630
Views
6
CrossRef citations to date
0
Altmetric
Research Articles

Production scheduling in a reconfigurable manufacturing system benefiting from human-robot collaboration

ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Pages 767-783 | Received 20 Apr 2022, Accepted 20 Jan 2023, Published online: 09 Feb 2023

References

  • Benedikt, O., I. Módos, and Z. Hanzálek. 2020. “Power of pre-Processing: Production Scheduling with Variable Energy Pricing and Power-Saving States.” Constraints 25 (3): 300–318. doi:10.1007/s10601-020-09317-y
  • Bensmaine, A., M. Dahane, and L. Benyoucef. 2014. “A new Heuristic for Integrated Process Planning and Scheduling in Reconfigurable Manufacturing Systems.” International Journal of Production Research 52 (12): 3583–3594. doi:10.1080/00207543.2013.878056
  • Berti, N., S. Finco, O. Battaïa, and X. Delorme. 2021. “Ageing Workforce Effects in Dual-Resource Constrained job-Shop Scheduling.” International Journal of Production Economics 237: 108151. doi:10.1016/j.ijpe.2021.108151
  • Bogner, K., U. Pferschy, R. Unterberger, and H. Zeiner. 2018. “Optimised Scheduling in Human–Robot Collaboration–a use Case in the Assembly of Printed Circuit Boards.” International Journal of Production Research 56 (16): 5522–5540. doi:10.1080/00207543.2018.1470695
  • Bortolini, M., F. G. Galizia, and C. Mora. 2018. “Reconfigurable Manufacturing Systems: Literature Review and Research Trend.” Journal of Manufacturing Systems 49: 93–106. doi:10.1016/j.jmsy.2018.09.005
  • Calzavara, M., D. Battini, D. Bogataj, F. Sgarbossa, and I. Zennaro. 2020. “Ageing Workforce Management in Manufacturing Systems: State of the art and Future Research Agenda.” International Journal of Production Research 58 (3): 729–747. doi:10.1080/00207543.2019.1600759
  • Čapek, R., P. Šůcha, and Z. Hanzálek. 2012. “Production Scheduling with Alternative Process Plans.” European Journal of Operational Research 217 (2): 300–311. doi:10.1016/j.ejor.2011.09.018
  • Dou, J., J. Li, and C. Su. 2016. “Bi-objective Optimization of Integrating Configuration Generation and Scheduling for Reconfigurable Flow Lines Using NSGA-II.” The International Journal of Advanced Manufacturing Technology 86 (5): 1945–1962. doi:10.1007/s00170-015-8291-8
  • Dou, J., J. Li, D. Xia, and X. Zhao. 2021. “A Multi-Objective Particle Swarm Optimisation for Integrated Configuration Design and Scheduling in Reconfigurable Manufacturing System.” International Journal of Production Research 59 (13): 3975–3995. doi:10.1080/00207543.2020.1756507
  • ElMaraghy, H. A. 2005. “Flexible and Reconfigurable Manufacturing Systems Paradigms.” International Journal of Flexible Manufacturing Systems 17 (4): 261–276. doi:10.1007/s10696-006-9028-7
  • Fan, J., C. Zhang, Q. Liu, W. Shen, and L. Gao. 2022. “An Improved Genetic Algorithm for Flexible job Shop Scheduling Problem Considering Reconfigurable Machine Tools with Limited Auxiliary Modules.” Journal of Manufacturing Systems 62: 650–667. doi:10.1016/j.jmsy.2022.01.014
  • Ferreira, C., G. Figueira, and P. Amorim. 2021. “Scheduling Human-Robot Teams in Collaborative Working Cells.” International Journal of Production Economics 235: 108094. doi:10.1016/j.ijpe.2021.108094
  • Finco, S., D. Battini, X. Delorme, A. Persona, and F. Sgarbossa. 2020. “Workers’ Rest Allowance and Smoothing of the Workload in Assembly Lines.” International Journal of Production Research 58 (4): 1255–1270. doi:10.1080/00207543.2019.1616847
  • Garey, M. R, D. S Johnson, and R. Sethi. 1976. “The Complexity of Flowshop and Jobshop Scheduling.” Mathematics of Operations Research 1 (2): 117–129. http://doi.org/10.1287/moor.1.2.117.
  • Gu, X., and Y. Koren. 2018. “Manufacturing System Architecture for Cost-Effective Mass-Individualization.” Manufacturing Letters 16: 44–48. doi:10.1016/j.mfglet.2018.04.002
  • Ham, A. M. 2018. “Integrated Scheduling of m-Truck, m-Drone, and m-Depot Constrained by Time-Window, Drop-Pickup, and m-Visit Using Constraint Programming.” Transportation Research Part C: Emerging Technologies 91: 1–14. doi:10.1016/j.trc.2018.03.025
  • Ham, A., and M.-J. Park. 2021. “Human–Robot Task Allocation and Scheduling: Boeing 777 Case Study.” IEEE Robotics and Automation Letters 6 (2): 1256–1263. doi:10.1109/LRA.2021.3056069
  • Hashemi-Petroodi, S. E., A. Dolgui, S. Kovalev, M. Y. Kovalyov, and S. Thevenin. 2021. “Workforce Reconfiguration Strategies in Manufacturing Systems: A State of the art.” International Journal of Production Research 59 (22): 6721–6744. doi:10.1080/00207543.2020.1823028
  • Hashemi-Petroodi, S. E., S. Thevenin, S. Kovalev, and A. Dolgui. 2020. “Operations Management Issues in Design and Control of Hybrid Human-Robot Collaborative Manufacturing Systems: A Survey.” Annual Reviews in Control 49: 264–276. doi:10.1016/j.arcontrol.2020.04.009
  • Heinz, V., A. Novák, M. Vlk, and Z. Hanzálek. 2022. “Constraint Programming and Constructive Heuristics for Parallel Machine Scheduling with Sequence-Dependent Setups and Common Servers.” Computers & Industrial Engineering 172: 108586. doi:10.1016/j.cie.2022.108586
  • Kong, F., and D. Dou. 2021. “Resource-constrained Project Scheduling Problem Under Multiple Time Constraints.” Journal of Construction Engineering and Management 147 (2): 04020170. doi:10.1061/(ASCE)CO.1943-7862.0001990
  • Koren, Y., X. Gu, and W. Guo. 2018. “Reconfigurable Manufacturing Systems: Principles, Design, and Future Trends.” Frontiers of Mechanical Engineering 13 (2): 121–136. doi:10.1007/s11465-018-0483-0
  • Koren, Y., and M. Shpitalni. 2010. “Design of Reconfigurable Manufacturing Systems.” Journal of Manufacturing Systems 29 (4): 130–141. doi:10.1016/j.jmsy.2011.01.001
  • Laborie, P., J. Rogerie, P. Shaw, and P. Vilím. 2018. “IBM ILOG CP Optimizer for Scheduling.” Constraints 23 (2): 210–250. doi:10.1007/s10601-018-9281-x
  • Lunardi, W. T., E. G. Birgin, P. Laborie, D. P. Ronconi, and H. Voos. 2020. “Mixed Integer Linear Programming and Constraint Programming Models for the Online Printing Shop Scheduling Problem.” Computers & Operations Research 123: 105020. doi:10.1016/j.cor.2020.105020
  • Mahmoodjanloo, M., R. Tavakkoli-Moghaddama, A. Baboli, and A. Bozorgi-Amiri. 2022. “Distributed job-Shop Rescheduling Problem Considering Reconfigurability of Machines: A Self-Adaptive Hybrid Equilibrium Optimiser.” International Journal of Production Research 60 (16): 4973–4994. doi:10.1080/00207543.2021.1946193
  • Mahmoodjanloo, M., R. Tavakkoli-Moghaddam, A. Baboli, and A. Bozorgi-Amiri. 2020. “Flexible job Shop Scheduling Problem with Reconfigurable Machine Tools: An Improved Differential Evolution Algorithm.” Applied Soft Computing 94: 106416. doi:10.1016/j.asoc.2020.106416
  • MarketsAndMarkets. “Collaborative Robot Market”. https://www.marketsandmarkets.com/Market-Reports/collaborative-robot-market-194541294.html.
  • Matheson, E., R. Minto, E. G. Zampieri, M. Faccio, and G. Rosati. 2019. “Human–Robot Collaboration in Manufacturing Applications: A Review.” Robotics 8 (4): 100. 1-25. doi:10.3390/robotics8040100
  • Meng, L., C. Zhang, Y. Ren, B. Zhang, and C. Lv. 2020. “Mixed-integer Linear Programming and Constraint Programming Formulations for Solving Distributed Flexible job Shop Scheduling Problem.” Computers & Industrial Engineering 142: 106347. doi:10.1016/j.cie.2020.106347
  • Mokhtarzadeh, M., R. Tavakkoli-Moghaddam, B. Vahedi-Nouri, and A. Farsi. 2020. “Scheduling of Human-Robot Collaboration in Assembly of Printed Circuit Boards: A Constraint Programming Approach.” International Journal of Computer Integrated Manufacturing 33 (5): 460–473. doi:10.1080/0951192X.2020.1736713
  • Nourmohammadi, A., M. Fathi, and A. H. Ng. 2022. “Balancing and Scheduling Assembly Lines with Human-Robot Collaboration Tasks.” Computers & Operations Research 140: 105674. doi:10.1016/j.cor.2021.105674
  • Olsen, T. L., and B. Tomlin. 2020. “Industry 4.0: Opportunities and Challenges for Operations Management.” Manufacturing & Service Operations Management 22 (1): 113–122. doi:10.1287/msom.2019.0796
  • Paul Wellener, V. R., Heather Ashton, and Chad Moutray. 2021. “The Jobs Are Here, But Where Are the People? Key findings from the 2018 Deloitte and The Manufacturing Institute skills gap and future of work study.” Deloitte and The Manufacturing Institute. https://www2.deloitte.com/us/en/insights/industry/manufacturing/manufacturing-industry-diversity.html/#endnote-5.
  • Pearce, M., B. Mutlu, J. Shah, and R. Radwin. 2018. “Optimizing Makespan and Ergonomics in Integrating Collaborative Robots Into Manufacturing Processes.” IEEE Transactions on Automation Science and Engineering 15 (4): 1772–1784. doi:10.1109/TASE.2018.2789820
  • Rossi, F., P. Van Beek, and T. Walsh. 2006. Handbook of Constraint Programming. New York: Elsevier.
  • Sadik, A. R., and B. Urban. 2017. “Flow Shop Scheduling Problem and Solution in Cooperative Robotics - Case-Study: One Cobot in Cooperation with one Worker.” Future Internet 9 (3): 48. doi:10.3390/fi9030048
  • Safarzadeh, H., and F. Kianfar. 2019. “Job Shop Scheduling with the Option of Jobs Outsourcing.” International Journal of Production Research 57 (10): 3255–3272. doi:10.1080/00207543.2019.1579934
  • Servranckx, T., J. Coelho, and M. Vanhoucke. 2022. “Various Extensions in Resource-Constrained Project Scheduling with Alternative Subgraphs.” International Journal of Production Research 60 (11): 3501–3520. doi:10.1080/00207543.2021.1924411
  • Stecke, K. E., and M. Mokhtarzadeh. 2022. “Balancing Collaborative Human-Robot Assembly Lines to Optimise Cycle Time and Ergonomic Risk.” International Journal of Production Research 60 (1): 25–47. doi:10.1080/00207543.2021.1989077
  • Vahedi-Nouri, B., R. Tavakkoli-Moghaddam, Z. Hanzalek, and A. Dolgui. 2021. “Integrated Workforce Allocation and Scheduling in a Reconfigurable Manufacturing System Considering Cloud Manufacturing.” In Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems. APMS 2021. IFIP Advances in Information and Communication Technology, vol 631, edited by A. Dolgui, A. Bernard, D. Lemoine, G. von Cieminski, and D. Romero, 535–543. Cham: Springer.
  • Vahedi-Nouri, B., R. Tavakkoli-Moghaddam, Z. Hanzálek, and A. Dolgui. 2022. “Workforce Planning and Production Scheduling in a Reconfigurable Manufacturing System Facing the COVID-19 Pandemic.” Journal of Manufacturing Systems 63: 563–574. doi:10.1016/j.jmsy.2022.04.018
  • Weber, L. 2021. “Companies Use Overtime to Solve Worker Shortages. That May Cost Them More Workers.” The wall street journal. https://www.wsj.com/articles/companies-use-overtime-to-solve-worker-shortages-that-may-cost-them-more-workers-11631937827#comments_sector.
  • Weckenborg, C., K. Kieckhäfer, C. Müller, M. Grunewald, and T. S. Spengler. 2020. “Balancing of Assembly Lines with Collaborative Robots.” Business Research 13 (1): 93–132. doi:10.1007/s40685-019-0101-y
  • Ye, H., and M. Liang. 2006. “Simultaneous Modular Product Scheduling and Manufacturing Cell Reconfiguration Using a Genetic Algorithm.” Journal of Manufacturing Science and Engineering 128 (4): 984–995. doi:10.1115/1.2336261
  • Yelles-Chaouche, A. R., E. Gurevsky, N. Brahimi, and A. Dolgui. 2021. “Reconfigurable Manufacturing Systems from an Optimisation Perspective: A Focused Review of Literature.” International Journal of Production Research 59 (21): 6400–6418. doi:10.1080/00207543.2020.1813913
  • Younespour, M., A. Atighehchian, K. Kianfar, and E. T. Esfahani. 2019. “Using Mixed Integer Programming and Constraint Programming for Operating Rooms Scheduling with Modified Block Strategy.” Operations Research for Health Care 23: 100220. doi:10.1016/j.orhc.2019.100220
  • Yunusoglu, P., and S. Topaloglu Yildiz. 2022. “Constraint Programming Approach for Multi-Resource-Constrained Unrelated Parallel Machine Scheduling Problem with Sequence-Dependent Setup Times.” International Journal of Production Research 60 (7): 2212–2229. doi:10.1080/00207543.2021.1885068
  • Zhang, M., C. Li, Y. Shang, H. Huang, W. Zhu, and Y. Liu. 2022. “A Task Scheduling Model Integrating Micro-Breaks for Optimisation of job-Cycle Time in Human-Robot Collaborative Assembly Cells.” International Journal of Production Research 60 (15): 4766–4777. doi:10.1080/00207543.2021.1937746

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.