431
Views
5
CrossRef citations to date
0
Altmetric
Research Articles

Impact of the continuous and periodic assessment of a buffer replenishment on the DDMRP method

ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Pages 5637-5658 | Received 09 Dec 2021, Accepted 28 Jul 2022, Published online: 12 Aug 2022

References

  • Aissaoui, N., M. Haouari, and E. Hassini. 2007. “Supplier Selection and Order lot Sizing Modeling: A Review.” Computers & Operations Research 34: 3516–3540. doi:10.1016/j.cor.2006.01.016.
  • Arrow, K. A., S. Karlin, and H. E. Scarf. 1958. Studies in the Mathematical Theory of Inventory and Production. Stanford, California: “Inventory Control.” International Series in Operations Research & Management Science, doi:10.1007/978-1-4757-5606-7.
  • Axsäter, S. 2000. “International Series in Operations Research & Management Science.” International Series in Operations Research & Management Science, doi:10.1007/978-1-4757-5606-7.
  • Azzamouri, A., P. Baptiste, G. Dessevre, and R. Pellerin. 2021. “Demand Driven Material Requirements Planning (DDMRP): A Systematic Review and Classification.” Journal of Industrial Engineering and Management 14 (3): 439–456. doi:10.3926/jiem.3331.
  • Brahimi, N., N. Absi, S. Dauzère-Pérès, and A. Nordli. 2017. “Single-item Dynamic Lot-Sizing Problems: An Updated Survey.” European Journal of Operational Research 263 (3): 838–863. doi:10.1016/j.ejor.2017.05.008.
  • Buschkühl, L., F. Sahling, S. Helber, and H. Tempelmeier. 2010. “Dynamic Capacitated lot-Sizing Problems: A Classification and Review of Solution Approaches.” Or Spectrum 32: 231–261. doi:10.1007/s00291-008-0150-7.
  • Bushuev, M. A., A. Guiffrida, M. Y. Jaber, and M. Khan. 2015. “A Review of Inventory lot Sizing Review Papers.” Management Research Review 38 (3): 283–298. doi:10.1108/MRR-09-2013-0204.
  • Chand, S. 1982. “Lot Sizing for Products with Finite Demand Horizon and Periodic Review Inventory Policy.” European Journal of Operational Research 11 (2): 145–148. doi:10.1016/0377-2217(82)90108-4.
  • Chauvet, F., J. W. Herrmann, and J. M. Proth. 2003. “Optimization of Cyclic Production Systems: A Heuristic Approach.” IEEE Transactions on Robotics and Automation 19 (1): 150–154. doi:10.1109/TRA.2002.807529
  • Corsini, R. R., A. Costa, S. Cannella, and J. M. Framinan. 2022. “Analysing the Impact of Production Control Policies on the Dynamics of a two-Product Supply Chain with Capacity Constraints.” International Journal of Production Research, doi:10.1080/00207543.2022.2053224.
  • Damand, D., Y. Lahrichi, and M. Barth. 2022. “Parameterisation of Demand-Driven Material Requirements Planning: A Multi-Objective Genetic Algorithm.” International Journal of Production Research, doi:10.1080/00207543.2022.2098074.
  • Dessevre, G. P., J. Baptiste, R. Lamothe, and R. Pellerin. 2021. “Visual Charts Produced by Simulation to Correlate Service Rate, Resource Utilization and DDMRP Parameters.” International Journal of Production Research, doi:10.1080/00207543.2021.2015808.
  • Dessevre, G., G. Martin, B. Pierre, J. Lamothe, and M. Lauras. 2019a. “Étude d’impact du paramétrage des temps de défilement sur la performance d’un déploiement de la méthode DDMRP.” 13ème Conférence international de CIGI QUALITA, Montreal Quebec, Canada. https://hal-mines-albi.archives-ouvertes.fr/hal-02200540.
  • Dessevre, G., G. Martin, B. Pierre, J. Lamothe, R. Pellerin, and M. Lauras. 2019b. “Decoupled Lead Time in Finite Capacity Flowshop: A Feedback Loop Approach.” The 8th International Conference on Industrial Engineering and Systems Management, Shangai, China, doi:10.1109/IESM45758.2019.8948198.
  • Drexl, A., and A. Kimms. 1997. “Lot Sizing and Scheduling — Survey and Extensions.” European Journal of Operational Research 99 (2): 221–235. http://hdl.handle.net/10419/175395. doi:10.1016/S0377-2217(97)00030-1
  • Giard, V. 2003. Gestion de la Production et des Flux. Paris: Economica.
  • Gicquel, C., M. Minoux, and Y. Dallery. 2008. “Capacitated Lot Sizing Models: A Literature Review.” hal-00255830.
  • Hacid, S. 2000. “Contribution à la mise en oeuvre et à la synchronisation de systèmes de production cyclique sur une chaîne logistique.” (Thesis, Ecole des mines de Saint Etienne.
  • Hadley, G., and T. Whitin. 1963. Analysis of Inventory Systems. Englewood Cliffs, N.J: Prentice-Hall.
  • Hillon, H. P., and J. M. Proth. 1989. “Performance Evaluation of job-Shop Systems Using Timed Event-Graphs.” IEEE Transactions on Automatic Control 34 (1): 3–9. doi:10.1109/9.8644.
  • Jans, R., and Z. Degraeve. 2007. “Meta-heuristics for Dynamic lot Sizing: A Review and Comparison of Solution Approaches.” European Journal of Operational Research 177 (3): 1855–1875. doi:10.1016/j.ejor.2005.12.008.
  • Jans, R., and Z. Degraeve. 2008. “Modeling Industrial lot Sizing Problems: A Review.” International Journal of Production Research 46 (6): 1619–1643. doi:10.1080/00207540600902262.
  • Jayakar, G. S., V. V. Sahithi, C. S. Rao, and M. S. Rao. 2017. “A Lliterature Review on lot Sizing.” International Journal of Creative Research Thoughts 5 (4): 3470–3473.
  • Karimi, B., S. M. T. Fatemi Ghomi, and J. M. Wilson. 2003. “The Capacitated Lot Sizing Problem: A Review of Models and Algorithms.” Omega 31 (5): 365–378. doi:10.1016/S0305-0483(03)00059-8.
  • Korbaa, O., and J. C. Genita. 2000. “Ordonnancement cyclique en production flexible manufacturière.” Revue Internationale d'Ingénierie des Systèmes de Production Mécanique 4: 47–56.
  • Korkulu, S., and K. Bóna. 2019. “Ergonomics as a Social Component of Sustainable Lot-Sizing: A Review.” Periodica Polytechnica Social and Management Sciences 27 (1): 1–8. doi:10.3311/PPso.12286.
  • Leorch, A. G., and J. A. Muuckstadt. 1994. “An Approach to Production Planning and Scheduling in Cyclically Scheduled Manufacturing Systems.” International Journal of Production Research 32 (4): 851–871. doi:10.1080/00207549408956975.
  • Mabed, M. 2005. “Evaluation et mise en œuvre des systèmes de production cyclique.” In Ecole Nationale Supérieure des Mines de Saint-Etienne; Université Jean Monnet - Saint-Etienne. NNT: 2005EMSE0004ff. tel-00850443.
  • Melega, G. M., S. A. de Araujo, and R. Jans. 2018. “Classification and Literature Review of Integrated lot-Sizing and Cutting Stock Problems.” European Journal of Operational Research 271: 1–19. doi:10.1016/j.ejor.2018.01.002.
  • Miclo, R., M. Lauras, F. Fontanili, J. Lamothe, and S. A. Melnyk. 2019. “Demand Driven MRP: Assessment of a new Approach to Materials Management.” International Journal of Production Research 57 (1): 166–181. doi:10.1080/00207543.2018.1464230.
  • Mitra, S., and A. K. Chatterjee. 2005. “An Efficient Lot-Sizing Heuristic for A Periodic-Review Inventory System Under Non-Stationary Stochastic Demand.” Operational Research Society of India 42 (2): 168–177.
  • Orlicky, J. 1975. Material Requirements Planning. New York: McGraw-Hill.
  • Ptak, C., and C. Smith. 2011. “Orlicky’s Material Requirements Planning.” McGraw Hill Professional.
  • Ptak, C., and C. Smith. 2016. DDMRP Demand Driven Material Requirements Planning (DDMRP). Industrial Press, Incorporated.
  • Quadt, D., and H. Kuhn. 2008. “Capacitated lot-Sizing with Extensions: A Review.” 4OR 6: 61–83. doi:10.1007/s10288-007-0057-1.
  • Robinson, P., A. Narayanan, and F. Sahin. 2009. “Coordinated Deterministic Dynamic Demand Lot-Sizing Problem: A Review of Models and Algorithms.” Omega 37: 3–15. doi:10.1016/j.omega.2006.11.004.
  • Silver, E. A., and R. Peterson. 1985. Decision Systems for Inventory Management and Production Planning. New York: John Wiley and Sons.
  • Stevenson, M., L. C. Hendry, and B. G. Kingsman. 2005. “A Review of Production Planning and Control: The Applicability of Key Concepts to the Make-to-Order Industry.” International Journal of Production Research 43 (5): 869–898. doi:10.1080/0020754042000298520.
  • Syntetos, A. A., and J. E. Boylan. 2001. “On the Bias of Intermittent Demand Estimates.” International Journal of Production Economics 71 (1-3): 457–466. doi:10.1016/S0925-5273(00)00143-2.
  • Syntetos, A. A., J. E. Boylan, and J. D. Croston. 2005. “On the Categorization of Demand Patterns.” Journal of the Operational Research Society 56 (5): 495–503. doi:10.1057/palgrave.jors.2601841.
  • Thürer, M., N. O. Fernandes, and M. Stevenson. 2022. “Production Planning and Control in Multi-Stage Assembly Systems: An Assessment of Kanban, MRP, OPT (DBR) and DDMRP by Simulation.” International Journal of Production Research 60 (3): 1036–1050. doi:10.1080/00207543.2020.1849847.
  • Ullah, H., and S. Parveen. 2010. “A Literature Review on Inventory lot Sizing Problems.” Global Journal of Research in Engineering 10 (5): 21–36.
  • Velasco-Acosta, A. P., C. Mascle, and P. Baptiste. 2020. “Applicability of Demand-Driven MRP in a Complex Manufacturing Environment.” International Journal of Production Research 58 (14): 4233–4245. doi:10.1080/00207543.2019.1650978.
  • Wang, D., O. Tang, and L. Zhang. 2014. “A Periodic Review lot Sizing Problem with Random Yields, Disruptions and Inventory Capacity.” International Journal of Production Economics 155: 330–339. doi:10.1016/j.ijpe.2014.02.007.
  • Wilson, R. H. 1934. “Scientific Routine for Stock Control.” Harvard Business Review 13: 116–128.
  • Zipkin, P. H. 2000. Foundations of Inventory Management. Boston: McGraw-Hill.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.