References
- BURNS , F. , and ROOKER , J. , 1976 , Johnson's three-machine flow shop conjecture , Ops Res. , 24 , 578 .
- BURNS , F. , and ROOKER , J. , 1978 , Three stage flow shops with regressive second stage , Ops Res. , 26 , 207 .
- CAMPBELL , H. G. , DUDEK , R. A. , and SMITH , ML. , 1970 , A heuristic algorithm for them job in machine sequencing problem , Mgmt Set. , 16 , B630 .
- JOHNSON , S. M. , 1954 , Optimal two- and three-stage production schedules with setup timesincluded , Nav. Res. Logisl. Q. , 1 , 61 .
- LAGEWEG , B. J. , LENSTRA , J. K. , RINNOOV KAN , A. H. G. , 1978 , A general boundingscheme for the permutation flow shop , Ops Res. , 26 , 53 .
- SMITH , M. L. , PASWALKAR , S. S. , DUDEK , R. A. , 1976 , Flow shop sequencing problemswith ordered processing time matrices a general ease , Nav. Res. Loyist. Q. , 23 , 481 .
- SZWARC , W. , 1977 , Optimal two machine orderings in the 3xn flow shop problem , Ops Res. , 25 , 70 .
- SZWARC , W. , and HUTCHINSON , G. K. , 1977 , Johnson's approximate method for the 3 xn job shop problem , Nav. Res. Loyist. Q. , 24 , 153 .