822
Views
9
CrossRef citations to date
0
Altmetric
Research Articles

Green smart manufacturing: energy-efficient robotic job shop scheduling models

, , &
Pages 5791-5805 | Received 29 Nov 2021, Accepted 02 Aug 2022, Published online: 01 Sep 2022

References

  • Abedi, M., R. Chiong, N. Noman, and R. Zhang. 2020. “A Multi-Population, Multi-Objective Memetic Algorithm for Energy-Efficient job-Shop Scheduling with Deteriorating Machines.” Expert Systems with Applications 157: 113348.
  • Barak, S., R. Moghdani, and H. Maghsoudlou. 2021. “Energy-efficient Multi-Objective Flexible Manufacturing Scheduling.” Journal of Cleaner Production 283: 124610.
  • Bilge, Ü, and G. Ulusoy. 1995. “A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS.” Operations Research 43 (6): 1058–1070.
  • Brossog, M., M. Bornschlegl, and J. Franke. 2015. “Reducing the Energy Consumption of Industrial Robots in Manufacturing Systems.” The International Journal of Advanced Manufacturing Technology 78 (5-8): 1315–1328.
  • Brucker, P., E. K. Burke, and S. Groenemeyer. 2012. “A Mixed Integer Programming Model for the Cyclic job-Shop Problem with Transportation.” Discrete Applied Mathematics 160 (13-14): 1924–1935.
  • Bukata, L., P. Šůcha, and Z. Hanzálek. 2019. “Optimizing Energy Consumption of Robotic Cells by a Branch & Bound Algorithm.” Computers & Operations Research 102: 52–66.
  • Caumond, A., P. Lacomme, A. Moukrim, and N. Tchernev. 2009. “An MILP for Scheduling Problems in an FMS with one Vehicle.” European Journal of Operational Research 199 (3): 706–722.
  • Cheng, C. Y., K. C. Ying, S. F. Li, and Y. C. Hsieh. 2019. “Minimizing Makespan in Mixed no-Wait Flowshops with Sequence-Dependent Setup Times.” Computers & Industrial Engineering 130: 338–347.
  • Chung, S. H. 2021. “Applications of Smart Technologies in Logistics and Transport: A Review.” Transportation Research Part E: Logistics and Transportation Review 153: 102455.
  • Dai, M., D. Tang, A. Giret, and M. A. Salido. 2019. “Multi-objective Optimization for Energy-Efficient Flexible job Shop Scheduling Problem with Transportation Constraints.” Robotics and Computer-Integrated Manufacturing 59: 143–157.
  • El Khayat, G., A. Langevin, and D. & Riopel. 2006. “Integrated Production and Material Handling Scheduling Using Mathematical Programming and Constraint Programming.” European Journal of Operational Research 175 (3): 1818–1832.
  • Gürel, S., H. Gultekin, and V. E. Akhlaghi. 2019. “Energy Conscious Scheduling of a Material Handling Robot in a Manufacturing Cell.” Robotics and Computer-Integrated Manufacturing 58: 97–108.
  • Ham, A. 2021. “Transfer-robot Task Scheduling in job Shop.” International Journal of Production Research 59 (3): 813–823.
  • Hassani, Z. I. M., A. E. Barkany, I. E. Abbassi, A. Jabri, and A. M. Darcherif. 2019. “New Model of Planning and Scheduling for job-Shop Production System with Energy Consideration.” Management and Production Engineering Review 10 (1): 89–97.
  • He, Y., and K. E. Stecke. 2021. Simultaneous part input sequencing and robot scheduling for mass customisation. International Journal of Production Research, in press.
  • Hurink, J., and S. Knust. 2002. “A Tabu Search Algorithm for Scheduling a Single Robot in a job-Shop Environment.” Discrete Applied Mathematics 119 (1-2): 181–203.
  • Jiang, E. D., and L. Wang. 2019. “An Improved Multi-Objective Evolutionary Algorithm Based on Decomposition for Energy-Efficient Permutation Flow Shop Scheduling Problem with Sequence-Dependent Setup Time.” International Journal of Production Research 57 (6): 1756–1771.
  • Koulamas, C., and S. S. Panwalkar. 2019. “The two-Stage no-Wait/Blocking Proportionate Super Shop Scheduling Problem.” International Journal of Production Research 57 (10): 2956–2965.
  • Lamotte, R., and N. Geroliminis. 2021. “Monotonicity in the Trip Scheduling Problem.” Transportation Research Part B: Methodological 146: 14–25.
  • Liu, Z., S. Guo, and L. Wang. 2019. “Integrated Green Scheduling Optimization of Flexible job Shop and Crane Transportation Considering Comprehensive Energy Consumption.” Journal of Cleaner Production 211: 765–786.
  • Liu, S. Q., E. Kozan, M. Masoud, Y. Zhang, and F. T. Chan. 2018. “Job Shop Scheduling with a Combination of Four Buffering Constraints.” International Journal of Production Research 56 (9): 3274–3293.
  • Masmoudi, O., X. Delorme, and P. Gianessi. 2019. “Job-shop Scheduling Problem with Energy Consideration.” International Journal of Production Economics 216: 12–22.
  • Meng, L., C. Zhang, X. Shao, and Y. Ren. 2019. “MILP Models for Energy-Aware Flexible job Shop Scheduling Problem.” Journal of Cleaner Production 210: 710–723.
  • Mokhtari, H., and A. Hasani. 2017. “An Energy-Efficient Multi-Objective Optimization for Flexible job-Shop Scheduling Problem.” Computers & Chemical Engineering 104: 339–352.
  • Parente, M., G. Figueira, P. Amorim, and A. Marques. 2020. “Production Scheduling in the Context of Industry 4.0: Review and Trends.” International Journal of Production Research 58 (17): 5401–5431.
  • Petrović, M., Z. Miljković, and A. Jokić. 2019. “A Novel Methodology for Optimal Single Mobile Robot Scheduling Using Whale Optimization Algorithm.” Applied Soft Computing 81: 105520.
  • Sun, Y., S. H. Chung, X. Wen, and H. L. Ma. 2021. “Novel Robotic job-Shop Scheduling Models with Deadlock and Robot Movement Considerations.” Transportation Research Part E: Logistics and Transportation Review 149: 102273.
  • Wang, J. J., and L. Wang. 2019. “Decoding Methods for the Flow Shop Scheduling with Peak Power Consumption Constraints.” International Journal of Production Research 57 (10): 3200–3218.
  • Zeng, C., J. Tang, and C. Yan. 2014. “Scheduling of no Buffer job Shop Cells with Blocking Constraints and Automated Guided Vehicles.” Applied Soft Computing 24: 1033–1046.
  • Zhang, R., and R. Chiong. 2016. “Solving the Energy-Efficient job Shop Scheduling Problem: A Multi-Objective Genetic Algorithm with Enhanced Local Search for Minimizing the Total Weighted Tardiness and Total Energy Consumption.” Journal of Cleaner Production 112: 3361–3375.
  • Zhang, M., and J. Yan. 2021. “A Data-Driven Method for Optimizing the Energy Consumption of Industrial Robots.” Journal of Cleaner Production 285: 124862.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.