References
- BUZACOTT , J. A. , 1967 , Automatic transfer lines with buffer stocks , Int. J. Prod. Res. , 5 , 183 ; 1971, The role of inventory banks in flow-line production systems, Ibid., 9, 425; 1972, The effect of station breakdowns and random processing times on the capacity of flow lines with in-process storage. Trans. Am. Inst. Industrial Engnrs, 4, 308 .
- BUZACOTT , J. A. , and HANIFIN , L.E. , 1978 , Models of automatic transfer lines with inventory banks a review and comparison , Trans. Am. Inst. Industrial Engnrs , 10 , 197 .
- DUDICK , A. , 1978 , Assigning a repairman in a production system with buffer stock , TIMS/ORSA Meeting , New York City , 1–3 May , 1978 .
- HUNT , G. C. , 1956 , Sequential arrays of waiting lines , Opns Res. , 4 , 674 .
- IGNAL , E. , and SILVER , A. , 1977 , The output of a two-stage system with unreliable machines and limited storage , Trans. Am. Inst. Industrial Engnrs , 9 , 183 .
- MASSO , J. , and SMITH , M. L. , 1974 , Interstage storages for three stage line subject to stochastic failures , Trans. Am. Inst. Industrial Engnrs , 6 , 354 .
- OKAMURA , K. , and YAMASHINA , H. , 1977 , Analysis of the effect of buffer storage capacity in transfer line systems , Trans. Am. Inst. Industrial Engnrs , 9 , 126 .
- RAO , N. P. , 1975 , Two-stage production systems with intermediate storage , Trans. Am. Inst. Industrial Engnrs , 7 , 414 .
- SHESKIN , T. J. , 1976 , Allocation of interstage storage along an automatic production line , Trans. Am. Inst. Industrial Engnrs , 8 , 146 .