References
- BUFFA , E. S. , 1961 , Pacing effects in production lines , J. Ind. Engng. , November-December , p. 383 .
- BUXEY , G. M. , 1975 , The operation of fixed item, conveyor-paced, assembly lines , Part 2 , B.P.I.C.S. News , 1 , 4 .
- BUXEY , G. M. , SLACK , N. D. , and WILD , R. , 1973 , Production flowline system design—a review , A.I.I.E. Trans. , 5 , 37 .
- CONRAD , R. , 1955 , Setting the pace , Manager , September , p. 664 .
- DAVIS , L. E. , 1966 , Pacing effects on manned assembly lines , Int. J. Prod. Res. , 4 , 171 .
- DUDLEY , N. A. , 1963 , Work-time distributions , Int. J. Prod. Res. , 2 , 137 .
- FRANKS , I. T. , GILLIES , G. J. , and SURY , R. J. , 1969 , Buffer stocks in conveyor-based work , Work Study Mgmt. Serv. , February , 13 , 78 .
- FRANKS , I. T. , and SURY , R. J. , 1966 , The performance of operators in conveyor-paced work , Int. J. Prod. Res. , 5 , 97 .
- PAYNE , S. , SLACK , N. , and WILD , R. , 1972 , A note on the operating characteristics of ‘balanced’ and ‘unbalanced’ production flow lines , Int. J. Prod. Res. , 10 , 93 .
- SADJADI , D. , 1975 , The operating characteristics of removable item conveyor paced assembly lines , unpublished Ph.D Thesis , University of Bradford .
- SLACK , N. D. , 1973 , Assembly lines—some determinants of unpaced operator efficiency , Prod. Engr. , June , 52 , 215 .
- SURY , R. J. , 1964 , An industrial study of paced and unpaced operator performance in a single stage work task , Int. J. Prod. Res. , 3 , 91 ; 1965, The simulation of a paced single stage work task, Int. J. Prod. Res., 4, 125; 1971, Aspects of assembly line balancing, Int. J. Prod. Res., 9, 501 .