References
- Absi, N., S. Dauzère-Pérès, S. Kedad-Sidhoum, B. Penz, and C. Rapine. 2013. “Lot Sizing with Carbon Emission Constraints.” European Journal of Operational Research 227 (1): 55–61. https://doi.org/10.1016/j.ejor.2012.11.044.
- Absi, N., S. Dauzère-Pérès, S. Kedad-Sidhoum, B. Penz, and C. Rapine. 2016. “The Single-item Green Lot-sizing Problem with Fixed Carbon Emissions.” European Journal of Operational Research 248 (3): 849–855. https://doi.org/10.1016/j.ejor.2015.07.052.
- Akbalik, A., and B. Penz. 2009. “Exact Methods for Single-item Capacitated Lot Sizing Problem with Alternative Machines and Piece-wise Linear Production Costs.” International Journal of Production Economics 119 (2): 367–379. https://doi.org/10.1016/j.ijpe.2009.03.010.
- Akbalik, A., and C. Rapine. 2014. “Single-item Lot Sizing Problem with Carbon Emission Under the Cap-and-Trade Policy.” In 2014 International Conference on Control, Decision and Information Technologies, 030–035, IEEE.
- Benjaafar, S., Y. Li, and M. Daskin. 2012. “Carbon Footprint and the Management of Supply Chains: Insights From Simple Models.” IEEE Transactions on Automation Science and Engineering 10 (1): 99–116. https://doi.org/10.1109/TASE.2012.2203304.
- Brahimi, N., N. Absi, S. Dauzère-Pérès, and A. Nordli. 2017. “Single-item Dynamic Lot-sizing Problems: An Updated Survey.” European Journal of Operational Research 263 (3): 838–863. https://doi.org/10.1016/j.ejor.2017.05.008.
- Brahimi, N., S. Dauzere-Peres, N. M. Najid, and A. Nordli. 2006. “Single Item Lot Sizing Problems.” European Journal of Operational Research 168 (1): 1–16. https://doi.org/10.1016/j.ejor.2004.01.054.
- Christata, B. R., and Y. Daryanto. 2020. “EOQ Inventory Model with Carbon Emission Consideration: A Literature Review.” In Proceeding on International Conference of Science Management Art Research Technology Vol. 1, 19–25. IKATAN DOSEN REPUBLIK INDONESIA, RSF Press & Research Synergy Foundation.
- Clark, A., B. Almada-Lobo, and C. Almeder. 2011. “Lot Sizing and Scheduling: Industrial Extensions and Research Opportunities.” International Journal of Production Research 49 (9): 2457–2461. https://doi.org/10.1080/00207543.2010.532908.
- EcoTransIT. 2022. https://www.ecotransit.org.
- Florian, M., J. K. Lenstra, and A. Rinnooy Kan. 1980. “Deterministic Production Planning: Algorithms and Complexity.” Management Science 26 (7): 669–679. https://doi.org/10.1287/mnsc.26.7.669.
- Google Scholar. Nov, 2022. https://scholar.google.com.
- Greenhouse Gas Protocol. 2022. https://ghgprotocol.org.
- Helmrich, M. J. R., R. Jans, and A. P. Wagelmans. 2015. “The Economic Lot-sizing Problem with an Emission Capacity Constraint.” European Journal of Operational Research 241 (1): 50–62. https://doi.org/10.1016/j.ejor.2014.06.030.
- Hong, Z., C. Chu, and Y. Yu. 2016. “Dual-mode Production Planning for Manufacturing with Emission Constraints.” European Journal of Operational Research 251 (1): 96–106. https://doi.org/10.1016/j.ejor.2015.11.015.
- Jans, R., and Z. Degraeve. 2008. “Modeling Industrial Lot Sizing Problems: A Review.” International Journal of Production Research 46 (6): 1619–1643. https://doi.org/10.1080/00207540600902262.
- Karmarkar, N. 1984. “A New Polynomial-time Algorithm for Linear Programming.” In Proceedings of the Sixteenth Annual ACM Symposium on Theory of Computing, 302–311. New York: Association for Computing Machinery.
- Koca, E., H. Yaman, and M. S. Aktürk. 2014. “Lot Sizing with Piecewise Concave Production Costs.” INFORMS Journal on Computing 26 (4): 767–779. https://doi.org/10.1287/ijoc.2014.0597.
- Kulkarni, K., and M. Bansal. 2022. “Exact Algorithms for Multi-module Capacitated Lot-sizing Problem, and Its Generalizations with Two-echelons and Piecewise Concave Production Costs.” IISE Transactions. https://doi.org/10.1080/24725854.2022.2153948.
- Orlin, J. 1988. “A Faster Strongly Polynomial Minimum Cost Flow Algorithm.” In Proceedings of the Twentieth Annual ACM Symposium on Theory of Computing, 377–387. Chicago, IL: Association for Computing Machinery.
- Ou, J.. 2017. “Improved Exact Algorithms to Economic Lot-sizing with Piecewise Linear Production Costs.” European Journal of Operational Research 256 (3): 777–784. https://doi.org/10.1016/j.ejor.2016.06.040.
- Pinto, Y., and R. Shamir 1994. “Efficient Algorithms for Minimum-cost Flow Problems with Piecewise-linear Convex Costs.” Algorithmica 11 (3): 256–277. https://doi.org/10.1007/BF01240736.
- Pochet, Y., and L. A. Wolsey. 1994. “Polyhedra for Lot-sizing with Wagner–Whitin Costs.” Mathematical Programming 67 (1–3): 297–323. https://doi.org/10.1007/BF01582225.
- Pochet, Y., and L. A. Wolsey. 2006. Production Planning by Mixed Integer Programming. New York, USA: Springer.
- Rapine, C., G. Goisque, and A. Akbalik. 2018. “Energy-aware Lot Sizing Problem: Complexity Analysis and Exact Algorithms.” International Journal of Production Economics 203:254–263. https://doi.org/10.1016/j.ijpe.2018.06.020.
- Romeijn, H. E., D. R. Morales, and W. Van den Heuvel. 2014. “Computational Complexity of Finding Pareto Efficient Outcomes for Biobjective Lot-sizing Models.” Naval Research Logistics 61 (5): 386–402. https://doi.org/10.1002/nav.21590.
- Shamos, M. I., and D. Hoey. 1976. “Geometric intersection problems.” In 17th Annual Symposium on Foundations of Computer Science, 208–215, IEEE.
- Swoveland, C. 1975. “A Deterministic Multi-period Production Planning Model with Piecewise Concave Production and Holding-backorder Costs.” Management Science 21 (9): 1007–1013. https://doi.org/10.1287/mnsc.21.9.1007.
- TRL. 2022. https://www.trl.co.uk/solutions/climate-change-and-sustainability.
- Van Vyve, M.. 2004. “A Solution Approach of Production Planning Problems Based on Compact Formulations for Single-item Lot-sizing Models.” 4OR 2 (1): 89–91. https://doi.org/10.1007/s10288-003-0026-2.
- Wagelmans, A., S. Van Hoesel, and A. Kolen. 1992. “Economic Lot Sizing: An O(nlogn) Algorithm that Runs in Linear Time in the Wagner-Whitin Case.” Operations Research 40 (1): 145–156. https://doi.org/10.1287/opre.40.1.S145.
- Wagner, H., and T. Whitin. 1958. “Dynamic Version of the Economic Lot Size Model.” Management Science 5 (1): 89–96. https://doi.org/10.1287/mnsc.5.1.89.