References
- CROWSTON , W. B. , WAGNER , M. , and WILLIAMS , J. P. , 1973 , Economic lot size determination in multi-stage assembly system , MgmtSci. , 19 , 517 .
- GOYAL , S. K. , 1976 , Note on Manufacturing cycle time determination for a multistage economic production quantity model , Mgmt Sci. , 23 , 332 .
- JENSEN , P. A. , and KAHN , H. A. , 1972 , Scheduling in a multi-stage production system with set-up and inventory costs , A.I.I.E. Trails. , 4 , 126 .
- SZENDROVITS , ANDREW W. , 1975 , Manufacturing cycle time determination for a multi-stage production quantity model , Mgmt Sci. , 22 , 298 ; 1976, On the optimalitv of sub-batch sizes for a multi-stage EPQ model-a rejoinder, Ibid., 23,324 .
- TAHA , HAMDY A. , SKEITH , HAMDY W. , 1970 , The economic lot sizes in multistage production systems , A.I.I.E. Trans. , 2 , 157 .