161
Views
0
CrossRef citations to date
0
Altmetric
Research Articles

Joint scheduling of spare parts production and service engineers based on progressive Pareto algorithm

, , ORCID Icon, &
Pages 2124-2141 | Received 13 Jul 2022, Accepted 10 Apr 2023, Published online: 28 May 2023

References

  • Akl, Amany M., Sondoss El Sawah, Ripon K. Chakrabortty, and Hasan Huseyin Turan. 2022. “A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation-Optimization Approach.” Reliability Engineering & System Safety 219. doi:10.1016/j.ress.2021.108175.
  • Deb, K., A. Pratap, S. Agarwal, and T. Meyarivan. 2002. “A Fast and Elitist Multiobjective Genetic Algorithm: NSGA-II.” IEEE Transactions on Evolutionary Computation 6 (2): 182–197. doi:10.1109/4235.996017.
  • Diallo, Claver, Uday Venkatadri, Abdelhakim Khatab, Zhuojun Liu, and El-Houssaine Aghezzaf. 2019. “Optimal Joint Selective Imperfect Maintenance and Multiple Repairpersons Assignment Strategy for Complex Multicomponent Systems.” International Journal of Production Research 57 (13): 4098–4117. doi:10.1080/00207543.2018.1505060.
  • Ding, Jian-Ya, Shiji Song, and Cheng Wu. 2016. “Carbon-Efficient Scheduling of Flow Shops by Multi-Objective Optimization.” European Journal of Operational Research 248 (3): 758–771. doi:10.1016/j.ejor.2015.05.019.
  • Gong, M. G., L. C. Jiao, H. F. Du, and L. F. Bo. 2008. “Multiobjective Immune Algorithm with Nondominated Neighbor-Based Selection.” Evolutionary Computation 16 (2): 225–255. doi:10.1162/evco.2008.16.2.225.
  • Hasni, M., M. S. Aguir, M. Z. Babai, and Z. Jemai. 2019. “Spare Parts Demand Forecasting: A Review on Bootstrapping Methods.” International Journal of Production Research 57 (15–16): 4791–4804. doi:10.1080/00207543.2018.1424375.
  • Huang, Jiang-Ping, Quan-Ke Pan, and Liang Gao. 2020. “An Effective Iterated Greedy Method for the Distributed Permutation Flowshop Scheduling Problem with Sequence-Dependent Setup Times.” Swarm and Evolutionary Computation 59. doi:10.1016/j.swevo.2020.100742.
  • Jiang, Peng, Yibin Huang, and Xiao Liu. 2020. “Intermittent Demand Forecasting for Spare Parts in the Heavy-Duty Vehicle Industry: A Support Vector Machine Model.” International Journal of Production Research. doi:10.1080/00207543.2020.1842936.
  • Jing, Xue-Lei, Quan-Ke Pan, Liang Gao, and Yu-Long Wang. 2020. “An Effective Iterated Greedy Algorithm for the Distributed Permutation Flowshop Scheduling with due Windows.” Applied Soft Computing 96. doi:10.1016/j.asoc.2020.106629.
  • Kafiabad, Shayan Tavakoli, Masoumeh Kazemi Zanjani, and Mustapha Nourelfath. 2020. “Integrated Planning of Operations and on-job Training in Maintenance Logistics Networks.” Reliability Engineering & System Safety 199. doi:10.1016/j.ress.2020.106922.
  • Kafiabad, Shayan Tavakoli, M. K. Zanjani, and M. Nourelfath. 2022. “Workforce Training and Operations Planning for Maintenance Centres Under Demand Uncertainty.” International Journal of Production Research 60 (5): 1587–1599. doi:10.1080/00207543.2020.1866781.
  • Kouki, Chaaben, and Christian Larsen. 2021. “Rationing Policies in a Spare Parts Inventory System with Customers Differentiation.” International Journal of Production Research 59 (20): 6270–6290. doi:10.1080/00207543.2020.1811418.
  • Larbi Rebaiaia, Mohamed, and Daoud Ait-kadi. 2021. “Maintenance Policies with Minimal Repair and Replacement on Failures: Analysis and Comparison.” International Journal of Production Research 59 (23): 6995–7017. doi:10.1080/00207543.2020.1832275.
  • Li, Ling, Min Liu, Weiming Shen, and Guoqing Cheng. 2016. “A Discrete Stress-Strength Interference Theory-Based Dynamic Supplier Selection Model for Maintenance Service Outsourcing.” Ieee Transactions on Engineering Management 63 (2): 189–200. doi:10.1109/tem.2016.2527684.
  • Li, H., S. H. Mi, Q. F. Li, X. Y. Wen, D. P. Qiao, and G. F. Luo. 2020. “A Scheduling Optimization Method for Maintenance, Repair and Operations Service Resources of Complex Products.” Journal of Intelligent Manufacturing 31 (7): 1673–1691. doi:10.1007/s10845-018-1400-4.
  • Meng, T., Q. K. Pan, and L. Wang. 2019. “A Distributed Permutation Flowshop Scheduling Problem with the Customer Order Constraint.” Knowledge-Based Systems 184: 17. doi:10.1016/j.knosys.2019.104894.
  • Miao, Bingxin, Qianwang Deng, Like Zhang, Zhangwen Huo, and Xiaoyan Liu. 2022. “Collaborative Scheduling of Spare Parts Production and Service Workers Driven by Distributed Maintenance Demand.” Journal of Manufacturing Systems 64: 261–274. doi:10.1016/j.jmsy.2022.06.012.
  • Minella, G., R. Ruiz, and M. Ciavotta. 2011. “Restarted Iterated Pareto Greedy Algorithm for Multi-Objective Flowshop Scheduling Problems.” Computers & Operations Research 38 (11): 1521–1533. doi:10.1016/j.cor.2011.01.010.
  • Rahimi-Ghahroodi, S., A. Al Hanbali, I. M. H. Vliegen, and M. A. Cohen. 2019. “Joint Optimization of Spare Parts Inventory and Service Engineers Staffing with Full Backlogging.” International Journal of Production Economics 212: 39–50. doi:10.1016/j.ijpe.2019.02.007.
  • Shen, Jiayu, and Kai Zhu. 2018. “An Uncertain Single Machine Scheduling Problem with Periodic Maintenance.” Knowledge-Based Systems 144: 32–41. doi:10.1016/j.knosys.2017.12.021.
  • Si, Guojin, Tangbin Xia, Ershun Pan, and Lifeng Xi. 2021. “Service-oriented Global Optimization Integrating Maintenance Grouping and Technician Routing for Multi-Location Multi-Unit Production Systems.” IISE Transactions. doi:10.1080/24725854.2021.1957181.
  • Si, G., T. Xia, K. Zhang, D. Wang, E. Pan, and L. Xi. 2021. “Technician Collaboration and Routing Optimization in Global Maintenance Scheduling for Multi-Center Service Networks.” Ieee Transactions on Automation Science and Engineering, 1–13. doi:10.1109/TASE.2021.3132694.
  • Sleptchenko, A., A. Al Hanbali, and H. Zijm. 2018. “Joint Planning of Service Engineers and Spare Parts.” European Journal of Operational Research 271 (1): 97–108. doi:10.1016/j.ejor.2018.05.014.
  • Sun, Mingyao, Chi To Ng, Feng Wu, and T. C. E. Cheng. 2022. “Optimization of After-Sales Services with Spare Parts Consumption and Repairman Travel.” International Journal of Production Economics 244. doi:10.1016/j.ijpe.2021.108382.
  • Turan, Hasan Huseyin, Fuat Kosanoglu, and Mahir Atmis. 2021. “A Multi-Skilled Workforce Optimisation in Maintenance Logistics Networks by Multi-Thread Simulated Annealing Algorithms.” International Journal of Production Research 59 (9): 2624–2646. doi:10.1080/00207543.2020.1735665.
  • Vahdani, Behnam, Fariborz Jolai, Reza Tavakkoli-Moghaddam, and S. Meysam Mousavi. 2012. “Two Fuzzy Possibilistic bi-Objective Zero-one Programming Models for Outsourcing the Equipment Maintenance Problem.” Engineering Optimization 44 (7): 801–820. doi:10.1080/0305215x.2011.613465.
  • Van der Auweraer, S., and R. Boute. 2019. “Forecasting Spare Part Demand Using Service Maintenance Information.” International Journal of Production Economics 213: 138–149. doi:10.1016/j.ijpe.2019.03.015.
  • Wang, Z. L., B. W. Cui, Q. Feng, B. Q. Huang, Y. Ren, B. Sun, D. Z. Yang, and Z. Zuo. 2019. “An Agent-Based Approach for Resources’ Joint Planning in a Multi-Echelon Inventory System Considering Lateral Transshipment.” Computers & Industrial Engineering 138. doi:10.1016/j.cie.2019.106098.
  • Wang, J., and X. Y. Zhu. 2021. “Joint Optimization of Condition-Based Maintenance and Inventory Control for a k-out-of-n:F System of Multi-State Degrading Components.” European Journal of Operational Research 290 (2): 514–529. doi:10.1016/j.ejor.2020.08.016.
  • Wu, O., G. D. Ave, I. Harjunkoski, A. Bouaswaig, S. M. Schneider, M. Roth, and L. Imsland. 2020. “Optimal Production and Maintenance Scheduling for a Multiproduct Batch Plant Considering Degradation.” Computers & Chemical Engineering 135. doi:10.1016/j.compchemeng.2020.106734.
  • Wu, Xueqi, and Ada Che. 2019. “A Memetic Differential Evolution Algorithm for Energy-Efficient Parallel Machine Scheduling.” Omega-International Journal of Management Science 82: 155–165. doi:10.1016/j.omega.2018.01.001.
  • Yepes-Borrero, J. C., F. Perea, R. Ruiz, and F. Villa. 2021. “Bi-objective Parallel Machine Scheduling with Additional Resources During Setups.” European Journal of Operational Research 292 (2): 443–455. doi:10.1016/j.ejor.2020.10.052.
  • Zhang, Like, Qianwang Deng, Guiliang Gong, and Wenwu Han. 2020. “A New Unrelated Parallel Machine Scheduling Problem with Tool Changes to Minimise the Total Energy Consumption.” International Journal of Production Research 58 (22): 6826–6845. doi:10.1080/00207543.2019.1685708.
  • Zhang, Like, Qianwang Deng, Bingxin Miao, Xiaoyan Liu, and Haidong Shao. 2022. “Parallel Service Mode of Production and Inventory for Spare Part Inventory Optimization.” Knowledge-Based Systems 241. doi:10.1016/j.knosys.2022.108282.
  • Zhang, Qingfu, and Hui Li. 2007. “MOEA/D: A Multiobjective Evolutionary Algorithm Based on Decomposition.” Ieee Transactions on Evolutionary Computation 11 (6): 712–731. doi:10.1109/tevc.2007.892759.
  • Zhang, Zikai, Qiuhua Tang, and Manuel Chica. 2021. “Maintenance Costs and Makespan Minimization for Assembly Permutation Flow Shop Scheduling by Considering Preventive and Corrective Maintenance.” Journal of Manufacturing Systems 59: 549–564. doi:10.1016/j.jmsy.2021.03.020.
  • Zhao, Xingdong, Qianwang Deng, Xiahui Liu, Like Zhang, Shengcong Wu, and Chao Jiang. 2021. “Integrated Scheduling of Distributed Service Resources for Complex Equipment Considering Multiple On-Site MRO Tasks.” International Journal of Production Research. doi:10.1080/00207543.2021.1916117.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.