250
Views
1
CrossRef citations to date
0
Altmetric
Research Articles

Optimal designs of the omnibus SPRT control chart for joint monitoring of process mean and dispersion

ORCID Icon, ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Pages 4202-4225 | Received 06 Feb 2023, Accepted 26 Aug 2023, Published online: 11 Sep 2023

References

  • Azuaje, F. P., and T. K. Das. 2001. “Simultaneous Monitoring of Mean and Variance Through Optimally Designed SPRT Charts.” In Integrated Models in Production Planning, Inventory, Quality, and Maintenance, edited by M. A. Rahim and M. Ben-Daya, 399–440. Boston: Massachusetts.
  • Chatterjee, K., C. Koukouvinos, and A. Lappa. 2022. “Monitoring Process Mean and Variability with One Triple EWMA Chart.” Communications in Statistics-Simulation and Computation. Advance online publication. https://doi.org/10.1080/03610918.2022.2025835
  • Chatterjee, K., C. Koukouvinos, and A. Lappa. 2023. “Monitoring Process Mean and Dispersion with One Double Generally Weighted Moving Average Control Chart.” Journal of Applied Statistics 50 (1): 19–42. https://doi.org/10.1080/02664763.2021.1980506
  • Chen, G., S. W. Cheng, and H. Xie. 2001. “Monitoring Process Mean and Variability with One EWMA Chart.” Journal of Quality Technology 33 (2): 223–233. https://doi.org/10.1080/00224065.2001.11980069
  • Costa, A. F. B., M. S. de Magalhães, and E. K. Epprecht. 2009. “Monitoring the Process Mean and Variance Using a Synthetic Control Chart with Two-Stage Testing.” International Journal of Production Research 47 (18): 5067–5086. https://doi.org/10.1080/00207540802047098
  • Domangue, R., and S. C. Patch. 1991. “Some Omnibus Exponentially Weighted Moving Average Statistical Process Monitoring Schemes.” Technometrics 33 (3): 299–313. https://doi.org/10.1080/00401706.1991.10484836
  • Engmann, G. M., and D. Han. 2022. “The Optimized CUSUM and EWMA Multi-Charts for Jointly Detecting a Range of Mean and Variance Change.” Journal of Applied Statistics 49 (6): 1540–1558. https://doi.org/10.1080/02664763.2020.1870670
  • Feng, Z., J. Wang, Y. Ma, and Y. Tu. 2021. “Robust Parameter Design Based on Gaussian Process with Model Uncertainty.” International Journal of Production Research 59 (9): 2772–2788. https://doi.org/10.1080/00207543.2020.1740344
  • Gan, F. F., K. W. Ting, and T. C. Chang. 2004. “Interval Charting Schemes for Joint Monitoring of Process Mean and Variance.” Quality and Reliability Engineering International 20 (4): 291–303. https://doi.org/10.1002/qre.543
  • Genta, G., M. Galetto, and F. Franceschini. 2020. “Inspection Procedures in Manufacturing Processes: Recent Studies and Research Perspectives.” International Journal of Production Research 58 (15): 4767–4788. https://doi.org/10.1080/00207543.2020.1766713
  • Godase, D. G., and S. B. Mahadik. 2019. “The SPRT Control Chart for Process Dispersion.” Quality and Reliability Engineering International 35 (6): 1878–1889. https://doi.org/10.1002/qre.2481
  • Haridy, S., M. Shamsuzzaman, I. Alsyouf, and A. Mukherjee. 2020. “An Improved Design of Exponentially Weighted Moving Average Scheme for Monitoring Attributes.” International Journal of Production Research 58 (3): 931–946. https://doi.org/10.1080/00207543.2019.1605224
  • Harman, G. 2010. Wire Bonding in Microelectronics. New York: McGraw-Hill.
  • Hawkins, D. M., and Q. Deng. 2009. “Combined Charts for Mean and Variance Information.” Journal of Quality Technology 41 (4): 415–425. https://doi.org/10.1080/00224065.2009.11917795
  • Hawkins, D. M., and D. H. Olwell. 1998. Cumulative Sum Charts and Charting for Quality Improvement. Berlin: Springer Science + Business Media.
  • He, Z., Y. Gao, L. Qu, and Z. Wang. 2022. “A Nonparametric CUSUM Scheme for Monitoring Multivariate Time-Between-Events-and-Amplitude Data with Application to Automobile Painting.” International Journal of Production Research 60 (18): 5432–5449. https://doi.org/10.1080/00207543.2021.1959664
  • Hou, S., and K. Yu. 2021. “A Non-Parametric CUSUM Control Chart for Process Distribution Change Detection and Change Type Diagnosis.” International Journal of Production Research 59 (4): 1166–1186. https://doi.org/10.1080/00207543.2020.1721588
  • Jalilibal, Z., A. Amiri, and M. B. C. Khoo. 2022. “A Literature Review on Joint Control Schemes in Statistical Process Monitoring.” Quality and Reliability Engineering International 38 (6): 3270–3289. https://doi.org/10.1002/qre.3114
  • Lin, F., T. Jia, R. Y. Fung, and P. Wu. 2021. “Impacts of Inspection Rate on Integrated Inventory Models with Defective Items Considering Capacity Utilization: Rework-Versus Delivery-Priority.” Computers & Industrial Engineering 156 (6): Article 107245. https://doi.org/10.1016/j.cie.2021.107245.
  • Liu, D., H. Kim, S. H. Kim, T. Kim, D. Lee, and Y. Xie. 2023. “Distribution-Free Multivariate Time-Series Monitoring with Analytically Determined Control Limits.” International Journal of Production Research 61 (20): 6960–6977.
  • Megoze Pongha, P., G. R. Kibouka, J. P. Kenné, and L. A. Hof. 2022. “Production, Maintenance and Quality Inspection Planning of a Hybrid Manufacturing/Remanufacturing System Under Production Rate-Dependent Deterioration.” The International Journal of Advanced Manufacturing Technology 121 (1–2): 1289–1314. https://doi.org/10.1007/s00170-022-09078-3.
  • Montgomery, D. C. 2013. Introduction to Statistical Quality Control. New York: John Wiley & Sons.
  • Moustakides, G. V. 1986. “Optimal Stopping Times for Detecting Changes in Distributions.” The Annals of Statistics 14 (4): 1379–1387. https://doi.org/10.1214/aos/1176350164
  • Naderkhani, F. 2022. “Time to Signal Distribution of Multivariate Bayesian Control Chart with Dual Sampling Scheme.” International Journal of Production Research 60 (20): 6124–6147. https://doi.org/10.1080/00207543.2021.1985182
  • Ou, Y., N. Chen, and M. B. C. Khoo. 2015. “An Efficient Multivariate Control Charting Mechanism Based on SPRT.” International Journal of Production Research 53 (7): 1937–1949. https://doi.org/10.1080/00207543.2014.925601
  • Ou, Y., Z. Wu, and T. N. Goh. 2011. “A New SPRT Chart for Monitoring Process Mean and Variance.” International Journal of Production Economics 132 (2): 303–314. https://doi.org/10.1016/j.ijpe.2011.05.002
  • Ou, Y., Z. Wu, K. M. Lee, and S. Chen. 2012. “An Optimal Design Algorithm of the SPRT Chart for Minimizing Weighted ATS.” International Journal of Production Economics 139 (2): 564–574. https://doi.org/10.1016/j.ijpe.2012.05.031.
  • Ou, Y., Z. Wu, and F. Tsung. 2012. “A Comparison Study of Effectiveness and Robustness of Control Charts for Monitoring Process Mean.” International Journal of Production Economics 135 (1): 479–490. https://doi.org/10.1016/j.ijpe.2011.08.026.
  • Page, E. S. 1954. “Continuous Inspection Schemes.” Biometrika 41 (1/2): 100–115. https://doi.org/10.1093/biomet/41.1-2.100.
  • Perry, M. B., and Z. Wang. 2022. “A Distribution-Free Joint Monitoring Scheme for Location and Scale Using Individual Observations.” Journal of Quality Technology 54 (2): 144–161. https://doi.org/10.1080/00224065.2020.1829213
  • Qiu, P. 2018. “Some Perspectives on Nonparametric Statistical Process Control.” Journal of Quality Technology 50 (1): 49–65. https://doi.org/10.1080/00224065.2018.1404315
  • Rasay, H., and E. Alinezhad. 2022. “Developing an Adaptable Sequential Probability Ratio Test Applicable for Lifetime Analysis of Different Continuous Distributions.” Quality Technology & Quantitative Management 19 (4): 511–530. https://doi.org/10.1080/16843703.2021.2020954
  • Reynolds, Jr. M. R., and Z. G. Stoumbos. 2004. “Control Charts and the Efficient Allocation of Sampling Resources.” Technometrics 46 (2): 200–214. https://doi.org/10.1198/004017004000000257.
  • Riaz, M., Q. U. A. Khaliq, M. Abid, and I. A. Arshad. 2022. “On Designing Efficient Sequential Schemes to Monitor Non-Normal Processes.” Quality and Reliability Engineering International 38 (1): 615–634. https://doi.org/10.1002/qre.3005
  • Saniga, E. M. 1991. “Joint Statistical Design of X¯ and R Control Charts.” Journal of Quality Technology 23 (2): 156–162. https://doi.org/10.1080/00224065.1991.11979305.
  • Stoumbos, Z. G., and Jr. M. R. Reynolds. 1997. “Control Charts Applying a Sequential Test at Fixed Sampling Intervals.” Journal of Quality Technology 29 (1): 21–40. https://doi.org/10.1080/00224065.1997.11979722.
  • Tartakovsky, A., I. Nikiforov, and M. Basseville. 2015. Sequential Analysis: Hypothesis Testing and Changepoint Detection. Florida: CRC Press.
  • Teoh, J. W., W. L. Teoh, M. B. C. Khoo, P. Castagliola, and W. H. Moy. 2022. “On Designing an Optimal SPRT Control Chart with Estimated Process Parameters Under Guaranteed In-Control Performance.” Computers & Industrial Engineering 174 (12): Article 108806. https://doi.org/10.1016/j.cie.2022.108806.
  • Wald, A. 1947. Sequential Analysis. New York: John Wiley & Sons.
  • Wu, Z., M. Shamsuzzaman, and E. S. Pan. 2004. “Optimization Design of Control Charts Based on Taguchi’s Loss Function and Random Process Shifts.” International Journal of Production Research 42 (2): 379–390. https://doi.org/10.1081/00207540310001614169
  • Wu, Z., and Y. Tian. 2005. “Weighted-Loss-Function CUSUM Chart for Monitoring Mean and Variance of a Production Process.” International Journal of Production Research 43 (14): 3027–3044. https://doi.org/10.1080/00207540500057639
  • Wu, Z., M. Yang, M. B. C. Khoo, and F. J. Yu. 2010. “Optimization Designs and Performance Comparison of Two CUSUM Schemes for Monitoring Process Shifts in Mean and Variance.” European Journal of Operational Research 205 (1): 136–150. https://doi.org/10.1016/j.ejor.2009.12.005
  • Zhang, S., and Z. Wu. 2007. “A CUSUM Scheme with Variable Sample Sizes for Monitoring Process Shifts.” The International Journal of Advanced Manufacturing Technology 33 (9): 977–987. https://doi.org/10.1007/s00170-006-0544-0.
  • Zhang, J., C. Zou, and Z. Wang. 2010. “A Control Chart Based on Likelihood Ratio Test for Monitoring Process Mean and Variability.” Quality and Reliability Engineering International 26 (1): 63–73. https://doi.org/10.1002/qre.1036

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.