614
Views
3
CrossRef citations to date
0
Altmetric
Research Articles

Energy consumption control in the two-machine Bernoulli serial production line with setup and idleness

ORCID Icon, , & ORCID Icon
Pages 2917-2936 | Received 05 Aug 2021, Accepted 25 Apr 2022, Published online: 12 May 2022

References

  • Arinez, J., S. Biller, S. M. Meerkov, and L Zhang. 2010. “Quality/Quantity Improvement in An Automotive Paint Shop: A Case Study.” IEEE Transactions on Automation Science and Engineering 7 (4): 755–761.
  • Bai, Y., J. Tu, M. Yang, L. Zhang, and P Denno. 2021. “A New Aggregation Algorithm for Performance Metric Calculation in Serial Production Lines with Exponential Machines: Design, Accuracy and Robustness.” International Journal of Production Research 59: 4072–4089.
  • Biel, K., and C. H Glock. 2016. “On the Use of Waste Heat in a Two-Stage Production System with Controllable Production Rates.” International Journal of Production Economics 181: 174–190.
  • Che, B. J., J. Carrell, P. Sarkar, and S. C Feng. 2013. “Categorization of Indicators for Sustainable Manufacturing.” Ecological Indicators 24: 148–157.
  • Chen, G., L. Zhang, J. Arinez, and S Biller. 2013. “Energy-Efficient Production Systems Through Schedule-Based Operations.” IEEE Transactions on Automation Science and Engineering 10 (1): 27–37.
  • Cheng, X., C.-B. Yan, and F Gao. 2021. “Energy Cost Optimisation in Two-Machine Bernoulli Serial Lines Under Time-of-Use Pricing.” International Journal of Production Research 1–17. https://doi.org/10.1080/00207543.2021.1936265
  • Dallery, Y., and S. B Gershwin. 1992. “Manufacturing Flow Line Systems: A Review of Models and Analytical Results.” Queueing Systems 12: 3–94.
  • Delgado-Gomes, V., J. A. Oliveira-Lima, and J. F Martins. 2017. “Energy Consumption Awareness in Manufacturing and Production Systems.” International Journal of Computer Integrated Manufacturing 30: 84–95.
  • Frigerio, N., and A Matta. 2015. “Energy-Efficient Control Strategies for Machine Tools with Stochastic Arrivals.” IEEE Transactions on Automation Science and Engineering 12: 50–61.
  • Frigerio, N., and A Matta. 2016. “Analysis on Energy Efficient Switching of Machine Tool with Stochastic Arrivals and Buffer Information.” IEEE Transactions on Automation Science and Engineering 13: 238–246.
  • Galitsky, C., C. Galitsky, and E. Worrell. 2008. Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry: An Energy Star Guide for Energy and Plant Managers. Berkeley, CA: Lawrence Berkeley National Laboratory.
  • Gao, Y., Q. Wang, Y. Feng, H. Zheng, B. Zheng, and J Tan. 2018. “An Energy-Saving Optimization Method of Dynamic Scheduling for Disassembly Line.” Energies 11: 1261.
  • Guerrero, C. A., J. Wang, J. Li, J. Arinez, S. Biller, N. Huang, and G Xiao. 2011. “Production System Design to Achieve Energy Savings in An Automotive Paint Shop.” International Journal of Production Research 49: 6769–6785.
  • Hadžić, N., V. Ložar, T. Opetuk, and J Andrić. 2021. “The Bernoulli Splitting Line: Analytical and Semi-analytical Evaluation of the Steady-state Performance.” International Journal of Production Research 1–25. https://doi.org/10.1080/00207543.2021.1974115
  • Jia, Z., L. Zhang, J. Arinez, and G Xiao. 2016. “Performance Analysis for Serial Production Lines with Bernoulli Machines and Real-time WIP-Based Machine Switch-On/Off Control.” International Journal of Production Research 54: 6285–6301.
  • Kim, W.-S., and J. R Morrison. 2015. “The Throughput Rate of Serial Production Lines with Deterministic Process Times and Random Setups: Markovian Models and Applications to Semiconductor Manufacturing.” Computers & Operations Research 53: 288–300.
  • Kolta, T.. 1992. “Selecting Equipment to Control Air Pollution from Automotive Painting Operations.” Technical Report SAE Technical Paper.
  • Lasserre, J. B. 2001. “Global Optimization with Polynomials and the Problem of Moments.” SIAM Journal on Optimization 11: 796–817.
  • Lasserre, J. B. 2009. “Moments and Sums of Squares for Polynomial Optimization and Related Problems.” Journal of Global Optimization 45: 39–61.
  • Laurent, M.. 2009. “Sums of Squares, Moment Matrices and Optimization Over Polynomials.” In Emerging Applications of Algebraic Geometry, 157–270. Springer.
  • Lee, D., and C.-C Cheng. 2016. “Energy Savings by Energy Management Systems: A Review.” Renewable and Sustainable Energy Reviews 56: 760–777.
  • Li, J., D. E. Blumenfeld, N. Huang, and J. M Alden. 2009. “Throughput Analysis of Production Systems: Recent Advances and Future Topics.” International Journal of Production Research 47: 3823–3851.
  • Li, J., and S. M. Meerkov. 2009. Production Systems Engineering. New York, NY: Springer.
  • Li, J., J. R. Morrison, M. T. Zhang, M. Nakono, S. Biller, and B Lennartson. 2013. “Editorial: Automation in Green Manufacturing.” IEEE Transactions on Automation Science and Engineering 10: 1–4.
  • Li, S., F. Liu, and X Zhou. 2018. “Multi-objective Energy-saving Scheduling for a Permutation Flow Line.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 232: 879–888.
  • Mashaei, M., and B Lennartson. 2013. “Energy Reduction in a Pallet-constrained Flow Shop Through On–Off Control of Idle Machines.” IEEE Transactions on Automation Science and Engineering 10: 45–56.
  • Masmoudi, O., A. Yalaoui, Y. Ouazene, and H Chehade. 2017. “Lot-sizing in a Multi-Stage Flow Line Production System with Energy Consideration.” International Journal of Production Research 55: 1640–1663.
  • May, G., B. Stahl, M. Taisch, and D Kiritsis. 2017. “Energy Management in Manufacturing: From Literature Review to a Conceptual Framework.” Journal of Cleaner Production 167: 1464–1489.
  • Nesterov, Y.. 2000. “Squared Functional Systems and Optimization Problems.” In High Performance Optimization, 405–440. Springer.
  • Pang, C. K., and C. V Le. 2014. “Optimization of Total Energy Consumption in Flexible Manufacturing Systems Using Weighted P-Timed Petri Nets and Dynamic Programming.” IEEE Transactions on Automation Science and Engineering 11: 1083–1096.
  • Park, K., and J Li. 2019. “Improving Productivity of a Multi-Product Machining Line At a Motorcycle Manufacturing Plant.” International Journal of Production Research 57: 470–487.
  • Parrilo, P. A.. 2000. “Structured Semidefinite Programs and Semialgebraic Geometry Methods in Robustness and Optimization.” PhD thesis, California Institute of Technology.
  • Parrilo, P. A., and B Sturmfels. 2003. “Minimizing Polynomial Functions.” Algorithmic and Quantitative Real Algebraic Geometry, DIMACS Series in Discrete Mathematics and Theoretical Computer Science 60: 83–99.
  • Pizzo, A., A. Zappone, and L Sanguinetti. 2018. “Solving Fractional Polynomial Problems by Polynomial Optimization Theory.” IEEE Signal Processing Letters 25: 1540–1544.
  • Renna, P. 2018. “Energy Saving by Switch-off Policy in a Pull-Controlled Production Line.” Sustainable Production and Consumption 16: 25–32.
  • Shen, X., and N Li. 2021. “Scheduling Policies Analysis for Matching Operations in Bernoulli Selective Assembly Lines.” International Journal of Production Research 1–24. https://doi.org/10.1080/00207543.2021.1939903
  • Shrouf, F., J. Ordieres-Meré, A. García-Sánchez, and M Ortega-Mier. 2014. “Optimizing the Production Scheduling of a Single Machine to Minimize Total Energy Consumption Costs.” Journal of Cleaner Production 67: 197–207.
  • Su, W., X. Xie, J. Li, and L Zheng. 2016. “Improving Energy Efficiency in Bernoulli Serial Lines: An Integrated Model.” International Journal of Production Research 54: 3414–3428.
  • Su, W., X. Xie, J. Li, L. Zheng, and S. C. Feng. 2017. “Reducing Energy Consumption in Serial Production Lines with Bernoulli Reliability Machines.” International Journal of Production Research 55: 7356–7379.
  • Tu, J., and L Zhang. 2022. “Performance Analysis and Optimisation of Bernoulli Serial Production Lines with Dynamic Real-time Bottleneck Identification and Mitigation.” International Journal of Production Research 1–17. https://doi.org/10.1080/00207543.2021.2019343
  • Viswanadham, N., and Y. Narahari. 1992. Performance Modeling of Automated Manufacturing Systems. Englewood Cliffs: Prentice Hall.
  • Wang, C., and J Li. 2010. “Approximate Analysis of Reentrant Lines with Bernoulli Reliability Model.” IEEE Transactions on Automation Science and Engineering 7: 708–715.
  • Wang, J., Y. Feng, Z. Fei, S. Li, and Q. Chang. 2017. “Markov Chain Based Idle Status Control of Stochastic Machines for Energy Saving Operation.” In 2017 13th IEEE Conference on Automation Science and Engineering (CASE), 1019–1023.
  • Yan, C.-B. 2021. “Analysis and Optimization of Energy Consumption in Two-Machine Bernoulli Lines with General Bounds on Machine Efficiency.” IEEE Transactions on Automation Science and Engineering 18: 151–163.
  • Yan, C.-B., X. Cheng, F. Gao, and X Guan. 2022. “Formulation and Solution Methodology for Reducing Energy Consumption in Two-Machine Bernoulli Serial Lines.” IEEE Transactions on Automation Science and Engineering 19 (1): 522–530. https://doi.org/10.1109/TASE.2020.3041440
  • Yan, C.-B., and Z Zheng. 2021a. “An Effective and Efficient Divide-and-Conquer Algorithm for Energy Consumption Optimisation Problem in Long Bernoulli Serial Lines.” International Journal of Production Research 59: 7018–7036.
  • Yan, C.-B., and Z Zheng. 2021b. “Problem Formulation and Solution Methodology for Energy Consumption Optimization in Bernoulli Serial Lines.” IEEE Transactions on Automation Science and Engineering 18: 776–790.
  • Zanoni, S., L. Bettoni, and C. H Glock. 2014. “Energy Implications in a Two-Stage Production System with Controllable Production Rates.” International Journal of Production Economics 149: 164–171.
  • Zhe, T., and W. Jiang. 2015. “Energy Consumption Management for Multistage Production Systems Considering Real Time Pricing.” In 2015 34th Chinese Control Conference (CCC), 2627–2632.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.