372
Views
2
CrossRef citations to date
0
Altmetric
Research Articles

Application of a novel approach of production system modelling, analysis and improvement for small and medium-sized manufacturers: a case study

&
Pages 3279-3299 | Received 01 Dec 2021, Accepted 11 May 2022, Published online: 01 Jun 2022

References

  • Alavian, P., P. Denno, and S. M. Meerkov. 2017. “Multi-Job Production Systems: Definition, Problems, and Product-Mix Performance Portrait of Serial Lines.” International Journal of Production Research 55 (24): 7276–7301.
  • Ambani, S., S. M. Meerkov, and L. Zhang. 2010. “Feasibility and Optimization of Preventive Maintenance in Exponential Machines and Serial Lines.” IIE Transactions 42 (10): 766–777.
  • Anish, R., and K. Shankar. 2020. “Identification of Nonlinear Structural Parameters Using Combined Power Flow and Acceleration Matching Approaches.” In Advances in Mechanical Engineering, 1139–1149. Singapore: Springer.
  • Arinez, J., S. Biller, S. M. Meerkov, and L. Zhang. 2009. “Quality/Quantity Improvement in an Automotive Paint Shop: A Case Study.” IEEE Transactions on Automation Science and Engineering 7 (4): 755–761.
  • Bai, Y., J. Tu, M. Yang, L. Zhang, and P. Denno. 2021. “A New Aggregation Algorithm for Performance Metric Calculation in Serial Production Lines with Exponential Machines: Design, Accuracy and Robustness.” International Journal of Production Research 59 (13): 4072–4089.
  • Bertsekas, D. P. 2016. Nonlinear Programming. Belmont, MA: Athena Scientific.
  • Biller, S., J. Li, S. P. Marin, S. M. Meerkov, and L. Zhang. 2009. “Bottlenecks in Bernoulli Serial Lines with Rework.” IEEE Transactions on Automation Science and Engineering 7 (2): 208–217.
  • Biller, S., S. P. Marin, S. M. Meerkov, and L. Zhang. 2008. “Closed Bernoulli Production Lines: Analysis, Continuous Improvement, and Leanness.” IEEE Transactions on Automation Science and Engineering 6 (1): 168–180.
  • Biller, S., S. M. Meerkov, and C.-B. Yan. 2013. “Raw Material Release Rates to Ensure Desired Production Lead Time in Bernoulli Serial Lines.” International Journal of Production Research 51 (14): 4349–4364.
  • Chen, G., L. Zhang, J. Arinez, and S. Biller. 2012. “Energy-Efficient Production Systems Through Schedule-Based Operations.” IEEE Transactions on Automation Science and Engineering 10 (1): 27–37.
  • Chiang, S.-Y., A. Hu, and S. M. Meerkov. 2008. “Lean Buffering in Serial Production Lines with Nonidentical Exponential Machines.” IEEE Transactions on Automation Science and Engineering 5 (2): 298–306.
  • Cox, M. G. 1990. “Mathematical Modelling in Manufacturing Metrology.” In Proceedings of the Twenty-Eighth International, 533–539. New York, NY: Springer.
  • Du, S., R. Xu, and L. Li. 2016. “Modeling and Analysis of Multiproduct Multistage Manufacturing System for Quality Improvement.” IEEE Transactions on Systems, Man, and Cybernetics: Systems 48 (5): 801–820.
  • Feng, Y., X. Zhong, J. Li, and W. Fan. 2018. “Analysis of Closed-Loop Production Lines with Bernoulli Reliability Machines: Theory and Application.” IISE Transactions 50 (3): 143–160.
  • Gershwin, S. B. 1994. Manufacturing Systems Engineering. Englewood Cliff, NJ: Prentice Hall.
  • Jia, Z., and L. Zhang. 2019. “Serial Production Lines with Geometric Machines and Finite Production Runs: Performance Analysis and System-theoretic Properties.” International Journal of Production Research 57 (8): 2247–2262.
  • Jia, Z., L. Zhang, J. Arinez, and G. Xiao. 2015. “Finite Production Run-Based Serial Lines with Bernoulli Machines: Performance Analysis, Bottleneck, and Case Study.” IEEE Transactions on Automation Science and Engineering 13 (1): 134–148.
  • Jia, Z., L. Zhang, J. Arinez, and G. Xiao. 2016. “Performance Analysis for Serial Production Lines with Bernoulli Machines and Real-time Wip-Based Machine Switch-on/off Control.” International Journal of Production Research 54 (21): 6285–6301.
  • Ju, F., J. Li, and W. Deng. 2016. “Selective Assembly System with Unreliable Bernoulli Machines and Finite Buffers.” IEEE Transactions on Automation Science and Engineering 14 (1): 171–184.
  • Kim, D., S. Sra, and I. S. Dhillon. 2010. “Tackling Box-Constrained Optimization Via a New Projected Quasi-Newton Approach.” SIAM Journal on Scientific Computing 32 (6): 3548–3563.
  • Li, J. 2013. “Continuous Improvement at Toyota Manufacturing Plant: Applications of Production Systems Engineering Methods.” International Journal of Production Research 51 (23–24): 7235–7249.
  • Li, J., and S. M. Meerkov. 2009. Production Systems Engineering. New York, NY: Springer Science Business Media.
  • Liberopoulos, G., and P. Tsarouhas. 2005. “Reliability Analysis of an Automated Pizza Production Line.” Journal of Food Engineering 69 (1): 79–96.
  • Lima, A. N., C. B. Jacobina, and E. B. de Souza Filho. 1997. “Nonlinear Parameter Estimation of Steady-State Induction Machine Models.” IEEE Transactions on Industrial Electronics 44 (3): 390–397.
  • Liu, Y., J. Li, and S.-Y. Chiang. 2010. “Performance Approximation of Re-Entrant Lines with Unreliable Exponential Machines and Finite Buffers.” The International Journal of Advanced Manufacturing Technology 49 (9–12): 1151–1159.
  • Liu, X., W. Wang, and R. Peng. 2015. “An Integrated Production, Inventory and Preventive Maintenance Model for a Multi-product Production System.” Reliability Engineering & System Safety 137: 76–86.
  • Liu, Y., Q. Zhang, Z. Ouyang, and H.-Z. Huang. 2021. “Integrated Production Planning and Preventive Maintenance Scheduling for Synchronized Parallel Machines.” Reliability Engineering & System Safety 215: 107869.
  • Meerkov, S. M., and C.-B. Yan. 2014. “Production Lead Time in Serial Lines: Evaluation, Analysis, and Control.” IEEE Transactions on Automation Science and Engineering 13 (2): 663–675.
  • Nocedal, J., and S. Wright. 2006. Numerical Optimization. New York, NY: Springer Science & Business Media.
  • Nwika, C. A., G. Umoh, and F. B. Amaewhule. 2017. “A Method of Reliability Estimation of Individual Section Machine (IS) of Glass Manufacturing Facility; a Systematic Approach with Exponential Model, Availability and Mean Time Between Failures.” International Journal of Emerging Technologies in Engineering Research 5: 126–131.
  • Papadopoulos, H. T., C. Heavy, and J. Browne. 1993. Queueing Theory in Manufacturing Systems Analysis and Design. London, UK: Chapman & Hill.
  • Park, K., and J. Li. 2019. “Improving Productivity of a Multi-Product Machining Line at a Motorcycle Manufacturing Plant.” International Journal of Production Research 57 (2): 470–487.
  • Peri, D., and F. Tinti. 2012. “A Multistart Gradient-Based Algorithm with Surrogate Model for Global Optimization.” Communications in Applied and Industrial Mathematics 3 (1): 1–22.
  • Reddy, T. A., and K. K. Andersen. 2002. “An Evaluation of Classical Steady-State Off-Line Linear Parameter Estimation Methods Applied to Chiller Performance Data.” Hvac&R Research 8 (1): 101–124.
  • Schmidt, M., D. Kim, and S. Sra. 2012. “Projected Newton-Type Methods in Machine Learning.” In Optimization for Machine Learning. Vol. 1. Cambridge, MA: The MIT Press.
  • Sun, Y., and L. Zhang. 2020. “Parameter Identification for Multiple-Machine Bernoulli Lines Using Statistical Learning Methods.” In 2020 IEEE 16th International Conference on Automation Science and Engineering (CASE). IEEE.
  • Sun, Y., and L. Zhang. 2021. “Parameter Identification for Synchronous Two-Machine Exponential Production Line Model.” In 2021 IEEE 17th International Conference on Automation Science and Engineering (CASE), 1884–1889. IEEE.
  • Sun, Y., T. Zhu, L. Zhang, and P. Denno. 2020. “Parameter Identification for Bernoulli Serial Production Line Model.” IEEE Transactions on Automation Science and Engineering 18 (4): 2115–2127.
  • Tu, J., Y. Bai, M. Yang, L. Zhang, and P. Denno. 2020. “Real-time Bottleneck in Serial Production Lines with Bernoulli Machines: Theory and Case Study.” IEEE Transactions on Automation Science and Engineering 18 (4): 1822–1834.
  • Tu, J., and L. Zhang. 2022. “Performance Analysis and Optimisation of Bernoulli Serial Production Lines with Dynamic Real-time Bottleneck Identification and Mitigation.” International Journal of Production Research 1–17. doi:10.1080/00207543.2021.2019343.
  • Tu, J., T. Zhu, Y. Bai, and L. Zhang. 2020. “Estimation of Machine Parameters in Exponential Serial Lines using Feedforward Neural Networks.” In 2020 IEEE 16th International Conference on Automation Science and Engineering (CASE). IEEE.
  • Wang, F., and F. Ju. 2021. “Decomposition-Based Real-Time Control of Multi-Stage Transfer Lines with Residence Time Constraints.” IISE Transactions 53 (9): 943–959.
  • Weston, B. 2019. “How Small Manufacturing Businesses Drive the U.S. Economy.” https://www.score.org/blog/how-small-manufacturing-businesses-drive-us-economy.
  • Xie, X., and J. Li. 2012. “Modeling, Analysis and Continuous Improvement of Food Production Systems: A Case Study at a Meat Shaving and Packaging Line.” Journal of Food Engineering 113 (2): 344–350.
  • Yan, C.-B., and Q. Zhao. 2013. “A Unified Effective Method for Aggregating Multi-Machine Stages in Production Systems.” IEEE Transactions on Automatic Control 58 (7): 1674–1687.
  • Yao, D. D. 1994. Stochastic Modeling and Analysis of Manufacturing Systems. New York, NY: Springer-Verlag.
  • Zandieh, M., M. Joreir-Ahmadi, and A. Fadaei-Rafsanjani. 2017. “Buffer Allocation Problem and Preventive Maintenance Planning in Non-Homogenous Unreliable Production Lines.” The International Journal of Advanced Manufacturing Technology 91 (5-8): 2581–2593.
  • Zhang, L., and X. Yue. 2011. “Operations Sequencing in Flexible Production Lines with Bernoulli Machines.” IEEE Transactions on Automation Science and Engineering 8 (3): 645–653.
  • Zhao, C., and J. Li. 2013. “Analysis of Multiproduct Manufacturing Systems with Homogeneous Exponential Machines.” IEEE Transactions on Automation Science and Engineering 11 (3): 828–838.
  • Zhao, C., and J. Li. 2015. “Analysis and Improvement of Multiproduct Bernoulli Serial Lines: Theory and Application.” IEEE Transactions on Systems, Man, and Cybernetics: Systems 45 (9): 1218–1230.
  • Zhao, C., J. Li, and N. Huang. 2014. “Performance Evaluation of Multi-Product Manufacturing Systems with Asynchronous Exponential Machines.” In 2014 IEEE International Conference on Automation Science and Engineering (CASE), 692–697. IEEE.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.