910
Views
0
CrossRef citations to date
0
Altmetric
Research Article

A flexible planning approach for integrated lot sizing and rework planning with random proportion of defective products

&
Received 26 Apr 2023, Accepted 27 Jan 2024, Published online: 16 Feb 2024

References

  • Akçalı, E., and S. Çetinkaya. 2011. “Quantitative Models for Inventory and Production Planning in Closed-loop Supply Chains.” International Journal of Production Research 49 (8): 2373–2407. https://doi.org/10.1080/00207541003692021.
  • Aloulou, M. A., A. Dolgui, and M. Y. Kovalyov. 2014. “A Bibliography of Non-deterministic Lot-sizing Models.” International Journal of Production Research 52 (8): 2293–2310. https://doi.org/10.1080/00207543.2013.855336.
  • Asadkhani, J., H. Mokhtari, and S. Tahmasebpoor. 2022. “Optimal Lot-sizing Under Learning Effect in Inspection Errors with Different Types of Imperfect Quality Items.” Operational Research – An International Journal 22 (3): 2631–2665.
  • Barzoki, M. R., M. Jahanbazi, and M. Bijari. 2011. “Effects of Imperfect Products on Lot Sizing with Work in Process Inventory.” Applied Mathematics and Computation 217 (21): 8328–8336. https://doi.org/10.1016/j.amc.2011.03.023.
  • Biswas, P., and B. R. Sarker. 2008. “Optimal Batch Quantity Models for a Lean Production System with in-cycle Rework and Scrap.” International Journal of Production Research 46 (23): 6585–6610. https://doi.org/10.1080/00207540802230330.
  • Bookbinder, J. H., and J. Y. Tan. 1988. “Strategies for the Probabilistic Lot-sizing Problem with Service-level Constraints.” Management Science 34 (9): 1096–1108. https://doi.org/10.1287/mnsc.34.9.1096.
  • Brahimi, N, N. Absi, S. Dauzère-Pérès, and A. Nordli. 2017. “Single-item Dynamic Lot-sizing Problems: An Updated Survey.” European Journal of Operational Research 263 (3): 838–863. https://doi.org/10.1016/j.ejor.2017.05.008.
  • Brahimi, N., S. Dauzère-Pérès, N. M. Najid, and A. Nordli. 2006. “Single Item Lot Sizing Problems.” European Journal of Operational Research 168 (1): 1–16. https://doi.org/10.1016/j.ejor.2004.01.054.
  • Buschkühl, L., F. Sahling, S. Helber, and H. Tempelmeier. 2010. “Dynamic Capacitated Lot-sizing Problems: a Classification and Review of Solution Approaches.” OR Spectrum 32 (2): 231–261. https://doi.org/10.1007/s00291-008-0150-7.
  • Cunha, J. O., H. H. Kramer, and R. A. Melo. 2019. “Effective Matheuristics for the Multi-item Capacitated Lot-sizing Problem with Remanufacturing.” Computers & Operations Research 104:149–158. https://doi.org/10.1016/j.cor.2018.12.012.
  • Cunha, J. O., and R. A. Melo. 2016. “A Computational Comparison of Formulations for the Economic Lot-sizing with Remanufacturing.” Computers & Industrial Engineering 92:72–81. https://doi.org/10.1016/j.cie.2015.11.024.
  • Devoto, C., E. Fernández, and P. Piñero. 2021. “The Economic Lot-sizing Problem with Remanufacturing and Inspection for Grading Heterogeneous Returns.” Journal of Remanufacturing 11 (1): 71–87. https://doi.org/10.1007/s13243-020-00089-5.
  • Dolgui, A., M. Y. Kovalyov, and K. Shchamialiova. 2011. “Multi-product Lot-sizing and Sequencing on a Single Imperfect Machine.” Computational Optimization and Applications 50 (3): 465–482. https://doi.org/10.1007/s10589-010-9346-2.
  • Fang, C., X. Liu, P. M. Pardalos, J. Long, J. Pei, and C. Zuo. 2017. “A Stochastic Production Planning Problem in Hybrid Manufacturing and Remanufacturing Systems with Resource Capacity Planning.” Journal of Global Optimization 68 (4): 851–878. https://doi.org/10.1007/s10898-017-0500-6.
  • Flapper, S. D. P., J. C. Fransoo, R. A. C. M. Broekmeulen, and K. Inderfurth. 2002. “Planning and Control of Rework in the Process Industries: a Review.” Production Planning & Control 13 (1): 26–34. https://doi.org/10.1080/09537280110061548.
  • Florian, M., J. K. Lenstra, and A. H. G. R. Kan. 1980. “Deterministic Production Planning: Algorithms and Complexity.” Management Science 26 (7): 669–679. https://doi.org/10.1287/mnsc.26.7.669.
  • Giglio, D., M. Paolucci, and A. Roshani. 2017. “Integrated Lot Sizing and Energy-efficient Job Shop Scheduling Problem in Manufacturing/remanufacturing Systems.” Journal of Cleaner Production 148:624–641. https://doi.org/10.1016/j.jclepro.2017.01.166.
  • Goerler, A., E. Lalla-Ruiz, and S. Voß. 2020. “Late Acceptance Hill-climbing Matheuristic for the General Lot Sizing and Scheduling Problem with Rich Constraints.” Algorithms 13 (6): 138. https://doi.org/10.3390/a13060138.
  • Goerler, A., and S. Voß. 2016. “Dynamic Lot-sizing with Rework of Defective Items and Minimum Lot-size Constraints.” International Journal of Production Research 54 (8): 2284–2297. https://doi.org/10.1080/00207543.2015.1070970.
  • Haojie, Y., M. Lixin, and Z. Canrong. 2017. “Capacitated Lot-Sizing Problem with One-way Substitution: A Robust Optimization Approach.” In 2017 3rd International Conference on Information Management (ICIM), Chengdu, China, 159–163. https://doi.org/10.1109/INFOMAN.2017.7950367.
  • Harris, F. W. 1913. “How Many Parts to Make At Once.” Factory, The Magazine of Management 10 (2): 135–136, 152. Reprint in: Operations Research (1990), 38(6), 947–950
  • Helber, S., K. Inderfurth, F. Sahling, and K. Schimmelpfeng. 2018. “Flexible Versus Robust Lot-scheduling Subject to Random Yield and Deterministic Dynamic Demand.” IISE Transactions 50 (3): 217–229. https://doi.org/10.1080/24725854.2017.1357089.
  • Helber, S., and F. Sahling. 2010. “A Fix-and-optimize Approach for the Multi-level Capacitated Lot Sizing Problem.” International Journal of Production Economics 123 (2): 247–256. https://doi.org/10.1016/j.ijpe.2009.08.022.
  • Helber, S., F. Sahling, and K. Schimmelpfeng. 2013. “Dynamic Capacitated Lot Sizing with Random Demand and Dynamic Safety Stocks.” OR Spectrum 35 (1): 75–105. https://doi.org/10.1007/s00291-012-0283-6.
  • Hilger, T., F. Sahling, and H. Tempelmeier. 2016. “Capacitated Dynamic Production and Remanufacturing Planning Under Demand and Return Uncertainty.” OR Spectrum 38 (4): 849–876. https://doi.org/10.1007/s00291-016-0441-3.
  • Inderfurth, K., G. Lindner, and N. P. Rachaniotis. 2005. “Lot Sizing in a Production System with Rework and Product Deterioration.” International Journal of Production Research 43 (7): 1355–1374. https://doi.org/10.1080/0020754042000298539.
  • Jamal, A. M. M., B. R. Sarker, and S. Mondal. 2004. “Optimal Manufacturing Batch Size with Rework Process At a Single-stage Production System.” Computers & Industrial Engineering 47 (1): 77–89. https://doi.org/10.1016/j.cie.2004.03.001.
  • Kang, C. W., M. Ullah, B. Sarkar, I. Hussain, and R. Akhtar. 2017. “Impact of Random Defective Rate on Lot Size Focusing Work-in-process Inventory in Manufacturing System.” International Journal of Production Research 55 (6): 1748–1766. https://doi.org/10.1080/00207543.2016.1235295.
  • Kang, C. W., M. Ullah, M. Sarkar, M. Omair, and B. Sarkar. 2019. “A Single-stage Manufacturing Model with Imperfect Items, Inspections, Rework, and Planned Backorders.” Mathematics 7 (5): 446. https://doi.org/10.3390/math7050446.
  • Karimi, B., S. M. T. Fatemi Ghomi, and J. M. Wilson. 2003. “The Capacitated Lot Sizing Problem: a Review of Models and Algorithms.” Omega 31 (5): 365–378. https://doi.org/10.1016/S0305-0483(03)00059-8.
  • Kirste, M. 2017. Dynamic Lot Sizing Problems with Stochastic Production Output. Norderstedt: Books on Demand.
  • Kleywegt, A. J., A Shapiro, and T. Homem-de-Melo. 2002. “The Sample Average Approximation Method for Stochastic Discrete Optimization.” SIAM Journal on Optimization 12 (2): 479–502. https://doi.org/10.1137/S1052623499363220.
  • Lay, G., C. Dreher, and S. Kinkel. 1996. “Neue Produktionskonzepte leisten einen Beitrag zur Sicherung des Standorts Deutschland.” Positiver Zusammenhang zwischen der Verwirklichung neuer Konzepte und der Steigerung betrieblicher Leistungskennziffern belegt. Bulletins ‘German Manufacturing Survey’ (1), Fraunhofer Institute for Systems and Innovation Research (ISI).
  • Levitan, R. E. 1960. “The Optimum Reject Allowance Problem.” Management Science 6 (2): 172–186. https://doi.org/10.1287/mnsc.6.2.172.
  • Li, Y., J. Chen, and X. Cai. 2007. “Heuristic Genetic Algorithm for Capacitated Production Planning Problems with Batch Processing and Remanufacturing.” International Journal of Production Economics 105 (2): 301–317. https://doi.org/10.1016/j.ijpe.2004.11.017.
  • Llewellyn, R. W. 1959. “Order Sizes for Job Lot Manufacturing.” Journal of Industrial Engineering 10 (3): 176–180.
  • Pan, Z., J. Tang, and O. Liu. 2009. “Capacitated Dynamic Lot Sizing Problems in Closed-loop Supply Chain.” European Journal of Operational Research 198 (3): 810–821. https://doi.org/10.1016/j.ejor.2008.10.018.
  • Pflug, G. C., and A. Pichler. 2014. Multistage Stochastic Optimization. Heidelberg: Springer Cham.
  • Retel Helmrich, M. J., R. Jans, W. van den Heuvel, and A. P. M. Wagelmans. 2014. “Economic Lot-sizing with Remanufacturing: Complexity and Efficient Formulations.” IIE Transactions 46 (1): 67–86. https://doi.org/10.1080/0740817X.2013.802842.
  • Roshani, A., M. Paolucci, D. Giglio, M. Demartini, F. Tonelli, and M. A. Dulebenets. 2023. “The Capacitated Lot-sizing and Energy Efficient Single Machine Scheduling Problem with Sequence Dependent Setup Times and Costs in a Closed-loop Supply Chain Network.” Annals of Operations Research 321 (1–2): 469–505. https://doi.org/10.1007/s10479-022-04783-4.
  • Rudert, S., and U. Buscher. 2022. “Heuristics for the Single-Item Dynamic Lot-Sizing Problem with Rework of Internal Returns.” In Computational Logistics, ICCL 2022. Vol. 13557 of Lecture Notes in Computer Science, edited by J. de Armas, H. Ramalhinho, and S. Voß, 425–440. Barcelona: Springer Cham.
  • Sahling, F. 2010. Mehrstufige Losgrößenplanung Bei Kapazitätsrestriktionen. Wiesbaden: Gabler Verlag. https://doi.org/10.1007/978-3-8349-8708-2.
  • Sahling, F. 2013. “A Column-Generation Approach for a Short-Term Production Planning Problem in Closed-Loop Supply Chains.” BuR – Business Research 6 (1): 55–75. https://doi.org/10.1007/BF03342742.
  • Sahling, F. 2016. “Integration of Vendor Selection Into Production and Remanufacturing Planning Subject to Emission Constraints.” International Journal of Production Research 54 (13): 3822–3836. https://doi.org/10.1080/00207543.2016.1148276.
  • Saliby, E. 1990. “Descriptive Sampling: a Better Approach to Monte Carlo Simulation.” Journal of the Operational Research Society 41 (12): 1133–1142. https://doi.org/10.1057/jors.1990.180.
  • Sarkar, B., L. E. Cárdenas-Barrón, M. Sarkar, and M. L. Singgih. 2014. “An Economic Production Quantity Model with Random Defective Rate, Rework Process and Backorders for a Single Stage Production System.” Journal of Manufacturing Systems 33 (3): 423–435. https://doi.org/10.1016/j.jmsy.2014.02.001.
  • Schulz, T. 2011. “A New Silver-Meal Based Heuristic for the Single-item Dynamic Lot Sizing Problem with Returns and Remanufacturing.” International Journal of Production Research 49 (9): 2519–2533. https://doi.org/10.1080/00207543.2010.532916.
  • Suzanne, E., N. Absi, and V. Borodin. 2020. “Towards Circular Economy in Production Planning: Challenges and Opportunities.” European Journal of Operational Research 287 (1): 168–190. https://doi.org/10.1016/j.ejor.2020.04.043.
  • Syed Ali, S. A., M. Doostmohammadi, K. Akartunalı, and R. van der Meer. 2018. “A Theoretical and Computational Analysis of Lot-sizing in Remanufacturing with Separate Setups.” International Journal of Production Economics 203:276–285. https://doi.org/10.1016/j.ijpe.2018.07.002.
  • Taleizadeh, A. A., L. E. Cárdenas-Barrón, and B. Mohammadi. 2014. “A Deterministic Multi Product Single Machine EPQ Model with Backordering, Scraped Products, Rework and Interruption in Manufacturing Process.” International Journal of Production Economics 150:9–27. https://doi.org/10.1016/j.ijpe.2013.11.023.
  • Tempelmeier, H. 2011. “A Column Generation Heuristic for Dynamic Capacitated Lot Sizing with Random Demand Under a Fill Rate Constraint.” Omega 39 (6): 627–633. https://doi.org/10.1016/j.omega.2011.01.003.
  • Tempelmeier, H. 2013. “Stochastic Lot Sizing Problems.” In Handbook of Stochastic Models and Analysis of Manufacturing System Operations. Vol. 192 of International Series in Operations Research & Management Science, edited by J. M. Smith, B. Tan, 313–344. New York, NY: Springer.
  • Teunter, R. H., Z. P. Bayindir, and W. van den Heuvel. 2006. “Dynamic Lot Sizing with Product Returns and Remanufacturing.” International Journal of Production Research 44 (20): 4377–4400. https://doi.org/10.1080/00207540600693564.
  • van Zyl, A., and O. Adetunji. 2022. “A Lot Sizing Model for Two Items with Imperfect Manufacturing Process, Time Varying Demand and Return Rates, Dependent Demand and Different Quality Grades.” Journal of Remanufacturing 12 (2): 227–252. https://doi.org/10.1007/s13243-022-00110-z.
  • Vladimirou, H., and S. A. Zenios. 1997. “Stochastic Programming and Robust Optimization.” In Advances in Sensitivity Analysis and Parametric Programming. Vol. 6. of International Series in Operations Research & Management Science, edited by T. Gal, H. J. Greenberg, 395–447. Boston, MA: Springer.
  • Widyana, G. A., and H. M. Wee. 2012. “An Economic Production Quantity Model for Deteriorating Items with Multiple Production Setups and Rework.” International Journal of Production Economics 138 (1): 62–67. https://doi.org/10.1016/j.ijpe.2012.02.025.
  • Zhang, Z.-H., H. Jiang, and X. Pan. 2012. “A Lagrangian Relaxation Based Approach for the Capacitated Lot Sizing Problem in Closed-loop Supply Chain.” International Journal of Production Economics 140 (1): 249–255. https://doi.org/10.1016/j.ijpe.2012.01.018.
  • Zhang, J., X. Liu, and Y. L. Tu. 2011. “A Capacitated Production Planning Problem for Closed-loop Supply Chain with Remanufacturing.” The International Journal of Advanced Manufacturing Technology 54 (5–8): 757–766. https://doi.org/10.1007/s00170-010-2948-0.
  • Zouadi, T., A. Yalaoui, and M. Reghioui. 2018. “Hybrid Manufacturing/remanufacturing Lot-sizing and Supplier Selection with Returns, Under Carbon Emission Constraint.” International Journal of Production Research 56 (3): 1233–1248. https://doi.org/10.1080/00207543.2017.1412524.