ar-Dominance for Assembly Line Balancing Considering Preventive Maintenance Scenarios.” Engineering Applications of Artificial Intelligence 109: 104593.
  • Zhou, J., X. Yao, Y. Lin, F. T. Chan, and Y. Li. 2018. “An Adaptive Multi-Population Differential Artificial bee Colony Algorithm for Many-Objective Service Composition in Cloud Manufacturing.” Information Sciences 456: 50–82.
  • Zhu, L., Z. Zhang, Y. Wang, and N. Cai. 2019. “On the end-of-Life State Oriented Multi-Objective Disassembly Line Balancing Problem.” Journal of Intelligent Manufacturing 31: 1–26.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.